stage 2 phasing map - summer 2018 through fall 2018 · downtown (12th st/4th ave) to sb i-35w 4th...

2
Midtown Greenway 5th Ave ramp to NB I-35W CLOSED Proposed bridge work Road closed Lane Restrictions E 15th St E Franklin Ave E 19th St E 24th St (ped bridge) E 26th St E 28th St E Lake St E 31st St E 35th St E 36th St E 38th St E 40th St (ped bridge) E 42nd St E 46th St E 48th St E 60th St Park Ave Portland Ave Park Ave Portland Ave 5th Ave 4th Ave Stevens Ave Stevens Ave Lyndale Ave 35W 35W 94 94 35W 35W 55 62 62 121 77 MINNEAPOLIS 65 2nd Ave S. 2nd Ave S. Portland Ave Nicollet Ave WB I-94 to 11th St OPEN EB I-94 to SB I-35W ramp CLOSED Summer 2018 SB I-35W to 46th St ramp OPEN 36th St to SB I-35W ramp CLOSED 40th St pedestrian bridge CLOSED Summer 2018 Hwy 65 to/from downtown and 12th St ramp CLOSED Summer 2018 SB I-35W to 35th St ramp CLOSED Summer 2018 35th St to NB I-35W ramp CLOSED Open to Emergency Vehicles Summer 2018 31st St to SB I-35W ramp CLOSED Open to Transit/Emergency Vehicles Summer 2018 26th St bridge CLOSED Summer 2018 NB I-35W to 31st St ramp CLOSED Open to Transit/Emergency Vehicles Summer 2018 NB I-35W to 36th St ramp OPEN 46th St to NB I-35W ramp OPEN 24th St pedestrian bridge CLOSED 4th Ave to WB I-94 ramp CLOSED Summer 2018 5th Ave ramp to EB I-94 OPEN 38th Street Bridge CLOSED Franklin Ave Bridge OPEN Portland Ave Bridge OPEN 4th Ave: Franklin Ave-25th St CLOSED Summer 2018 28th St bridge CLOSED Fall 2018 NB I-35W to WB I-94 ramp CLOSED Summer 2018 35W@94: Downtown to Crosstown STAGE 2 Summer 2018 – Fall 2018 I-35W NB: Three lanes open (one lane MnPASS) SB: Two lanes open I-94 EB: All lanes open WB: Two lanes open Hwy 65 (Access to/from downtown and I-35W): closed Ramp closures shown may not be closed the entire staging phase, and some short-term ramp closures may occur that are not included in the staging map There will be periodic lane closures on I-35W throughout the project and some full-weekend closures Notes: 1) 28th St bridge closed aſter 26th St bridge is opened 2) Lake Street will remain open to traffic during construcon; however, there will be lane restricons and some short-term closures 3) Midtown Greenway will be maintained and open to bicycles and pedestrians throughout the project Schedule is tentative and subject to change Revised May 17, 2018

Upload: truongdiep

Post on 11-Jul-2018

218 views

Category:

Documents


0 download

TRANSCRIPT

Midtown Greenway

5th Ave ramp to NB I-35WCLOSED

Proposed bridge work R oad closedLane Restrictions

E 15th St

E Franklin Ave

E 19th St

E 24th St(ped bridge)

E 26th St

E 28th St

E Lake St

E 31st St

E 35th St

E 36th St

E 38th St

E 40th St(ped bridge)

E 42nd St

E 46th St

E 48th St

E 60th St

Park Ave

Portland Ave

Park Ave

Portland Ave5th Ave

4th Ave

Stevens AveStevens Ave

Lyndale Ave

35W

35W

94 94

35W

35W

55

62

62

121

77

MINNEAPOLIS

65

2nd Ave S.2nd Ave S.

Portland Ave

Nicollet Ave

WB I-94 to 11th StOPEN

EB I-94 to SB I-35W ramp CLOSED Summer 2018

SB I-35W to 46th St ramp

OPEN

36th St to SB I-35Wramp

CLOSED

40th St pedestrian bridge

CLOSEDSummer 2018

Hwy 65 to/from downtownand 12th St ramp

CLOSED Summer 2018

SB I-35W to 35th St ramp

CLOSEDSummer 2018

35th St to NB I-35W ramp CLOSED Open to Emergency Vehicles

Summer 2018

31st St to SB I-35W

ramp CLOSEDOpen to

Transit/EmergencyVehicles

Summer 2018

26th St bridgeCLOSED Summer 2018

NB I-35W to 31st St ramp CLOSEDOpen to Transit/Emergency Vehicles

Summer 2018

NB I-35W to 36th St ramp OPEN

46th St to NB I-35W ramp OPEN

24th St pedestrian bridgeCLOSED

4th Ave to WB I-94 ramp CLOSED

Summer 2018

5th Ave ramp to EB I-94OPEN

38th Street BridgeCLOSED

Franklin Ave Bridge OPEN

Portland Ave Bridge OPEN

4th Ave: Franklin Ave-25th St

CLOSED Summer 2018

28th St bridgeCLOSED Fall 2018

NB I-35W to WB I-94 ramp CLOSED

Summer 2018

35W@94:Downtown to Crosstown STAGE 2

Summer 2018 – Fall 2018 I-35W NB: Three lanes open

(one lane MnPASS) SB: Two lanes open

I-94 EB: All lanes openWB: Two lanes open

Hwy 65 (Access to/fromdowntown and I-35W): closed

Ramp closures shown may not be closed the entire staging phase, and some short-term ramp closures may occur that are not included in the staging map

There will be periodic lane closures on I-35W throughout the project and some full-weekend closures

Notes: 1) 28th St bridge closed after

26th St bridge is opened2) Lake Street will remain open

to traffic during construction;however, there will be lanerestrictions and someshort-term closures

3) Midtown Greenway will bemaintained and open to bicyclesand pedestrians throughoutthe project

Schedule is tentative and subject to changeRevised May 17, 2018

Sum

mer

Sum

merFall

Win

ter

Sprin

g

Fall

Win

ter

Sprin

g

Sum

mer

Fall

Win

ter

Sprin

g

Sum

mer Fall

Win

ter

Sprin

g

Sum

mer Fall

35W@94:Downtown to Crosstown

20172017 20182018 20192019 20202020 2021

STAGESTAGE 1 STAGE 3 STAGE 4 STAGE 52

2021

*All information is tentative and subject to changeClosed Lane Reduction Open to Transit/Emergency Vehicles ONLY

BRIDGE CLOSURESPortland Ave BridgeFranklin Ave Bridge

24th St Pedestrian Bridge26th St Bridge28th St Bridge38th St Bridge

40th St Pedestrian Bridge

RAMP CLOSURESAccess To/From Downtown

WB I-94 to 11th St RampNB I-35W to Downtown (11th St/Grant St/5th Ave)

Downtown (12th St/4th Ave) to SB I-35W4th Ave/16th St to WB I-94 Ramp

I-35W/I-94 InterchangeEB I-94 to SB I-35W Ramp

NB I-35W to WB I-94 Ramp5th Ave Ramps

5th Ave Ramp to NB I-35W5th Ave Ramp to EB I-94

31st Street Ramps31st St to SB I-35W

NB I-35W to 31st St Ramp35th Street Ramps

SB I-35W to 35th St Ramp35th St to NB I-35W Ramp

36th Street RampsNB I-35W to 36th St Ramp36th St to SB I-35W Ramp

46th Street RampsSB I-35W to 46th St Ramp

46th St to NB I-35W Ramp

HIGHWAY LANE REDUCTIONNB I-35W from 43rd St to Downtown MinneapolisSB I-35W from Downtown Minneapolis to 43rd St

WB I-94 from Portland Ave to Stevens Ave

LOCAL ROAD WORK2nd Ave: 31st St-32nd St

2nd Ave: Lake St-32nd St3rd Ave: 27th-2nd Ave

4th Ave: 18th St-Franklin Ave4th Ave: 12th St-15th St

4th Ave: Franklin Ave-25th St5th Ave: 18th St-Franklin Ave5th Ave: Franklin Ave-25th StStevens Ave: 28th St-35th StLake St: Blaisdell Ave-5th AveClinton Ave: 26th St-3rd Ave

15th St: 4th Ave-Portland Ave31st St: 1st Ave to 3rd Ave

PROJECT SCHEDULE

Updated July 10, 2018

ROAD CONSTRUCTIONROAD CONSTRUCTION

Stay Connected:

website: email: phone:www.mndot.gov/35w94 [email protected] 612-284-6125