35w@94: stage 3 - minnesota department of transportationdowntown to crosstown stage 3 fall 2018 –...

1
5th Ave ramp to NB I-35W CLOSED E 15th St E 19th St E Franklin Ave E 19th St E 24th St (ped bridge) E 26th St E 28th St E Lake St [1] 31st St [2] E 35th St E 36th St E 38th St E 40th St (ped bridge) E 42nd St E 46th St E 48th St E 60th St Park Ave Portland Ave Park Ave Portland Ave Portland Ave 5th Ave 4th Ave Stevens Ave Stevens Ave Nicollet Ave Lyndale Ave 94 94 35W 35W 62 62 121 77 35W 35W MINNEAPOLIS 65 Bridge closed Road closed Lane restrictions 46th St to NB I-35W ramp OPEN NB I-35W to 36th St ramp OPEN 35th St to NB I-35W ramp CLOSED NB I-35W to 31st St/Lake St ramp [4] CLOSED Open to Transit/Emergency Vehicles ONLY WB I-94 to 11th St ramp OPEN NB I-35W to WB I-94 ramp CLOSED 5th Ave ramp to EB I-94 OPEN Midtown Greenway [3] EB I-94 to SB I-35W ramp CLOSED SB I-35W to 46th St ramp OPEN 36th St to SB I-35W ramp CLOSED SB I-35W to 35th St ramp CLOSED 31st St to SB I-35W ramp CLOSED 24th St pedestrian bridge CLOSED 28th St bridge CLOSED 4th Ave to WB I-94 ramp OPEN 40th St pedestrian bridge CLOSED 2nd Ave S. 2nd Ave S. 26th St bridge OPEN 4th Ave: 22nd St-25th St CLOSED Stevens Ave: 31st St-35th St [5] CLOSED Stevens Ave: Midtown Greenway- Lake St CLOSED 2nd Ave: 31st St-32nd St CLOSED Spring 2019 35W@94: Downtown to Crosstown STAGE 3 Fall 2018 – Summer 2019 I-35W NB: Three lanes open (one lane MnPASS) SB: Two lanes open I-94 All lanes open Ramp closures shown may not be closed the entire staging phase, and some short-term ramp closures may occur that are not included in the staging map There will be periodic lane closures on I-35W throughout the project and some full-weekend closures Notes: [1] Lake Street will remain open to traffic during construcon; however, there will be lane restricons and some short-term closures [2] 31st St will remain open; however, there will be lane restricons and short-term closures [3] Midtown Greenway will be maintained and open to bicycles and pedestrians throughout the project; however, there may be lane restricons and some short-term closures [4] NB I-35W to 31st St/Lake St ramp will remain closed through fall 2018, aſter which me project partners will reevaluate whether it can reopen to general traffic [5] Stevens Ave between 31st St and 35th St is open to local traffic, but access will change as construcon progresses Schedule is tentative and subject to change Revised October 18, 2018 55 Hwy 65/12th St/4th Ave ramp from downtown CLOSED Open to Transit/Emergency Vehicles ONLY Hwy 65 to downtown 11th St and E Grant St ONLY OPEN Hwy 65 to 5th Ave S CLOSED

Upload: others

Post on 07-Aug-2020

1 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: 35W@94: STAGE 3 - Minnesota Department of TransportationDowntown to Crosstown STAGE 3 Fall 2018 – Summer 2019 I-35W NB: Three lanes open (one lane MnPASS) SB: Two lanes open I-94

5th Ave ramp to NB I-35WCLOSED

E 15th St

E 19th St

E Franklin Ave

E 19th St

E 24th St(ped bridge)

E 26th St

E 28th St

E Lake St [1]

31st St [2]

E 35th St

E 36th St

E 38th St

E 40th St(ped bridge)

E 42nd St

E 46th St

E 48th St

E 60th St

Park Ave

Portland Ave

Park Ave

Portland AvePortland Ave

5th Ave

4th Ave

Stevens AveStevens Ave

Nicollet Ave

Lyndale Ave

9494

35W

35W

62

62

121

77

35W

35W

MINNEAPOLIS

65

Bridge closed Road closed Lane restrictions

46th St to NB I-35W ramp OPEN

NB I-35W to 36th St ramp OPEN

35th St to NB I-35W ramp CLOSED

NB I-35W to 31st St/Lake St ramp [4]CLOSED

Open to Transit/Emergency Vehicles ONLY

WB I-94 to 11th St ramp OPEN

NB I-35W to WB I-94 ramp CLOSED

5th Ave ramp to EB I-94OPEN

Midtown Greenway [3]

EB I-94 to SB I-35W ramp CLOSED

SB I-35W to 46th St ramp

OPEN

36th St to SB I-35W ramp

CLOSED

SB I-35W to 35th St ramp

CLOSED

31st St to SB I-35W ramp

CLOSED

24th St pedestrian bridge CLOSED

28th St bridgeCLOSED

4th Ave to WB I-94 ramp OPEN

40th St pedestrian

bridgeCLOSED

2nd Ave S.2nd Ave S.

26th St bridgeOPEN

4th Ave: 22nd St-25th St CLOSED

Stevens Ave:31st St-35th St [5]

CLOSED

Stevens Ave:Midtown Greenway-

Lake St CLOSED

2nd Ave: 31st St-32nd St CLOSED Spring 2019

35W@94:Downtown to Crosstown STAGE 3

Fall 2018 – Summer 2019

I-35W NB: Three lanes open

(one lane MnPASS) SB: Two lanes open

I-94 All lanes open

Ramp closures shown may not be closed the entire staging phase, and some short-term ramp closures may occur that are not included in the staging map

There will be periodic lane closures on I-35W throughout the project and some full-weekend closures

Notes: [1] Lake Street will remain open

to traffic during construction;however, there will be lanerestrictions and someshort-term closures

[2] 31st St will remain open;however, there will be lanerestrictions and short-termclosures

[3] Midtown Greenway will bemaintained and open to bicyclesand pedestrians throughout theproject; however, there may belane restrictions and someshort-term closures

[4] NB I-35W to 31st St/Lake Stramp will remain closed throughfall 2018, after which timeproject partners will reevaluatewhether it can reopen togeneral traffic

[5] Stevens Ave between 31st Stand 35th St is open to localtraffic, but access will change asconstruction progresses

Schedule is tentative and subject to change

Revised October 18, 2018

55

Hwy 65/12th St/4th Ave ramp from downtown

CLOSEDOpen to Transit/Emergency

Vehicles ONLY

Hwy 65 to downtown11th St and E Grant St ONLY

OPEN

Hwy 65 to 5th Ave SCLOSED