zawtika onshore presentation for visitor
TRANSCRIPT
1
ZOC & ZMS MANAGEMENT VISIT18-19 SEP. 2014
3
Zawtika Onshore Pipeline
From seashore through agriculture, community to the jungle on high mountain.
4
Yadana
TPS
276 MMSCF
50 MMSCF
DOMESTIC EXPORTIn case of
EMERGENCY
5
Process Summary
Fuel Gas Distribution
Skid
Fuel Gas Distribution
ZPQ BVW#1 (PTT)
Onshore(PTT)
Zawtika Metering Station (ZMS)
# 900# 1500
KODrum
Hg Absorber
tie-in(Future)
Ultra-sonicMeter
Comp. tie-in
(Future)Coalescer
Custody Transfer
Meter
Thai
land
– M
yanm
ar B
orde
r
Onshore(Myanmar)
Offshore(Myanmar)
Zawtika Operation Center (ZOC)
Zawtika Block Valve 1
(ZBV 1)
Zawtika Block Valve 2
(ZBV 2)
Onshore(PTTEPI)
# 600# 900
Fuel Gas Distribution
Skid
Fuel Gas Distribution
~ KP 3.5
~ KP 11.5
~ KP 37.5
~ KP 66.3
28” 28”28”
Flow Control (Mixing)
Domestic Gas Metering& Regulating
MOGE Gas Receiving Station (Existing Station)
HIPP HIPP
ESDV ESDV ESDV ESDV
PLC(Yadana Pipeline)
Coa-lescer
Process Control PointPressure Control Valve
Metering Point
Process Control PointFlow Control Valve
Metering PointMetering Point
Process Control PointPressure Control Valve
130 Barg 80 Barg
80 Barg 33 Barg
6
Security
7
Safety
8
Health
9
Environment
10
END@KP29@KP0
@KP69