İsmet V. DÜNDAR, Çevre Müdürüİnci KARAKAYA, Çevre Uzmanı

Ankara, 8 Nisan, 2019

Trans Anatolian Natural Gas Pipeline Project

Proje Kapsamı

(Phase 0)(Phase 1)

48”

Trans Anatolian Natural Gas Pipeline Project

(1.340 km) (476 km)

Boruhattı (1.850 km)

Gaz İletim Kapasitesi

İstasyonlar (for 31 bcma)

(2x17.6 km)

Proje Özellikleri

Başarılan Önemli Kilometre Taşları

• Faz 0 - Eskişehir’e Gaz (1.340 km uzunlukta 56” çaplı boru hattı + MS1 + MS2 +

39 BVSs + 6 PSs) mekanik olarak 25.12.2017 tarihinde tamamlanmıştır.

• Boru hattının “Hat Dolum ve Devreye Alma” süreci 23.01.2018 tarihinde, Ticari

operasyon ise Faz 0 için 01.07.2018 itibariyle başlamıştır.

Proje’den Rakamlar

6

Yükleme yapan Tır:

66.632

Kaynak yapılan boru sayısı:

131.620 (1,31 Mton)

Nehir geçişi sayısı: 6.834

En dik eğim:

30% KP 14 (Ilgar Dağı)

En yüksek nokta: 2.760 m

KP 621(Kızıldağ - Erzincan)

Boru hattında en derin nokta:

- 65 m (Dardanelle)

• 100.000.000+ adam-saat iş

• 13.000.000 metreküp kazı hacmi

• 222.115.414 km yol kat edildi (Mart 2019 sonu itibariyle)

• Yönlendirilebilir Yatay Sondaj Metodu ile 1.103 metrelik

Sakarya Nehir Geçişi, 56” çapındaki boru ile bu yöntemle

Avrupa’da yapılan en uzun nehir geçişi oldu.

• Gürcistan sınırındaki Türkgözü köyünden

Eskişehir’e kadar 56” çapındaki 1.340 kilometrelik bölüm ilk

kaynağın başlamasından 858 gün sonra tamamlandı.

• Tek bir günde 10 kilometre 56” boru hattı indirilerek rekor

kırıldı.

• Tek bir ekip ile bir günde 145 adet 56” ana hat borusu

kaynağı (yaklaşık 2 km/gün) ile rekor kırıldı.

(CRC World Record)

TANAP Rekorların Projesi

7

Trans Anatolian Natural Gas Pipeline Project

Coğrafi ve İklimsel Koşullar

Trans Anatolian Natural Gas Pipeline Project

• IGA ve HGA

• Yasal Yükümlülükler/ Legal

Requirements

• IFC Kılavuzları

• AB Direktifleri

• En iyi uygulamalar/ Best Practices

ÇEVRE STANDARTLARI / ENVIRONMENTAL STANDARDS

Trans Anatolian Natural Gas Pipeline Project

Hükümetlerarası Anlaşma / IGA 26.06.2012TÜRKİYE CUMHURİYETİ HÜKÜMETİ İLE AZERBAYCAN CUMHURİYETİ HÜKÜMETİ

10

Proje Gereklilikleri

http://www.tanap.com/kurumsal/anlasmalarimiz/

Trans Anatolian Natural Gas Pipeline Project

TNP-REP-ENV-GEN-001 -Türkçe Versiyon- Çevre ve Şehircilik Bakanlığı Onay

TNP-REP-ENV-GEN-002 - İngilizce Versiyon

24.07.2014 ÇED Olumlu Kararı - Bakanlık Onayı

ÇSED (Çevresel ve Sosyal Etki Değerlendirme)ESIA (Environmental and Social Impact Assessment)

Trans Anatolian Natural Gas Pipeline Project

• Projenin Çevresel Boyutları - Değerlendirme

• Etkiyi önleme ve azaltma önlemleri

• İleride yapılması tavsiye edilen çalışmalar

• Çevresel Yönetim Planları (Müteahhitler İçin Klavuz)

• Taahhütler Sicili / Commitments Registers

ÇSED (Çevresel ve Sosyal Etki Değerlendirme)ESIA (Environmental and Social Impact Assessment

Trans Anatolian Natural Gas Pipeline Project

İhale Süreçlerinde Yer Verilen, ÇevreYönetimi ile İlgili Gereklilik ve Önlemler

• EIA/ESIA

• BAP/Biyoçeşitlilik Eylem Planı

• TANAP’ın ÇYS Dokümanları

– ÇED Ekinde Yer Alan Yönetim Planları

• Construction Impacts Management Plan (CIMP)

• Aggregates Management Plan (AMP)

• Traffic (Access) Management Plan (TMP)

• Cultural Heritage Management Plan (CHM)

• Erosion, Reinstatement and Landscaping Plan (ERLP)

• Pollution Prevention Plan (PPP)

• Waste Management Plan (WMP)

• Emergency Response Plan (ERP)

Trans Anatolian Natural Gas Pipeline Project

Trans Anatolian Natural Gas Pipeline Project

Biyoçeşitlilik ve Arkeoloji Çalışmaları

11 Newly Introduced Species to Science:

10 Fauna (arthropods) + 1 Flora

246 Sampling stations for Terrestrial Flora Studies

133 Sampling Stations for Amphibian Species

243 Sampling Stations for Terrestrial Invertebrates

189 Sampling Stations for Freshwater

Fish and Macro invertebrates studies

Biodiversity Action Plan covering 67 Terrestrial and 27 Freshwater Critical Habitats/Biodiversity Offset Strategy

ECOLOGICAL STUDIES ARCHAEOLOGICAL STUDIES

106 Newly Discovered Archaeological Sites During Route Selection

48 New Archaeological Sites During Construction

Trans Anatolian Natural Gas Pipeline Project

İnşaat DönemindeBiyoçeşitliliğin Korunması

BiYOÇEŞİTLİLİK EYLEM PLANIBIODIVERSITY ACTION PLAN

• to identify the species and habitats, considering the priorities of national, international and local species and habitats and consequently

• to determine the applicable and area-specific actions to protect and conserve the biodiversity on the 36 m ROW

• site specific mitigation measures for each critical area.

27 Freshwater Critical Habitats67 Terresterial Critical Habitats

Trans Anatolian Natural Gas Pipeline Project

Trans Anatolian Natural Gas Pipeline Project

Trans Anatolian Natural Gas Pipeline Project

Kritik Alanlar /Critical HabitatsCH 28

Trans Anatolian Natural Gas Pipeline Project

Bellevalia crassa

Trans Anatolian Natural Gas Pipeline Project

Proje Biyoçeşitlilik Stratejisi

/ Önlemler Hiyerarşisi

Trans Anatolian Natural Gas Pipeline Project

3. Taraf İzleme ÇSED Raporu İzlemesi- Günlük Raporlar- Aylık Raporlar- Çevre ve Şehircilik Bakanlığı İçin 3 Aylık İzleme

Raporları- Bankalar için 3 Aylık İzleme Raporları- İki haftalık toplantılar ÇINAR-TANAP

ÇSED (Çevresel ve Sosyal Etki Değerlendirme)ESIA (Environmental and Social Impact Assessment

İzleme

Trans Anatolian Natural Gas Pipeline Project

Entegre Yönetim SistemiÇevre Gözlem ve Denetimleri

Çevre Konuları / Environmental Issues

Korunan ekolojik alanların/türlerin zarar görmesi/ Damage to protected areas/species

Diğer / Others

Arkeolojik alanların zarar görmesi/ Damage to archaeological sites

Hava Emisyonları / Air emissions

Su Kaynaklarının Kirletilmesi / Water Pollution

Toprak kirliliği veya toprak verimliliğin azaltılması / Soil pollution-degradation of fertility

Atıkların kontrolsüz yönetimi/ Uncontrolled w aste management

Kaynakların gereksiz kullanımı/Excessive use of resources (energy, etc)

Sızıntı ve döküntüler/Spills

Safety & Environment Inspections and Observations Procedure TNP-PCD-HSE-GEN-004

Trans Anatolian Natural Gas Pipeline Project

Entegre Yönetim SistemiÇevre Gözlem ve Denetimleri

Çevresel Performans Göstergeleri

Trans Anatolian Natural Gas Pipeline Project

Üst Toprak ve Alt Toprak Yönetimi

İnşaat Dönemi- ÖnlemlerErozyon Kontrolü - Eski Haline Getirme

Trans Anatolian Natural Gas Pipeline Project

İnşaat Dönemi- Önlemler

• Agrega YönetimiSadece Lisansı olan tesisler

• Trafik YönetimiSadece Euro 3 (emisyonu düşük) ve üzeri araçlarSadece belirlenen “Access Road”Güzergah Risk DeğerlendirmeYakıt tüketimi/km kayıt

Trans Anatolian Natural Gas Pipeline Project

Erozyon KontrolüGeçici Erozyon Kontrol YapılarıTemporary ditch breakersPlugs of unexcavated material left in the trenchStumps left in place wherever possible Drainage channels on all longitudinal and transverse slopes Slope breakersSediman KontrolüSilt Fence, Wooden Fence or Straw Bale BarriersKalıcı Erozyon Kontrol YapılarıThere are three components to stormwater management: erosion control, runoff control, and sediment control. The following devices will be applicable for the project. Further details on these devices will be provided in the Project Reinstatement and Erosion Control Specification and project typical drawings.• Slope Breakers (Interceptor Cross Drains)• Gabions• Ditch (Trench) Breakers• Erosion (Jute) Matting• Crushed Rock• Lined Chutes and Vegetated Waterways• Gully Remediation• Reno-Mattress Systems• MacMat Systems (by Maccaferri)• Rock-filled gabion

İnşaat Dönemi- Önlemler

Trans Anatolian Natural Gas Pipeline Project

Nehir Geçişleri

• Method statements detailing all construction and restoration procedures for all river crossings.

• The disturbed portion of the river bed shall be returned to pre-construction contours where possible

• The backfill over the pipe shall be at least as scour-resistant as the original bed material.

• River banks shall be restored to their original condition and contours. Where not possible, Contractor shall propose site specific solutions with engineering justification;

• Erosion and soil stabilization measures shall not alter the pre-construction hydrologic and environmental regimes including natural erosion of the rivers.

• Erosion and sediment control devices shall be installed and maintained until revegetation and/or selected stabilization measures is sufficiently established

• Where erosion matting and/or bio-restoration will not achieve the project reinstatement performance requirements, erosion protection using geotextile and riprap shall be used.

• Permanent scour protection measures consist of geotextile plus rip rap, and/ or rock-filled gabion.

İnşaat Dönemi- Önlemler

Trans Anatolian Natural Gas Pipeline Project

İnşaat Dönemi Önlemleri - Nehir Geçişleri

Survey Silt fences

Turbid Water

Storage Trench Excavation Mud

Mud/Soil Fence

Temporary Crossing Road

Aggregate

RoW wider for Xing Works

HS Requirement for Xings

Keson / Crossing Pipe

Clear Water

Trench - Xing

Trans Anatolian Natural Gas Pipeline Project

Biorestoration«Reinstatement and Erosion Control Specifications» provides the minimum requirements for biorestoration. Erosion class of 3 of better (<10 t/ha/year) shall be achieved for reinstatement along the pipeline ROW. In agricultural and other developed areas Contractor shall leave the land in the condition specified in the pre-entry agreements. Undeveloped areasMinimum 70% percentage cover of ground vegetation in first year of vegetation.

Reforestation StrategySuccessfully replace every tree felled during ROW clearance.

Protection of Planted MaterialsProtection the seeds and plants from damage from livestock or wild animals. E.g.•security patrols and procedures; •liaison and agreements with livestock managers; •erection of stock-proof fencing (designed/installed to discourage theft) along the project area boundaries; •supplement boundary fencing by internal area fencing to give double protection to particular areas;

Aftercare, Monitoring and Corrective ActionAftercare (watering, further application of fertilizer, weed control, etc.) during the Contract maintenance period (2 years after reinstatement).Contractor shall examine the biorestoration process of each section every three months after planting and report against the performance

İnşaat Dönemi- Önlemler

Trans Anatolian Natural Gas Pipeline Project

LOT-1

KP 282 – KP 283

KP 286 – KP 288

LOT 1

Trans Anatolian Natural Gas Pipeline Project

LOT-1

KP 286 – KP 288

KP 288 – KP 289

Trans Anatolian Natural Gas Pipeline Project

LOT-1 KP-3 - KP-4 (CH1)

CH1

Trans Anatolian Natural Gas Pipeline Project

LOT-1 KP-4 - KP-5 (CH2)

Trans Anatolian Natural Gas Pipeline Project

LOT-2

KP-499 – KP-500

35

KP-506+882 (RVX2_0012) FCH9

LOT 2

Trans Anatolian Natural Gas Pipeline Project

LOT-2

Permanent Slope Breaker

Permanent Slope Breaker

Trans Anatolian Natural Gas Pipeline Project

LOT-2

KP-507 – KP-508

KP-501 – KP-502

Trans Anatolian Natural Gas Pipeline Project

LOT-2

KP 502+733 (RVX2_0010)

KP 502+868 (RVX2_0011)

Trans Anatolian Natural Gas Pipeline Project

LOT-2

Dikilmişfideler Dikilmiş

fideler

KP-648+850 (RVX2_0017)

KP-648+850 (RVX2_0017) KP-648+850 (RVX2_0017)

Trans Anatolian Natural Gas Pipeline Project

LOT-2

KP-654 – KP-655 (CH32)

Trans Anatolian Natural Gas Pipeline Project

LOT-2

CH46

Trans Anatolian Natural Gas Pipeline Project

LOT-3

LOT3

42

KP-1043 – KP-1044

KP-1041 - KP-1042

Trans Anatolian Natural Gas Pipeline Project

LOT-3

KP-1081 – KP-1082

KP-1079 - KP-1080

Trans Anatolian Natural Gas Pipeline Project

LOT-3

KP-1204+779 (RVX3B_0128)

KP-1204+779 (RVX3B_0128)

Trans Anatolian Natural Gas Pipeline Project

LOT-3

KP-1179 – KP-1180

KP-1189 – KP-1190

Trans Anatolian Natural Gas Pipeline Project

LOT-3

KP-1155 – KP-1156

CH55

Trans Anatolian Natural Gas Pipeline Project

LOT-4

LOT 4

47

Derivation channel - KP-1448+670 (RVX2_0035)

KP-1448+670 (RVX2_0035)

Trans Anatolian Natural Gas Pipeline Project

LOT-4

LOT 4

48

Geçici Eğim Kırıcılar

Jüt Hasır Uygulaması

Trans Anatolian Natural Gas Pipeline Project

İnşaat Dönemi- Örnekler

Taşma alanında eğimkırıcılar ve biorestoration

çalışması yapılmamışTaşma

Trans Anatolian Natural Gas Pipeline Project

Marmara Denizi Geçişi

Çevresel Çalışmaları

Trans Anatolian Natural Gas Pipeline Project2

OFFSHORE KISMI – ÇEVRE ÇALIŞMALARI

• Yapılan Çevre Çalışmaları :

- ÇSED Mevcut Durum Belirleme Çalışmaları

- Sediment Bulanıklık Modellemesi

- Sediment Kalitesinin İncelenmesi

- Su Kalitesinin İncelenmesi

- Yüzey Sedimenti Metal Seviyesinin İzlenmesi

- Bentik Habitatın İzlenmesi

- İnşaat Öncesi Saha İncelemesi

- Yüklenici İnşaat Firması tarafından yaptırılan 3. Taraf Çevresel İzleme Programı

(İnşaat öncesi- İnşaat dönemi-İnşaat Sonrası)

• Devam eden Çevre Çalışmaları:

- Yüklenici İnşaat Firması tarafından yaptırılan 3. Taraf Çevresel

İzleme Programı (İnşaat Sonrası)

- Çevre ve Şehircilik Bakanlığı-Deniz ve Kıyı Yönetimi’ne

yapılan izleme çalışmalarının raporlanması

Trans Anatolian Natural Gas Pipeline Project

ÇEVRESEL ETKİLERİN DEĞERLENDİRİLMESİ

TANAP tarafından yapılan ve çevresel etkilerin değerlendirildiği,buna

uygun olarak gerekli önleyici tedbileri değerlendirildiği çalışmalar;

• TANAP Çevresel ve Sosyal Etki Değerlendirmesi Raporu

• Deniz Geçişi İlave Değerlendirme Çalışmaları Raporu

Yüklenici İnşaat Firması tarafından yapılan çalışmalar;

• İnşaat Öncesi İnceleme ve Mevcut durumun belirlenmesi çalışmaları

• Çalışma metodolojisinin belirlenmesi, risk değerlendirmesinin yapılması

ve alınması gereken tedbirlerin belirlenmesi

• Çevre İzleme Çalışmalrının sürüdrülmesi (İnşaat öncesi, İnşaat sırasında,

İnşaat sonrasında)

Trans Anatolian Natural Gas Pipeline Project

ÇEVRE İZLEME ÇALIŞMALARI –Su kalitesi ve Bulanıklık İzleme

• 4 İstasyon (A-1, A-2, A-3 and A-4) Anadolu kıyı yaklaşımında ve

• 5 İstasyon (E-1, E-2, E-3, E-4 and E-5) Avrupa kıyı yaklaşımında

Trans Anatolian Natural Gas Pipeline Project

PROJE FOTOĞRAFLARI

Trans Anatolian Natural Gas Pipeline Project

Trans Anatolian Natural Gas Pipeline Project

Trans Anatolian Natural Gas Pipeline Project

Trans Anatolian Natural Gas Pipeline Project

Trans Anatolian Natural Gas Pipeline Project

Trans Anatolian Natural Gas Pipeline Project

Trans Anatolian Natural Gas Pipeline Project

Trans Anatolian Natural Gas Pipeline Project

Trans Anatolian Natural Gas Pipeline Project

Trans Anatolian Natural Gas Pipeline Project

Trans Anatolian Natural Gas Pipeline Project

TEŞEKKÜRLER!