Warm Springs Extension Alignment 1 Fremont Central Park Subway Line, Track, Station and Systems BART Overpass (City of Fremont Grade Separation Project) Fremont Station Warm Springs/South Fremont Station Fremont Central Park South Subway Portal North Subway Portal North Ventilation Structure Lake Elizabeth South Ventilation Structure Irvington Station (Future) W alnut Ave. W a s h i n g t o n B l v d . A u t o M a l l P k w y . S . G r i m m e r B l v d . M is si o n B lv d. BART Overpass P a s e o P a d r e P k w y . S t ev e n s o n B l v d . 1 Tie-in Point for SVBX Project 1

Upload: lucas-greene

Post on 03-Jan-2016

216 views

Category:

Documents


1 download

TRANSCRIPT

Page 1: Warm Springs Extension Alignment 0 Fremont Central Park Subway Line, Track, Station and Systems BART Overpass (City of Fremont Grade Separation Project)

Warm Springs Extension Alignment

1

Fremont Central Park Subway

Line, Track, Station and Systems

BART Overpass (City of Fremont Grade Separation Project)

Fremont Station

Warm Springs/South Fremont StationFremont Central Park

South Subway Portal

North Subway

Portal

North Ventilation Structure

Lake Elizabeth

South Ventilation Structure

Irvington Station (Future)

Waln

ut A

ve.

Wash

ing

ton

Blv

d.

Au

to M

all P

kwy.

S. G

rimm

er B

lvd

.

Missio

n B

lvd.

BART Overpass

Pase

o Pa

dre

Pkw

y.

Ste

venso

n B

lvd.

1

Tie-in Point for SVBX Project

1

Page 2: Warm Springs Extension Alignment 0 Fremont Central Park Subway Line, Track, Station and Systems BART Overpass (City of Fremont Grade Separation Project)

Subway Work Progress

2

Page 3: Warm Springs Extension Alignment 0 Fremont Central Park Subway Line, Track, Station and Systems BART Overpass (City of Fremont Grade Separation Project)

LTSS Work Progress

3

Page 4: Warm Springs Extension Alignment 0 Fremont Central Park Subway Line, Track, Station and Systems BART Overpass (City of Fremont Grade Separation Project)

WSX Project Schedule

Subway Contract

Project Completion Spring 2013

LTSS Contract

Revenue Service Fall 2015

4

Page 5: Warm Springs Extension Alignment 0 Fremont Central Park Subway Line, Track, Station and Systems BART Overpass (City of Fremont Grade Separation Project)

Project Location

5

Page 6: Warm Springs Extension Alignment 0 Fremont Central Park Subway Line, Track, Station and Systems BART Overpass (City of Fremont Grade Separation Project)

HMC and Hayward Shop ModificationsSite Plan

Hayward Shop Vehicle-level Overhaul

Shop

Component Repair Shop

Central Warehouse

Non-Revenue Vehicle

and M&E (Maintenance

& Engineering) Shop and

Storage Yard

Hayward Maintenance Complex (HMC)

123

New Track

Access

6

Page 7: Warm Springs Extension Alignment 0 Fremont Central Park Subway Line, Track, Station and Systems BART Overpass (City of Fremont Grade Separation Project)

Contract 1 Site Plan

Component Repair Shop

Hayward Shop Modifications

BART Mainline

7

Page 8: Warm Springs Extension Alignment 0 Fremont Central Park Subway Line, Track, Station and Systems BART Overpass (City of Fremont Grade Separation Project)

Tie-ins and crossover

Contract 2 Site Plan