y executive summar - city of woodinville€¦ · y 5 t srw ll lbe sre wc ss ... 380 40 320 460 340...

22
y Executive Summar

Upload: dinhthuy

Post on 31-Aug-2018

213 views

Category:

Documents


0 download

TRANSCRIPT

y Ex

ecut

ive

Sum

mar

Executive Summary

City of Woodinville Comprehensive Stormwater Management Plan ES-1

Background Incorporated in 1993, the City of Woodinville (City) is a young, growing city faced with the challenges of balancing continuing economic development with environmental protection, and host of local, state and federal regulations. The City’s existing stormwater management program is currently providing public education, maintaining its drainage system, approving new development/redevelopment, controlling pollution sources, monitoring water quality, protecting salmon habitat, constructing capital improvement projects (CIPs), and complying with various regulatory requirements, including the federal Clean Water Act (CWA) through the City’s 2007 National Pollution Discharge Elimination System (NPDES) Phase II Municipal Stormwater Permit (Phase II Permit). Figure ES-1 shows a vicinity map of the City. The intent of this Comprehensive Stormwater Management (CSWM) Plan is to create a vision for the City to ensure its stormwater infrastructure and program planning occurs in a manner that is consistent with the expectations and priorities of the City, its citizens and the Washington State Department of Ecology (Ecology).

Purpose of the Study In May 2009, the City initiated the development of its first CSWM Plan, building upon an earlier internal draft plan developed by City staff. The intent of this plan was to update the list, priorities, and costs of the City’s stormwater management (SWM) capital projects, document the status of the City’s current SWM Program and compare it to regulatory requirements, estimate future capital and regulatory compliance (regulatory gap analysis) requirements, and review staffing and revenue levels to ensure adequate resources for implementation.

The City’s SWM Program is built upon the Phase II Permit as issued by Ecologyin 2007; it gives the City five years (2002011) to comply. Thus, the Phase II Permit requires the City to update and expand its SWM Program by the end of 2011. In addition, the City needs to be in compliance with a number of other local, regional and state requirements including the Puget Sound Partnership Action Agenda (Action Agenda) for cleaning up Puget Sound, the State’s Underground

7-

City of Woodinville City Hall

12

4T

H A

VE

NE

N E 1 9 5 T H S T

14

4T

H A

VE

NE

13

6T

H A

VE

NE

WO

OD

I NV

I L L E- R

ED

MO

ND

RD

14

0T

H A

VE

NE

N E 1 4 5 T H S T

13

2N

D A

VE

NE

N E 2 0 2 N D S T

13

0T

H A

VE

NE

16

4T

H A

VE

NE

17

0T

H A

VE

NE

L I T T L EB E A R

CR

EE

KP

KW

Y

16

2N

DA

VE

NE

N E 1 7 4 T H S

T

N EN O R T H

WO O D I N V I L L E W A Y

N E 1 7 5 T H S T

SRW

LL

LBE

SRE

WC

SSLBW CL

SR

LB

SRN

JC

SN

JCN

KING COUNTY

³0 0.25 0.5

Miles

W O O D I N V I L L E

Disclaimer: The information shown in this map is assembled GIS data created and acquiredby Otak Inc., from the City of Woodinville (city limits,hydrology,parcel boundaries,streets), King County GIS (county boundary) and Aerial from Aerials express 2005. This data is not to survey accuracy and is meant for planning purposes only.

VICINITY MAP

FIGURE ES-1

STORMWATER MANAGEMENT PLAN

SNOHOMISH COUNTY

522

Derby Creek

Sammamish River

Woodin Creek

Cold Creek

Lake Leota

Little Bear Creek

K:/p

roje

ct/3

1324

/GIS

/mxd

s/S

WM

Pla

n Ju

ne 2

010/

Fina

lPla

nFig

ures

_Oct

2010

BRIERMOUNTLAKE

TERRACE

SEATTLE

REDMONDKIRKLAND

BOTHELL

KENMORE

WOODINVILLE

LAKEFOREST

PARK

LakeWashington

§̈¦5

§̈¦405

B O T H E L L

522

AREA OF MAP DETAIL

202

OCTOBER 2010

LEGEND

Lake

Streams

Highway

City Limits

County Boundary

SR

SR

SR Subbasin Boundary

Parcel Boundary

Executive Summary Continued

City of Woodinville Comprehensive Stormwater Management Plan ES-3

Injection Control (UIC) Rule that governs stormwater infiltration, the Endangered Species Act (ESA), and the regional Watershed Resource Inventory Area (WRIA) habitat enhancement plan for the Lake Washington Watershed. These regulations will be integrated with the City’s CIP needs and basin planning priorities as the CSWM Plan is developed.

Approach The approach used in developing this CSWM Plan is to document and evaluate drainage problems, address local capital needs, list activities and resources required for Phase II Permit compliance, and operate within the annual revenues of the City’s SWM Fund, as shown in Figure ES-2.

Figure ES-2 – CSWM Planning Process

SWM Plan Adoption Process The SWM Plan Adoption Process will happen in phases with some overlap between the phases: • Phase I: State Environmental Policy Act (SEPA) Process • Phase II: Public Review Process • Phase III: City Council and Planning Commission Review and Approval Process The City will conduct Phase I: SEPA Process while beginning the public review process. Phase I will consist of drafting the Non-Project SEPA Checklist, filing the Checklist with the City, and a 30 day comment period. After the 30 day comment period, the City will issue a “Determination of Non-Significance” on the SEPA Checklist with an additional 15 day comment period. Phase II: Public review process will be done in conjunction with Phase I: SEPA Process. Phase II will include posting the Draft SWM Plan on the City’s website, and making it available at City Hall on compact disk (no charge) or hard copies available for purchase. The City will also conduct an Open House or Public Meeting to conduct discussions with the public and receive public comments on the Draft SWM Plan.

Phase III: City Council and Planning Commission Review and Approval Process will include a Public Hearing and Study Session with the City Council, along with a Public Hearing with the Planning Commission. The City Council will issue a decision on the adoption of the SWM Plan.

1.0 Introduction This CSWM Plan consists of the following Sections:

Executive Summary Section 1: Introduction Section 2: Characterization of the Study Area Section 3: City’s Stormwater Management Plan Section 4: SWM Facilities and Maintenance Section 5: SWM Capital Needs 5.1: City-Wide Hydraulic Analysis 5.2: Problem Ranking and CIP Development 5.3: Capital Improvement Implementation Plan Section 6: Regulatory Compliance Section 7: SWM Program Summary and Implementation

Also included in the CSWM Plan are several technical appendices that provide details on the Phase II Permit, the CIP development process, maintenance standards, and the City’s Water Quality Monitoring Program.

2.0 Characterization of the Study Area Section 2 provides a general description of the major watersheds and drainage basins in the City based on topography, soils, hydrologic conditions, natural drainage features, and major stormwater facilities. Appendix A provides drainage basin maps within the City. For the purpose of this study, the City’s drainage area was divided into major watersheds and adjacent drainage areas, as shown in Figure ES-3. As the study progressed, these watersheds were further defined into major drainage basins. The study area has been characterized by drainage basin boundaries, hydrologic characteristics (including climate, soils, topography, sensitive areas, steep slopes and floodplains), drainage basins and streams, and existing zoning and future impervious percent area.

3.0 Overview of City’s SWM Program Section 3 provides an overview of the Purpose and Mission of the City’s SWM Program, together with a summary of current organization, staffing, utility rates and annual revenues, activities and services.

ES-4 City of Woodinville Comprehensive Stormwater Management Plan

12

4T

H A

VE

NE

N E 1 9 5 T H S T

14

4T

H A

VE

NE

13

6T

H A

VE

NE

WO

OD

I NV

I L L E- R

ED

MO

ND

RD

14

0T

H A

VE

NE

N E 1 4 5 T H S T

13

2N

D A

VE

NE

N E 2 0 2 N D S T

13

0T

H A

VE

NE

16

4T

H A

VE

NE

17

0T

H A

VE

NE

L I T T L EB E A

RC

RE

EK

PK

WY

16

2N

D A

VE

NE

N E 1 7 4 T H S T

N EN O R T H

WO O D I N V I L L E W A Y

N E 1 7 5 T H S T

LL

WC

SRW

LBE

SRE

LBW

SS

JC

LB

SRN

SNLB

SS

80

120

340

320

360

280260

240

220160

40

60 420

140

520

180

380

540

460

440

480

20

560

80

440

40

320

120

40

20

20

20

20

180

40

360

40

80

320

40

40

380

340

360

40

240

60

260

20

460

20

20

340

20

40

60

360

380

4032

0

460

340

440

360

20

180

360

40

40

220 380

380

40

80

380

340

40

280

40

80

20

420

40

440

280

440

560

280

440

80

20

320

80

20

360

40

320

340

380

320

240

140

20

320

360

520

360

40

420

240

160

80

280

180

380

320

20

380

140

420

360

340

120

20

380

480

260

160

40

280

120

40

20

20

460

20

480

280

280

280

40

460

280

420

240

80

380

40

40

20

420

60

60

380

320

140

460

240

420

40

360

40

40

260

20

160

4020

120

340

560

220

320340

140

460

420

320

260

40

220

40

320

80

140

260

140

40

220

20

260

140

380

80

280

360

60

540

240

40

440

460

20

160

340

340

260

360

220

240

360

440

520

80

180

40

40

20

360

140

140

320

20

340

380

240

40

120

340

360

240

360

380

OCTOBER 2010

KING COUNTY

³0 0.25 0.5

Miles

W O O D I N V I L L E

DRAINAGE BASINS

FIGURE ES-3

CITY OF WOODINVILLE

STORMWATER MANAGEMENT PLAN

SNOHOMISH COUNTY

522

Derby Creek

Sammamish River

Woodin Creek

Cold Creek

Lake Leota

Little Bear Creek

202

K:/p

roje

ct/3

1324

/GIS

/mxd

s/S

WM

Pla

n Ju

ne 2

010/

Fina

lPla

nFig

ures

_Oct

2010

Disclaimer: The information shown in this map is assembled GIS data created and acquiredby Otak Inc.(basin boundaries), from the City of Woodinville (city limits, hydrology,parcel boundaries,streets), King County GIS (county boundary,water bodies, topology using LIDAR)This data is not to survey accuracy and is meant for planning purposes only.

LEGENDCity Limits

County Boundary

Highway

Streams

20 ft Contour

Basin Boundary

Cottage Lake (CL)

Sammamish River (SR)

JCN

SR

SR

SR

SR

CL

Juanita Creek (JC)

Little Bear (LB)

Little Bear East (LBE)

Little Bear West (LBW)

Lake Leota (LL)

Sammamish River East (SRE)

Sammamish River North (SRN)Sammamish River West (SRW)

Woodin Creek (WC)

Juanita Creek North (JCN)

School North (SN)

School South (SS)

The City’s SWM Program is primarily funded through utility fees, with the revenue being collected and distributed annually from the City’s Surface Water Management Fund. To date, utility fees, along with periodic grants and a small amount of investment income, have been used to cover the annual costs of the various SWM Program activities and capital projects. Initial utility rates were established in 1993 and have been increased once by 2.5% in 2006. Current single family residential rates are $87.15/parcel/year ($7.26/month). Parcels other than single family are charged a rate based on percent impervious area and acreage. In 2010, total SWM Fund revenues are projected to be $915K. Since 2008, the City has also received a total of $275,000 in grant funding from Ecology for Phase II Permit implementation. The City’s SWM Program includes a number of activities and services that are organized into the following services and activities: • Capital Improvement Program • Stormwater System Maintenance

Complaint Response Catch Basin Cleaning Minor Surface Water Improvements

• Phase II Permit Compliance, which includes: Public Education and Outreach Public Involvement and Participation Illicit Discharge Detection and Elimination Controlling Runoff from New Development, Redevelopment and Construction Sites Pollution Prevention and Operations and Maintenance for Municipal Operations

• Other regulatory compliance activities associated with ESA, WRIA, and the Action Agenda • Water Quality Monitoring • Program Management and Administration

4.0 SWM Facilities and Maintenance Section 4 provides a summary of the City’s stormwater inventory, including the existing status of the City’s Geographic Information system (GIS)-based mapping, and the additional activities needed to ensure the City is in compliance with the regulatory obligations of Phase II Permit. (Inventory and mapping of the City’s drainage facilities are required under Permit requirement #3, to create and operate an Illicit Discharge Detection and Elimination (IDDE) Program.) The City’s stormwater system mapping and inventory as shown in Figure ES-4 currently includes the following (February 16, 2010 data):

• 3,260 catch basins/manholes • 1,958 outfalls/major culverts • 20 pond/tanks • 12 public vaults• 37.6 miles of open ditches/swales • 53.1 miles of pipes• 60 miles of streets

ES-6 City of Woodinville Comprehensive Stormwater Management Plan

City

of W

oodi

nvill

e da

ta re

ceiv

ed F

eb. 1

6, 2

010.

Dis

clai

mer

: The

info

rmat

ion

show

n in

this

map

is a

ssem

bled

GIS

dat

a cr

eate

d an

d ac

quire

d by

Ota

k In

c.(b

asin

bou

ndar

ies,

stor

m s

yste

m m

appi

ng),

from

the

City

of

Woo

dinv

ille

(city

lim

its, h

ydro

logy

,par

cel b

ound

arie

s,st

reet

s), K

ing

Cou

nty

GIS

(cou

nty

boun

dary

,wat

er b

odie

s, to

polo

gy u

sing

LID

AR

)Th

is d

ata

is n

ot to

sur

vey

accu

racy

and

is m

eant

for p

lann

ing

purp

oses

onl

y.

124THAVENE

NE

19

5T

H S

T

144TH AVE NE

136THAVENE

WO O D I N

V I LL E - R E D M O N D R D

140TH AVE NE

NE

14

5T

H S

T

132ND AVE NE

NE

20

2N

DS

T

130TH AVE NE

164TH AVE NE

170THAVE NE

LIT

TL

EB

EA

RCREEKPKWY

162ND AVE NE

NE

17

4T

HS

T

NE

NO

RT

HW

OO

DI N

VI L

LE

WA

Y

NE

17

5T

H S

T

SRW

WC

LL

LBE

SRE

LBW

SS

JC

SRN

SNLB

SS

LB

LB

02,

000

4,00

01,

000

Feet

K:/project/31324/GIS/mxds/SWM Plan June 2010

DR

AIN

AG

E S

YST

EM

MA

P

FIG

UR

E E

S-4

CIT

Y O

F W

OO

DIN

VIL

LE

OC

TOB

ER 2

010

STO

RM

WA

TE

R M

AN

AG

EM

EN

T P

LA

N

Lege

nd Woo

dinv

ille

City

Lim

its

Coun

ty B

ound

ary

City

of

Woo

dinv

ille

Stor

mw

ater

Pip

esD

ated

: 02/

16/1

0

Stor

mw

ater

Ope

n C

hann

el

Stre

am

5ft C

onto

ur (K

ing

Co.

LID

AR)

Wat

erbo

dy

Basin

Bou

ndar

y

³

522

202

Der

by C

reek

Sam

mam

ish

Riv

er

Woo

din

Cre

ek

Col

d C

reek

Lake

Leo

ta

Littl

e B

ear C

reek

JCN

SR

SR

SR

CL

CL

Executive Summary Continued

City of Woodinville Comprehensive Stormwater Management Plan ES-9

Stormwater facilities require regular inspection, cleaning, and repair to ensure that they are functioning as intended in order to provide the required flow control, treatment, detention, and conveyance. The City’s Operations and Maintenance Program aims to protect public health and safety, maintain drainage system integrity and function, reduce infrastructure repair and life cycle costs, enhance water quality, and achieve regulatory compliance. Section 4 summarizes the City’s SWM Operations and Maintenance activities, including staffing and organization and activities. This section continues with an assessment of how well the City is meeting its minimum Phase II Permit requirements, and provides conclusions and recommendations to ensure future compliance. Maintenance Activities The maintenance staff performs most of the maintenance activities required to support the City’s Operations and Maintenance Program. However, the City does contract out a few services such as annual public and private facility inspections, vactor services, and major repair work. King County performs the facility inspections and generates work orders for the public facilities that are sent to the City. The County also mails out maintenance correction lists for the private facilities that are maintained by private property owners and provides follow up education and inspection services. The City’s maintenance staff provides the following surface water maintenance activities: • Street and drainage system cleaning • Drainage conveyance system repair and construction • Open channel and ditch maintenance • Public retention/detention facility maintenance • Citizen service request response • Emergency response • Miscellaneous service programs Organization and Staffing Since January 2003, the City’s Public Works maintenance staff has consisted of a supervisor, a lead worker, and a three-person crew, supported by seasonal staff during the summer. Collectively, the maintenance staff share the responsibility of maintaining the streets, stormwater infrastructure, publicly owned parking lots, repairs of all fleet vehicles and equipment, and responding to citizen inquiries and complaints. The City’s parks and public buildings are maintained by other crews.

5.0 SWM Capital Needs Section 5 describes the Capital Improvement Project development methodologies, including information sources, stormwater hydrologic and hydraulic modeling and results, rating and

ranking criteria for drainage concerns. It concludes with the presentation of an updated Capital Improvement Program for the City with project descriptions, costs and implementation priorities. City-Wide Hydraulic Analysis The City requested that an initial analysis be performed of major portions of the City’s stormwater conveyance system to assess current capacity. This information is needed by the City to determine if the system has adequate capacity for the additional runoff from new development and redevelopment. If additional capacity is not available, then the City would request that the developer perform a detailed downstream analysis to more accurately assess current capacity and/or size and locate additional detention/infiltration facilities onsite. The city-wide hydraulic analysis shows that approximately 75% of the analyzed pipes have sufficient capacity for the 24-hour, 25-year rainfall event (3.1 inches) and 63% of the City’s pipes have enough capacity for the 24-hour, 100-year rainfall event (3.7 inches). The areas of insufficient capacity are located throughout the City. Some of the more significant problem areas are within the Woodin Creek basin and in areas upstream of Lake Leota. Figures 5 through 11 in Appendix B show the areas where existing pipes are under capacity. The hydrologic and hydraulic modeling methodology, supporting calculations, and detailed modeling results are included in the Citywide Hydraulic Analysis Technical Memorandum in Appendix B.

Flooding at 131st Avenue NE

near the Railroad Trestle

Problem Identification and Ranking: Development of CIPs The planning process used to develop the City’s CIP Plan consisted of the following four steps as shown in Figure ES-5: • Step 1: Locating, documenting and mapping drainage problems areas. • Step 2: Rating and ranking problems areas and setting priorities for new projects. • Step 3: Analyzing drainage concerns and evaluating feasibility of potential CIP

approaches and designs. • Step 4: Selecting priority problems and identifying designs and costs for recommended

CIP projects.

ES-10 City of Woodinville Comprehensive Stormwater Management Plan

Executive Summary Continued

City of Woodinville Comprehensive Stormwater Management Plan ES-11

Figure ES-5 – CIP Development Process

Step 1—The first step in developing the CIP projects was to identify existing drainage concerns and problem areas throughout the City. Data was collected from the five different sources listed above in Figure ES-5. Identified drainage concerns ranged from minor flooding problems due to clogged structures to more serious capacity issues involving sedimentation and/or culvert and stream channel capacity. In total, compiling and reviewing the drainage complaints from the five sources resulted in the identification of 104 drainage problems areas located in various areas throughout the City as shown in Figure ES-6. (See Appendix C for the listing and ranking of identified drainage problem areas.) Step 2—After compiling these drainage concerns into a database, developing the location map, and completing the site reconnaissance, each drainage problem area/concern was evaluated for severity using a weighted scoring system. Each drainage problem was given a score of 0 to 5 for each criterion with a total possible weighted score of 115. The top scoring drainage concerns were visited in the field to visually inspect the nature of the problem and its severity, estimate its cause and develop an initial assessment of the type of problem and type of solution that may be needed and considered in Step 3. Step 3—Conceptual solutions were developed for the top scoring problem areas. A meeting was held with City staff to review the proposed solutions. Using the experience of staff and knowledge of the City’s drainage infrastructure and reoccurring problem areas, the scoring and ranking was finalized. Step 4—In the final step of the CIP development, the top 24 priority drainage concerns were further developed into CIP projects. Many of the reported concerns were related to similar issues or problem areas in a manner such that the resulting ten recommended CIP projects addressed the top 24 ranked drainage problems/concerns.

SRW

WC

LL

LBE

SRE

LBWSS

JC

SRN

SNLB

LB

SS

LB

§̈¦405

KING COUNTY

³0 0.5 1

Miles

DRAINAGE COMPLAINTS LOCATIONMAP

FIGURE ES-6

CITY OF WOODINVILLE

OCTOBER 2010

STORMWATER MANAGEMENT PLAN

SNOHOMISH COUNTY522

Derby Creek

Sammamish River

Woodin Creek

Cold Creek

Lake Leota

§̈¦405

Cottage Lake

Crystal Lake

Gold Creek

North Creek

Little Bear CreekHowell Creek

!(

!(

Streams

King County DrainageComplaints(2001 to 2008)City of Woodinville PublicWorks Complaints

Parcel Boundary

Area Not Draining to City'sStorm System

City Limits

County Boundary

Basin Boundary inHydraulic Analysis

LL

XY

")

#*

!(

CITY OF WOODINVILLE PUBLICSURVEY COMPLAINTS

City ResponseCompletedMainteneance NeededOutside City LimitsPotential ProjectNeeded

LEGEND

K:/p

roje

ct/3

1324

/GIS

/mxd

s/S

WM

Pla

n Ju

ne 2

010/

Fina

lPla

nFig

ures

_Oct

2010

Disclaimer: The information shown in this map is assembled GIS data created and acquiredby Otak Inc.(basin boundaries, CIP complaint locations), from the City of Woodinville (city limits hydrology,parcel boundaries,streets), King County GIS (county boundary,water bodies)This data is not to survey accuracy and is meant for planning purposes only.

SR

SR

JCN

SR

CL

Executive Summary Continued

City of Woodinville Comprehensive Stormwater Management Plan ES-13

Ten projects were developed to a preliminary engineering level of design to address each of the problem areas and to estimate costs. Project sketches and planning level quantity/cost estimates were developed using available GIS data, existing as-builts, and information documented during the field visits. The descriptions, sketches and preliminary cost opinions are presented in Appendix D.

Resulting Capital Improvement Program The updated Capital Improvement Program includes drainage problem and project descriptions, planning level cost estimates, and implementation priorities for each of the ten new CIP projects identified in the CIP development planning process. These new projects were prioritized based on the categories of flood hazard, community considerations and environmental impacts. The total cost of the ten new CIP projects is $6.4M as shown in Table ES-1. Figure ES-7 shows CIP project locations.

Table ES-1 Summary of CIP Projects

Problem Areas Project ID Cost (1)

1 Woodin Creek CIP $2,633,000 2 Chateau Reach CIP $608,000 3 Lake Leota and NE 180th Street CIP $947,000 4 NE Woodinville Duvall Road Stormwater Conveyance CIP $102,000 5 147th PL NE CIP $40,000 6 Cottonwood Trees at 14300 NE Wood-Duvall Road CIP $57,000 7 Little Bear Creek Culvert at 134th Ave NE CIP $1,619,155 8 144th Ave NE CIP $153,000 9 136th Ave NE and NE 205th Street CIP $153,000 10 137th PL NE CIP $48,000 Total $6,432,155

(1) Based on 2010 dollars and planning level cost estimates. See Appendix D for cost estimate backup.

6.0 Regulatory Compliance Section 6 outlines the City’s regulatory requirements and other stormwater-related obligations, including the UIC Rule, the Action Agenda, ESA, and WRIA activities and improvements. The set of regulatory requirement that guide the development and implementation of the City’s SWM Program are those associated with the Phase II Permit as summarized below.

!!

!!!

!!

!! !

!

!

!!

!!

!

!

!

!

!

!

!

!

^

^

^

^

^

^ ^

^

^

^

WC

SRW

LL

LBE

SRE

LBW

SS

JC

LB

SRN

SNLB

SSH73

H74

PS25

PCIP2

PCIP3

PCIP5

PCIP7

PCIP8

PS29 (same as PS28)

PS28 (same as PS29)

PS27 (same as PS25)PS26 (same as PS25)

PS14 (same as PS12)

PS12 (same as PS14)

CS65

CS55

CS53

CS51

CS50

CS48

CS47

CS56 (same as CS46)

CS46 (same as CS56)

§̈¦405 KING COUNTY

³0 0.5 1

Miles

CIP #10

CIP PROJECT LOCATION MAP

FIGURE ES-7

CITY OF WOODINVILLE

OCTOBER 2010

STORMWATER MANAGEMENT PLAN

SNOHOMISH COUNTY522

Derby Creek

Sammamish River

Woodin Creek

Cold Creek

Lake Leota

§̈¦405

Cottage Lake

Gold Creek

Little Bear Creek

Howell Creek

LEGEND

Top 24 RankedDrainage Complaints

Parcel Boundary

City Limits

County Boundary

Basin Boundary inHydraulic Analysis

Crystal Lake

Streams

^

!

CIP Project Locations

LL

Disclaimer: The information shown in this map is assembled GIS data created and acquiredby Otak Inc.(basin boundaries, CIP project locations), from the City of Woodinville (city limits hydrology,parcel boundaries,streets), King County GIS (county boundary,water bodies)This data is not to survey accuracy and is meant for planning purposes only.

K:/p

roje

ct/3

1324

/GIS

/mxd

s/S

WM

Pla

n Ju

ne 2

010/

Fina

lPla

nFig

ures

_Oct

2010

JCN

SR

SR

SR

CL

CIP#10

CIP #2

CIP #1 CIP #4

CIP #6

CIP #7

CIP #5

CIP #3

CIP #8

CIP #9

H87

Executive Summary Continued

City of Woodinville Comprehensive Stormwater Management Plan ES-15

NPDES Phase II Municipal Stormwater Permit The City of Woodinville has been identified by Ecology as a National Pollutant Discharge Elimination System Phase II community. As such, the City needs to comply with the requirements of its National Pollutant Discharge Elimination System and State Waste Discharge General Permit for Discharges from Small Municipal Separate Storm Sewers in Western Washington. The Phase II Permit applies to cities with populations less than 100,000 located within, or partially within an urbanized area, and that are operating a municipal separate storm sewer system which discharges to a water of Washington State. The Phase II Permit outlines stormwater program activities and implementation milestones that the City must follow over a five-year timeframe, beginning February 16, 2007, in order to comply with federal law. All Phase II communities are expected to develop a stormwater program that includes the required activities, implement those activities within the required timeframes over the term of the Phase II Permit (i.e. 2008–2011), and submit annual reports to Ecology to document progress toward complete program implementation. The major program elements required by the Phase II Permit together with the associated Phase II Permit conditions are listed below, with a copy of the Permit presented in Appendix E: • Public Education and Outreach (Special Condition S5.C.1) • Public Involvement and Participation (Special Condition S5.C.2) • Illicit Discharge Detection and Elimination (Special Condition S5.C.3) • Controlling Runoff from New Development, Redevelopment, and Construction Sites

(Special Condition S5.C.4) • Pollution Prevention and Operation and Maintenance for Municipal Operations (Special

Condition S5.C.5) • Total Maximum Daily Load Requirements (Special Condition S7) • Monitoring (Special Condition S8) • Reporting (Special Condition S9) Figure ES-8 shows the Phase II Permit requirements and milestones.

Figure ES-8 – Phase II Permit Requirements and Milestones

7.0 SWM Program Summary and Implementation The City’s future SWM Program needs to maintain regulatory compliance, fulfill its other stormwater-related obligations and address local SWM Program priorities. The City’s future SWM Program also needs to include the recommended maintenance and capital activities presented in Sections 4 and 5, respectively. By integrating, prioritizing and funding the proposed activities for regulatory compliance with the proposed capital projects, the City’s updated CSWM Plan will be effectively implemented.

Regulatory Compliance NPDES Phase II Municipal Stormwater Permit Documentation of the City’s compliance activities is organized in accordance with the five components enumerated below. Current and past compliance activities are summarized in its 2007, 2008, and 2009 Annual Reports, which are posted on the City website and are available for review at City Hall. For each of the five regulatory compliance elements, planned future compliance activities are outlined in the City’s 2009 Stormwater Management Program and summarized in Section 6 together with future requirements for Total Maximum Daily Loads (TMDLs), Monitoring, and Reporting. Permit Compliance Activities 1. Public Education and Outreach The City will continue the development and implementation of its public education and outreach program by refining education activities based on survey results. The emphasis of

ES-16 City of Woodinville Comprehensive Stormwater Management Plan

Executive Summary Continued

City of Woodinville Comprehensive Stormwater Management Plan ES-17

the City’s educational activities will be proper vehicle washing, conducting a follow up survey to measure program effectiveness, continuing to offer rain barrels and compost bins at the Spring Garden Fair, and recordkeeping of activities for the purposes of annual reporting. 2. Public Involvement and Participation The City plans to continue its ongoing public involvement and participation strategies, including creating opportunities for public involvement andcommunity feedback, and posting and responding to comments on the

CSWM lan.

rge Detection and

de to

in ,

ng activity tracking procedures.

P 3. Illicit Discha

Elimination The City intends to build upon existing IDDE activities by updating its comodify allowable and conditional discharges, developing procedures, conducting field assessments of high priority receiving waters, tracing and removing sources as identified the field, continuing to update the stormwater system map, conducting staff trainingproviding public education, and developi 4. Controlling Runoff from New Development, Redevelopment and Construction Sites The City will need to continue and update its ongoing development review/inspection program that includes consistent application of development standards, conducting permitting processes, ensuring long-term operations and maintenance of facilities, providing construction inspection/enforcement, as well as staff training, recordkeeping and reporting. The City will need to update its code to adopt either the 2005 Ecology Stormwater Management Manual for Western Washington (2005 Ecology Manual) or the 2009 King County Surface Water Design Manual (KCSWDM) and its associated maintenance standards, and low impact development (LID) requirements. 5. Pollution Prevention and Operations and Maintenance for Municipal Operations The City will continue to emphasize maintenance of its infrastructure by building upon and expanding its prior accomplishments including facility and catch basin inspections and facility maintenance in accordance with the updated maintenance standards required in the Phase II Permit. Other areas that the City will focus on for 2010 include reducing stormwater impacts from municipal operations, developing and implementing a Stormwater Pollution Prevention Plan (SWPPP) for its maintenance facility, and enhancing staff training, recordkeeping and cost tracking.

Culvert Outfall

6. Preparing for Future Monitoring Under the existing Phase II Permit, the City is required to prepare for future stormwater outfall and program effectiveness monitoring. It is likely in the next permit term (beginning in 2012), that the City will be required to implement a new outfall monitoring program. (These monitoring requirements will likely be similar to those already in place for NPDES Phase I permittees with the exception of Best Management Practices (BMPs) effectiveness monitoring.) It is anticipated that this monitoring program will involve an increase in the City’s investment in staff time and resources for equipment purchase, installation, sample collection and lab analyses, data analysis, recordkeeping, and annual reporting. 7. Annual Reporting and Status of LID Under the City’s existing Phase II Permit, annual reports must be submitted by March 31st each year for compliance activities occurring in the previous calendar year. Pursuant to the Permit Modification issued June 17, 2009, no later than March 31, 2011, the City will also need to conduct an evaluation and submit a summary of identified barriers to the use of LID and measures to address barriers. This report is to include currently available LID practices that can be reasonably implemented within the Permit term, and a list of potential or planned non-structural SWM actions and/or LID techniques that the City will undertake to prevent stormwater impacts, with schedules, goals and metrics to identify, promote, and measure LID use. Compliance with Phase II Permit Requirements for SWM Maintenance The City’s existing Operations and Maintenance Program addresses many of the requirements of the Permit and is close to meeting its Phase II Permit compliance goals. In some cases, small changes are necessary to update existing standards or activities. In a few areas, there are new activities that the City will need to perform to fully address the requirements and targeted due dates required for compliance with the Phase II Permit. Specific areas needing attention for regulatory compliance include: • Adopting and implementing updated maintenance standards consistent with the 2005

Ecology Manual. • Developing and implementing a nutrient and integrated pest management plan and

facilities maintenance manual. • Developing and implementing on-going staff training program. • Developing and implementing a SWPPP for the City’s maintenance facility. • Developing and implementing a private facility maintenance enforcement program. Water Quality Monitoring The City’s SWM Program also includes an ambient Water Quality Monitoring Program that has been in place since 2000. This is a discretionary activity that supports the City’s efforts to gain a better understanding of current conditions and to track changes in its natural drainage systems. The City’s existing Water Quality Monitoring Program is presented in Appendix F.

ES-18 City of Woodinville Comprehensive Stormwater Management Plan

Executive Summary Continued

City of Woodinville Comprehensive Stormwater Management Plan

Low Impact Development and Sustainability In July 2007, the City was actively working on updating and completing their sustainability study with involvement from the Citizen Advisory Panel. The City gathered information on implementing LID standards, by looking at LID examples from other municipalities throughout the Pacific Northwest. The City is strongly interested in, and actively pursing, the creation of sustainable land-use standards and LID drainage design standards. These are likely to be implemented in the near future by updating their zoning codes and design standards.

Little Bear Creek near the 134th Street Culvert

Capital Improvement Plan The City’s recommended capital projects have an estimated cost of $6.4M. The top ranked project addressed the flooding on Woodin Creek with a cost estimate of $2.6M. The nine other capital projects total $3.8M, with an average cost of about $643K. Priorities for funding and construction will be determined by the City Council.

Conclusion This updated Comprehensive Stormwater Management Plan for the City of Woodinville provides an assessment of existing drainage conditions within the City, lists activities needed for regulatory compliance and presents an updated, prioritized list of capital projects and costs for future funding and implementation. Areas within the City’s SWM Program that need enhancement have been identified, including activities to achieve regulatory compliance by the end of 2011. An updated CIP plan presents prioritized CIP projects and associated costs for future funding and implementation. Sections 1 through 7 that follow present the detailed analysis and recommendations of the updated Comprehensive Stormwater Management Plan, with its associated technical appendices.

ES-19