Date : May 27, 2011 Project : Sea Residences Phase 3 Subject : COST ESTIMATE CORNER UNITS ITEM DESCRIPTION ORIGINAL PLAN ADDITIONAL TRENCH DRAIN AT ROOFDECK QTY UNIT UNIT COST TOTAL COST QTY UNIT UNIT COST TOTAL COST 1 MECHANICAL NO COST IMPLICATION PhP0.00 2 PLUMBING NO COST IMPLICATION 3 FIRE PROTECTION a. B.I. Pipes 50mm 4.50 lm PhP678.00 PhP3,051.00 5.50 lm PhP678.00 PhP3,729.00 40mm 10.00 lm PhP515.00 PhP5,150.00 4.00 lm PhP515.00 PhP2,060.00 25mm 8.00 lm PhP298.00 PhP2,384.00 3.50 lm PhP298.00 PhP1,043.00 b. Sprinkler Head Sidewall 4.00 pcs PhP336.00 PhP1,344.00 2.00 pcs PhP336.00 PhP672.00 Pendent 5.00 pcs PhP613.00 PhP3,065.00 7.00 pcs PhP613.00 PhP4,291.00 TOTAL AMOUNT PhP14,994.00 PhP11,795.00 TOTAL (DEDUCTIVE) AMOUNT Php 3,199.00 Prepared by:; Design Coordinates, Inc. Construction Project Managers Arch. Cid V. Orbeta Construction Project Manager Cost Estimate Per SRP3-WAO-CP01-006

Upload: alainmelcrescini

Post on 14-Jul-2016

212 views

Category:

Documents


0 download

DESCRIPTION

k

TRANSCRIPT

Page 1: WAO SRP3 006 (Corner Units)

Date : May 27, 2011Project : Sea Residences Phase 3Subject : COST ESTIMATE

CORNER UNITS

ITEM DESCRIPTIONORIGINAL PLAN ADDITIONAL TRENCH DRAIN AT ROOFDECK

QTY UNIT UNIT COST TOTAL COST QTY UNIT UNIT COST TOTAL COST

1 MECHANICAL NO COST IMPLICATION

PhP0.002 PLUMBING NO COST IMPLICATION

3 FIRE PROTECTIONa. B.I. Pipes

50mm 4.50 lm PhP678.00 PhP3,051.00 5.50 lm PhP678.00 PhP3,729.0040mm 10.00 lm PhP515.00 PhP5,150.00 4.00 lm PhP515.00 PhP2,060.0025mm 8.00 lm PhP298.00 PhP2,384.00 3.50 lm PhP298.00 PhP1,043.00

b. Sprinkler HeadSidewall 4.00 pcs PhP336.00 PhP1,344.00 2.00 pcs PhP336.00 PhP672.00Pendent 5.00 pcs PhP613.00 PhP3,065.00 7.00 pcs PhP613.00 PhP4,291.00

TOTAL AMOUNT PhP14,994.00 PhP11,795.00

TOTAL (DEDUCTIVE) AMOUNT Php 3,199.00

Prepared by:;Design Coordinates, Inc.Construction Project Managers

Arch. Cid V. OrbetaConstruction Project Manager

Cost EstimatePer SRP3-WAO-CP01-006