North Dakota Department of Mineral Resources. http://www.oilgas.nd.gov. http://www.state.nd.us/ndgs. 600 East Boulevard Ave. - Dept 405 Bismarck, ND 58505-0840 (701) 328-8020(701) 328-8000. Development area > 15,000 sq mi Size of West Virginia. 2,400 wells=90MW. 350-375 wells 2013-2020. - PowerPoint PPT Presentation

TRANSCRIPT

Page 1: 600 East Boulevard Ave. - Dept 405 Bismarck, ND 58505-0840 (701) 328-8020(701) 328-8000

600 East Boulevard Ave. - Dept 405Bismarck, ND 58505-0840

(701) 328-8020 (701) 328-8000

North Dakota Department of Mineral Resources

http://www.state.nd.us/ndgshttp://www.oilgas.nd.gov

Page 2: 600 East Boulevard Ave. - Dept 405 Bismarck, ND 58505-0840 (701) 328-8020(701) 328-8000

Development area> 15,000 sq miSize of West Virginia

Page 3: 600 East Boulevard Ave. - Dept 405 Bismarck, ND 58505-0840 (701) 328-8020(701) 328-8000
Page 4: 600 East Boulevard Ave. - Dept 405 Bismarck, ND 58505-0840 (701) 328-8020(701) 328-8000
Page 5: 600 East Boulevard Ave. - Dept 405 Bismarck, ND 58505-0840 (701) 328-8020(701) 328-8000

2,400 wells=90MW

Page 6: 600 East Boulevard Ave. - Dept 405 Bismarck, ND 58505-0840 (701) 328-8020(701) 328-8000

350-375 wells 2013-2020

Page 7: 600 East Boulevard Ave. - Dept 405 Bismarck, ND 58505-0840 (701) 328-8020(701) 328-8000
Page 8: 600 East Boulevard Ave. - Dept 405 Bismarck, ND 58505-0840 (701) 328-8020(701) 328-8000
Page 9: 600 East Boulevard Ave. - Dept 405 Bismarck, ND 58505-0840 (701) 328-8020(701) 328-8000

Western North Dakota• 1,100 to 2,700 wells/year = 2,000 expected

– 185 rigs = 22,000 temporary drilling jobs– Another 13,000 temporary jobs building infrastructure– 2,000-3,000 permanent jobs added each year

– 185 rigs will complete the first phase of drilling in 6-12 months– 185 rigs will require about 20 years to complete phase 2 drilling

– 2,000 new wells per year requires 11-22 million gallons of frac water per day

– 40,000-45,000 new wells = 40,000-70,000 long term jobs

17-28 million gallons per day maintenance water

Page 10: 600 East Boulevard Ave. - Dept 405 Bismarck, ND 58505-0840 (701) 328-8020(701) 328-8000

North Dakota New Well Permits Issued

0

500

1000

1500

2000

2500

3000

1950 1955 1960 1965 1970 1975 1980 1985 1990 1995 2000 2005 2010 2015 2020

Page 11: 600 East Boulevard Ave. - Dept 405 Bismarck, ND 58505-0840 (701) 328-8020(701) 328-8000

North Dakota Average Monthly Rig Count

0

50

100

150

200

250

1975 1979 1983 1987 1991 1995 1999 2003 2007 2011 2015

Rig

s

Rig Count ND Sweet Oil Price

Page 12: 600 East Boulevard Ave. - Dept 405 Bismarck, ND 58505-0840 (701) 328-8020(701) 328-8000

North Dakota Oil Production

0

200,000

400,000

600,000

800,000

1,000,000

1,200,000

1,400,000

1,600,000

1,800,000

2,000,00019

70

1975

1980

1985

1990

1995

2000

2005

2010

2015

2020

2025

2030

2035

2040

2045

2050

2055

Ba

rre

ls p

er

Da

y

History Bakken - Three Forks P10 Bakken - Three Forks P50 Bakken - Three Forks P90

Page 13: 600 East Boulevard Ave. - Dept 405 Bismarck, ND 58505-0840 (701) 328-8020(701) 328-8000

Reclamation• 26,346 wells permitted as of 9/1/13

– 1,291 approved locations– 1,136 drilling and completing– 2,837 cancelled and expired permits– 9,096 producing– 972 idle producers– 447 active EOR injectors– 390 idle EOR injectors– 398 active disposal wells– 234 idle disposal wells– 1,113 bond not released

• 8,432 reclaimed locations

Page 14: 600 East Boulevard Ave. - Dept 405 Bismarck, ND 58505-0840 (701) 328-8020(701) 328-8000
Page 15: 600 East Boulevard Ave. - Dept 405 Bismarck, ND 58505-0840 (701) 328-8020(701) 328-8000
Page 16: 600 East Boulevard Ave. - Dept 405 Bismarck, ND 58505-0840 (701) 328-8020(701) 328-8000
Page 17: 600 East Boulevard Ave. - Dept 405 Bismarck, ND 58505-0840 (701) 328-8020(701) 328-8000
Page 18: 600 East Boulevard Ave. - Dept 405 Bismarck, ND 58505-0840 (701) 328-8020(701) 328-8000
Page 19: 600 East Boulevard Ave. - Dept 405 Bismarck, ND 58505-0840 (701) 328-8020(701) 328-8000

North Dakota Monthly Gas Flared

0%

5%

10%

15%

20%

25%

30%

35%

40%

1985 1990 1995 2000 2005 2010 2015 2020

Percent Flared

Page 20: 600 East Boulevard Ave. - Dept 405 Bismarck, ND 58505-0840 (701) 328-8020(701) 328-8000

NDIC Goals

• Reduce Flared volume

• Reduce number of wells flaring

• Reduce duration of flaring from wells

Page 21: 600 East Boulevard Ave. - Dept 405 Bismarck, ND 58505-0840 (701) 328-8020(701) 328-8000
Page 22: 600 East Boulevard Ave. - Dept 405 Bismarck, ND 58505-0840 (701) 328-8020(701) 328-8000

NDAC RULES PROPOSED CHANGE

43-02-03-01 Definitions Expand definition of treating plant to include recycling production water43-02-03-11 Organization Reports Require organization report for treating plants43-02-03-14 Access to Records Clarifies that OGD can inspect treating plant records and facilities

Requires gound elev, legal street address, and proposed road access on platAllows OGD to consider landowner w/in 1000' of well to have input on loc of flareRequires appl to notice landowner & landowner to comment in 5 business days

43-02-03-16.1 Designation of Operator Treating plant operator is the bond holder; person can dispute oper designation43-02-03-16.3 Recovery of a Risk Penalty Clarifies sur of well + completion loc must be included in the invite to participate

Requires sign on transportation, purchasing, and processing facilitiesRemoves requirement to be legible at distance of 50'

43-02-03-19 Site Construction Allows liners & fabrics placed on sites only upon OGD approval (Fm4)43-02-03-19.3 Earthen Pits and Open Receptacles Removes OGD authority to extend 30-day requirement to remove open receptacle

43-02-03-19.4 Drilling Pits Clarifies oper must report reclamation work on Fm4Allows reserve pit if well located outside of Bak/TF development areasSeparate reserve pit must be utilized to segregrate each mud system/cuttings

43-02-03-22 Defective Casing or Cementing Allows waiver on remedial work if can protect casing from external corrosion43-02-03-27.1 Hydraulic Fracture Stimulation Requires remote frac valve to be located on edge of loc or other safe distance

Requires all electric generators (not just portable lighting) to be 150' to well/tankRequires oper fracing well to give 24hr notice to offsetting oper if lateral w/in 1320'General guidelines for installing pipelinesRequires GIS layer of new pipelines w/in 180 days of placing into serviceReport to include size, operating press, fluid, composition, & depth of pipelineMust purge abandoned pipelines, report GIS layer in 180 days & submit aff to OGD

43-02-03-30 Fires, Leaks, Spills, or Blowouts--HB1149 Reports must comply with NDCC Sec 37-17.1-07.1 (HB1149)43-02-03-34 Method of Plugging Corrects reference to site reclamation (43-02-03-34.1, not 43-02-03-19)

Requires reclamation of treating plant after decommissionedRequires access road and site waivers to be recorded with County RecorderAllows samples to be taken as prescribed by State Geol, not at regular intervalsRequires sample box to include file & API #Increases core filing deadline fromj 90 to 180 days--allows director exceptionStandard size of sample and core boxes to be determined by state geologist

43-02-03-48 Measurement of Oil Volume of oil must be corrected to 14.73 psia per 43-02-03-80 (Trans Reports)43-02-03-51 Treating Plant--HB1333 Requires treating plant permit notice be given to County Auditor43-02-03-51.1 Treating Plant Permit Requirements New section outlining TP permit requirements43-02-03-51.2 Treating Plant Siting TP can't be located in a geologically or hydrologically sensitive area43-02-03-51.3 Treating Plant Construction and Operation TP construction & operational requirements typically placed in order now here43-02-03-51.4 Treating Plant Abandon and Reclamation TP abandon & reclamation requirements typically placed in order now here43-02-03-55 Abandonment of Wells and Treating Plants TP considered AB if not used in one year43-02-03-60.2 Flaring Exemption--HB1134 Must consider 75% to beneficial use or conversion to liquids (HB____)43-02-03-60.3 Appl--Certify f/Temp Gas Tax Exempt--HB1134 Outlines requirements to obtain temp gas tax exemption (HB ____)43-02-03-80 Reports of Purchaser and Trans of Crude Oil Requires operator of rail facility to report oil received and shipped43-02-03-81 Authorization to Transport Oil Requires operator of treating plant to receive approval prior to transporting oil43-02-03-88.1 Special Procedures for Hearings--HB1333 Requires Commission to give 15-day notice of SWD hearing to County Auditor

Clarifies the top and bottom of confining zones must be identifiedSchematic required including location of liners and flowlinesDetail proposed access to nearest public road and authority to build accessTraffic flow diagram of site plus parkingReview of all surficial aquifers within one mile of the facilityAllows Director to suspend any permitProhibits site construction without Director approval

43-02-08-01 Definitions Defines qualifying period to include total production from a well43-02-08-02 Appl f/Stripper Well/Property Clarifies required info for a stripper well application

Identifies single well drill after 7-1-13 as a propertyRequires RE or recompleted stripper well to be recertified as stripper wellLimits additional wells on stripper well property to be compl prior to 7-1-13Allows Bak/TF wells > 10,000 feet to qualify if less < 35 bopdMust use popoff valves, rupture disk, remote valveUse frack string: no chem disclosure if > 350psi on annulus after frackFrack down csg: run csg evaluation f/thickness of csg and cmt w/chem disclosure

43-02-08-04 Parties Adversely Affected May Amend Appl Clarifies the rule applies to a stripper well43-02-08-05 Adversely Affected Parties--Request Hearing Clarifies the rule applies to a stripper well43-02-08-11 Books and Records to Substantiate Reports Clarifies the rule applies to a stripper well

43-02-12-04 Appl for Geophysical Permit Removes requirement for identifying marks on plugs in seismic shot holesRemoves requirement for identifying marks on plugs in seismic shot holesAllows only dry cuttings when plugging shot holes

43-02-12 GEOPHYSICAL EXPLORATION REQUIREMENTS

43-02-12-07 Drilling and Plugging Requirements

SUMMARY OF PROPOSED 2014 RULES

43-02-03 GENERAL RULES

43-02-03-16Application for Permit to Drill and RecompleteHB1333, HB1348

43-02-03-38.1 Preservation of Cores and Samples

43-02-05 UNDERGROUND INJECTION CONTROL

Permit Requirements--HB1333

43-02-08-03 Director to Determine Stripper Well Status

43-02-03-34.1 Reclamation of Surface

43-02-05-04

43-02-08 STRIPPER WELL PROPERTY DETERMINATION--HB1198

43-02-08-02.1 Property Determination

43-02-03-29 Well and Lease Equipment--HB1333

43-02-03-17 Sign on Well or Facility

43-02-03-28 Safety Regulation

43-02-03-19.5 Reserve Pits--SB2014

Page 23: 600 East Boulevard Ave. - Dept 405 Bismarck, ND 58505-0840 (701) 328-8020(701) 328-8000

NDIC 2013-2014 Rulemaking

• 41 sections proposed– 16 due to statute changes– 11 apply to treating plants– 13 administrative or industry request/friendly

• Hearing 8:30am October 1, 2013• Comment period ends 5:00pm October 11, 2013• Final NDIC approval November 26, 2013• Effective date April 1, 2014

Page 24: 600 East Boulevard Ave. - Dept 405 Bismarck, ND 58505-0840 (701) 328-8020(701) 328-8000
Page 25: 600 East Boulevard Ave. - Dept 405 Bismarck, ND 58505-0840 (701) 328-8020(701) 328-8000
Page 26: 600 East Boulevard Ave. - Dept 405 Bismarck, ND 58505-0840 (701) 328-8020(701) 328-8000
Page 27: 600 East Boulevard Ave. - Dept 405 Bismarck, ND 58505-0840 (701) 328-8020(701) 328-8000

WILLISTON BASIN TEMPERATURE PROFILE PROJECT

Page 28: 600 East Boulevard Ave. - Dept 405 Bismarck, ND 58505-0840 (701) 328-8020(701) 328-8000
Page 29: 600 East Boulevard Ave. - Dept 405 Bismarck, ND 58505-0840 (701) 328-8020(701) 328-8000

NDIC Drill Cuttings Samples

• Multi-well pads– Sample the one/two well(s) per pad to the deepest

layer/bench– Sample vertical and build section at 30 foot intervals– Sample horizontal section at 90 foot intervals

• Single well pads– Sample vertical and build section at 30 foot intervals– Sample horizontal section at 90 foot intervals

Page 30: 600 East Boulevard Ave. - Dept 405 Bismarck, ND 58505-0840 (701) 328-8020(701) 328-8000