stage 2 phasing map - summer 2018 through fall 2018 · downtown (12th st/4th ave) to sb i-35w 4th...
TRANSCRIPT
Midtown Greenway
5th Ave ramp to NB I-35WCLOSED
Proposed bridge work R oad closedLane Restrictions
E 15th St
E Franklin Ave
E 19th St
E 24th St(ped bridge)
E 26th St
E 28th St
E Lake St
E 31st St
E 35th St
E 36th St
E 38th St
E 40th St(ped bridge)
E 42nd St
E 46th St
E 48th St
E 60th St
Park Ave
Portland Ave
Park Ave
Portland Ave5th Ave
4th Ave
Stevens AveStevens Ave
Lyndale Ave
35W
35W
94 94
35W
35W
55
62
62
121
77
MINNEAPOLIS
65
2nd Ave S.2nd Ave S.
Portland Ave
Nicollet Ave
WB I-94 to 11th StOPEN
EB I-94 to SB I-35W ramp CLOSED Summer 2018
SB I-35W to 46th St ramp
OPEN
36th St to SB I-35Wramp
CLOSED
40th St pedestrian bridge
CLOSEDSummer 2018
Hwy 65 to/from downtownand 12th St ramp
CLOSED Summer 2018
SB I-35W to 35th St ramp
CLOSEDSummer 2018
35th St to NB I-35W ramp CLOSED Open to Emergency Vehicles
Summer 2018
31st St to SB I-35W
ramp CLOSEDOpen to
Transit/EmergencyVehicles
Summer 2018
26th St bridgeCLOSED Summer 2018
NB I-35W to 31st St ramp CLOSEDOpen to Transit/Emergency Vehicles
Summer 2018
NB I-35W to 36th St ramp OPEN
46th St to NB I-35W ramp OPEN
24th St pedestrian bridgeCLOSED
4th Ave to WB I-94 ramp CLOSED
Summer 2018
5th Ave ramp to EB I-94OPEN
38th Street BridgeCLOSED
Franklin Ave Bridge OPEN
Portland Ave Bridge OPEN
4th Ave: Franklin Ave-25th St
CLOSED Summer 2018
28th St bridgeCLOSED Fall 2018
NB I-35W to WB I-94 ramp CLOSED
Summer 2018
35W@94:Downtown to Crosstown STAGE 2
Summer 2018 – Fall 2018 I-35W NB: Three lanes open
(one lane MnPASS) SB: Two lanes open
I-94 EB: All lanes openWB: Two lanes open
Hwy 65 (Access to/fromdowntown and I-35W): closed
Ramp closures shown may not be closed the entire staging phase, and some short-term ramp closures may occur that are not included in the staging map
There will be periodic lane closures on I-35W throughout the project and some full-weekend closures
Notes: 1) 28th St bridge closed after
26th St bridge is opened2) Lake Street will remain open
to traffic during construction;however, there will be lanerestrictions and someshort-term closures
3) Midtown Greenway will bemaintained and open to bicyclesand pedestrians throughoutthe project
Schedule is tentative and subject to changeRevised May 17, 2018
Sum
mer
Sum
merFall
Win
ter
Sprin
g
Fall
Win
ter
Sprin
g
Sum
mer
Fall
Win
ter
Sprin
g
Sum
mer Fall
Win
ter
Sprin
g
Sum
mer Fall
35W@94:Downtown to Crosstown
20172017 20182018 20192019 20202020 2021
STAGESTAGE 1 STAGE 3 STAGE 4 STAGE 52
2021
*All information is tentative and subject to changeClosed Lane Reduction Open to Transit/Emergency Vehicles ONLY
BRIDGE CLOSURESPortland Ave BridgeFranklin Ave Bridge
24th St Pedestrian Bridge26th St Bridge28th St Bridge38th St Bridge
40th St Pedestrian Bridge
RAMP CLOSURESAccess To/From Downtown
WB I-94 to 11th St RampNB I-35W to Downtown (11th St/Grant St/5th Ave)
Downtown (12th St/4th Ave) to SB I-35W4th Ave/16th St to WB I-94 Ramp
I-35W/I-94 InterchangeEB I-94 to SB I-35W Ramp
NB I-35W to WB I-94 Ramp5th Ave Ramps
5th Ave Ramp to NB I-35W5th Ave Ramp to EB I-94
31st Street Ramps31st St to SB I-35W
NB I-35W to 31st St Ramp35th Street Ramps
SB I-35W to 35th St Ramp35th St to NB I-35W Ramp
36th Street RampsNB I-35W to 36th St Ramp36th St to SB I-35W Ramp
46th Street RampsSB I-35W to 46th St Ramp
46th St to NB I-35W Ramp
HIGHWAY LANE REDUCTIONNB I-35W from 43rd St to Downtown MinneapolisSB I-35W from Downtown Minneapolis to 43rd St
WB I-94 from Portland Ave to Stevens Ave
LOCAL ROAD WORK2nd Ave: 31st St-32nd St
2nd Ave: Lake St-32nd St3rd Ave: 27th-2nd Ave
4th Ave: 18th St-Franklin Ave4th Ave: 12th St-15th St
4th Ave: Franklin Ave-25th St5th Ave: 18th St-Franklin Ave5th Ave: Franklin Ave-25th StStevens Ave: 28th St-35th StLake St: Blaisdell Ave-5th AveClinton Ave: 26th St-3rd Ave
15th St: 4th Ave-Portland Ave31st St: 1st Ave to 3rd Ave
PROJECT SCHEDULE
Updated July 10, 2018
ROAD CONSTRUCTIONROAD CONSTRUCTION