City Council Work SessionMonday, January 11, 2016 Mankato Room at 6 p.m.
1. Ameresco Presentation
2. Adjournment
1/8/2016
1
Energy Savings Performance ContractPreliminary Findings
© Ameresco, Inc. 2015, All Rights Reserved
December 2, 2015
Preliminary Findings
City of Mankato Administration Project Review
n Ameresco Introduction
n Energy Savings Performance Contracting Your trusted
AgendaAgenda
© Ameresco, Inc. 2015, All Rights Reserved 2
Performance Contracting
n Preliminary Assessment Findings
n Next Steps
Your trusted sustainability partner
Broad Base of SolutionsBroad Base of Solutions
Ameresco offers a comprehensive array of energy solutions to address energy at every stage – before, at, and after the meter – and on an integrated basis supporting best practices and customer value.
© Ameresco, Inc. 2015, All Rights Reserved 3
ReRe--Purposing of Current Utility Budget DollarsPurposing of Current Utility Budget Dollars
Annual Cash Outlay from Operating Budget (Tangible)
$Ut
ility
Ex
pens
esESPC Example n Minnesota State Statute §471.345
- Energy Efficiency Projects
n Energy savings pay for infrastructure improvements
n Energy savings guaranteed
n Ameresco to pursue grants, utility
© Ameresco, Inc. 2015, All Rights Reserved 4
= Utility Costs
= Project Payment
2
$ Expe
nses
1 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19Current Year
Utility Budget
Future Annual Energy Budgets After Energy Eff. Improvements
Re-Purposed Portion of Current Utility Budget to Finance Project Construction
20
Ameresco to pursue grants, utility rebates, local incentives, etc.
n Self-funded with little or no capital
n Project guaranteed up to 20 year term
n Finance Rates are still LOW
Key Differences Key Differences –– Benefits of Performance Contracting Benefits of Performance Contracting
Traditional Spec / Bid Performance-BasedLow bid awarded based on specifications (written by staff or consultant?)
Awarded based on performance & lifecycle costs
Project costs funded by capital budget Project Payments are offset by guaranteed cost savings freeing up capital for other non energy city project needs
Piecemeal approach based on available funding
Comprehensive approach(6 – 12 month project completion)
© Ameresco, Inc. 2015, All Rights Reserved 5
funding (6 – 12 month project completion)Up-front fee for evaluation/studies No up-front fee required
Performance & savings are not guaranteed
Long-term performance & savings are guaranteed
Contractors have no accountability to lifecycle costs Performance-based contractor is tied to
guaranteeing savings over term of contract
City assumes cost savings risk Ameresco shoulders cost savings guarantee and risk
Multiple contracts with multiple vendors One contract, single-point accountability
City of Mankato Use of EnergyCity of Mankato Use of Energy
Overall, the City spent approximately $ 2,535,256 in 2014 on gas and electric utilities for City Facilities and Infrastructure (Buildings, Water & Waste Water Treatment, Street Lighting, …etc). The chart below shows the breakdown between electric and gas costs. *
© Ameresco, Inc. 2015, All Rights Reserved 6
* Energy use costs are based on Data provided by the City of Mankato
1/8/2016
2
2014 Utility Consumption by Facilities 2014 Utility Consumption by Facilities Building or Facility Electric Gas
Public Works $ 2,317 $ 71,344 City Hall $ 88,178 $ -Parks $ 91,837 $ 30,233 Street Lights $ 367,728 $ 16,493 Water Treatment $ 409,873 $ 30,143 Waste Water Treatment $ 607,064 $ 124,724 Public Housing $ 114,729 $ 42,639 Convention Ctr $ 315,299 $ 114,712
© Ameresco, Inc. 2015, All Rights Reserved 7
NOTE: Preliminary Assessment Identified Facility Improvement Measures follow Minnesota Green Step Cities best practices for Buildings and Lighting
http://greenstep.pca.state.mn.us/recognition.cfm**
Ameresco Proud Sponsor of the• 2014 GreenSteps Cities Award• 2015 GreenSteps Cities Award
* Utilities based on data provided by City of Mankato
Convention Ctr $ 315,299 $ 114,712 Fire Halls $ 5,261 $ 12,692 Airport $ 59,026 $ 30,965
$ 2,061,311 $ 473,945
City of Mankato Opportunities for
Facility Improvement
© Ameresco, Inc. 2015, All Rights Reserved
Facility Improvement
LIGHTING Solutionsn Retrofit Interior/Exterior/Street Lighting
Fixtures w/ LED lighting technologyn Increase use of controls & sensors to
optimize operations.n Interconnect existing Energy Management
Control (EMS) system for unoccupied control
Lighting Improvements Lighting Improvements –– Interior, Exterior, Street LightsInterior, Exterior, Street Lights
© Ameresco, Inc. 2015, All Rights Reserved
controln Optimize light levels
Benefitsn Reduces energy and operating costsn Improves overall lighting qualityn Increases avoided future O&M and capital
cost needsn Improves work environmentn Reduces summer building cooling loads
9
LED Maintenance Cost Savings: 70LED Maintenance Cost Savings: 70--80%80%
0 4 8 12 16 20
HPS fixture
YEARS
RelampRelamp & reballast Relamp
Relamp & reballast
© Ameresco, Inc. 2015, All Rights Reserved
80% Less Maintenance (and Expense)
This schedule represents the average time to replace key components of both HID and LED cobra heads. The LED fixture requires far less maintenance.
HID ballast: every 8 years
HID lamp: every 4 years
Photocontrol: every 10 years
LED driver: every 13-17 years
Photocontrol every 20 years
0 4 8 12 16 20
LED fixture
YEARS
10
LED LED Light Technology Light Technology
n LEDs are rapidly becoming the light source of choice for application, beating other technologies in every category:– Color quality– Energy consumption– Service life (100,000+ hours for street lights)– Precise optical control (better uniformity)
© Ameresco, Inc. 2015, All Rights Reserved
– Precise optical control (better uniformity)– Dimming / Controllability– Lowest total cost of ownership
n No mercury in the product making it the ultimate green and environmental option
n LED directional control capabilities minimizes light pollution(ex: up-lighting)
11
Saves Mankato $$$ Saves Mankato $$$ –– Everyday!Everyday!
LED Street Lighting Benefitsn 60-75% average energy savings
over metal halide (HID) or high/low pressure sodium
n Low light level depreciation over time means your streets will always be bright
© Ameresco, Inc. 2015, All Rights Reserved 12
always be brightn Maintenance savings potential
300% plusOther Tangible Savings n Reduction work order
requests & maintenance paperwork
n Reduced procurement effort and materials inventory
1/8/2016
3
LED Street LightingLED Street Lighting
n Next Phase of Project Development will identify Implementation Costs and Guaranteed Energy Savings
© Ameresco, Inc. 2015, All Rights Reserved 13
n 100,000+ hours LED Node life (20+ years)
n Excess Annual Savings can be redirected to other unfunded city projects
Maintenance Savings ExampleMaintenance Savings Example
© Ameresco, Inc. 2015, All Rights Reserved 14
LED Parking Ramp Lighting UpgradeLED Parking Ramp Lighting UpgradeSouth West Transit Authority – Eden Prairie
© Ameresco, Inc. 2015, All Rights Reserved 15
LED Lighting High Pressure SodiumLumens = 4365 Lumens = 8550
Color Temp = 4000 K; CRI = 65 Color Temp = 2000 K; CRI = 22
Estimated Burn hrs. = 300,000 Estimated Burn hrs. = 24,000
Watts = 56 Watts = 115
Lighting Improvements / Restroom ImprovementsLighting Improvements / Restroom Improvements
RESTROOM Solutionsn Install water control devicesn Properly adjustment flow
for each individual porcelain fixtures
n Install water flow aerators
Benefits
© Ameresco, Inc. 2015, All Rights Reserved 16
Benefitsn Reduces water resource consumption n Lowers water/sewer and supplies costsn Improved fixture flow & operationn Future capital cost avoidance
Building EnvelopeBuilding Envelope
AIR INFILTRATION Solutionsn Seal Wall/Roof connectionsn Weather strip and caulk windows and doorsn Adjust exterior door closers for improved close
timing n Seal wall/roof penetrations
BenefitsReduces energy consumption while increasing
© Ameresco, Inc. 2015, All Rights Reserved
n Reduces energy consumption while increasing energy cost savings
n Eliminate air infiltrationn Improves moisture barrier
17
BUILDING CONTROL Solutionsn Upgrade remaining pneumatics controls to Direct Digital Controln Upgrade Energy Management program to optimize occupied
space set back operations and settingsn Standardize city wide control set pointsn Upgrade graphical display for easy operation, monitoring and
reportsn Install additional controls - CO2, CO, NO sensors for makeup and
Building Control Improvements Building Control Improvements
© Ameresco, Inc. 2015, All Rights Reserved
n Install additional controls - CO2, CO, NO sensors for makeup and outdoor air systems
Benefitsn Energy consumption/costs reductionn Enhanced operator controln 24/7 system wide troubleshooting and monitoringn Simple web access to all systems/buildings reportsn Improved comfort / work environmentn Historical trending for operational costs analysis
18
1/8/2016
4
Motor & Speed Control ImprovementsMotor & Speed Control Improvements
MOTOR AND SPEED CONTROL Solutionsn Upgrade remaining high
efficiency electric motorsn Implement variable speed
controls/drives to precisely match operational needs for Air Handling Units or Equipment
© Ameresco, Inc. 2015, All Rights Reserved 19
Handling Units or Equipment
Benefitsn Energy use/cost reductionn Increases equipment/motor life
cyclen Improved operational control of
building/equipmentn Capital cost avoidance for
equipment replacement (old motors)
Ventilation ImprovementsVentilation Improvements
Electrical Transformer Solutionsn Replace City owned Electrical
Transformers n Install New High Efficiency Transformer
units
Benefits
© Ameresco, Inc. 2015, All Rights Reserved 20
Benefitsn Energy Conservationn Reduced Summer building heat loadsn Extends life of Transformers (capital cost
avoidance)
AHU REPLACEMENT Solutionsn Replace Air Handling Units which are beyond life
expectancy as applicable (Office Spaces/Verizon Ctr.)n Install Energy Recovery systems where possiblen Modify existing units to maximize outdoor air
economizersn Covert Constant Volume to Variable Air Volume
(VAV) Systems
Ventilation ImprovementsVentilation Improvements
© Ameresco, Inc. 2015, All Rights Reserved
(VAV) Systemsn Recommissioning Existing Air Handlers for efficient
operations
Benefitsn Reduced fuel use and energy costsn Better comfort of occupied zonesn Extends life of productn Allows for improved space utilization and flexibility
21
Sanitary Lift Station ImprovementsSanitary Lift Station Improvements
Lift Station Solutionsn Investigate opportunities to make the
lift stations more energy efficient and monitor performance.
n Utilize soft starters or variable speed drives on the lift pumps where applicable
© Ameresco, Inc. 2015, All Rights Reserved
applicablen Utilize SCADA controls to remotely
monitor lift station operation
Benefitsn Reduced electrical demand chargesn Real time monitoring to manage costs
and maintain system integrity
17
Waste Water Treatment Plant ConsiderationsWaste Water Treatment Plant Considerations
WWTP Solutionsn Investigate positive displacement blower
unit(s) replacement water with alternative blower units.
n Investigate conversion air dispersion equipment in treatment process
Benefits
© Ameresco, Inc. 2015, All Rights Reserved
Benefitsn Reduced electrical energy consumption costs
and demand chargesn Reduce future operational maintenance costsn Reduce excessive equipment sound levelsn Improve BOD and COD control
18
Preliminary Savings Analysis
© Ameresco, Inc. 2015, All Rights Reserved
Savings Analysis
1/8/2016
5
Preliminary Utility Savings PotentialPreliminary Utility Savings PotentialElectricity Natural Gas Total Utility
Expense % Range Reduction
Savings Range Expense
% Range
Reduction
Savings Range Expense
% Range
Reduction
Savings Range
City of Mankato $2,061,311 5%-7% $103k-
$177k $ 473,945 10%-15% $47k-$75k $2,535,256 6%-8% $150k-
$215k
City of Mankato Proposed Energy Reduction
© Ameresco, Inc. 2015, All Rights Reserved 25
$-
$500,000
$1,000,000
$1,500,000
$2,000,000
$2,500,000
$3,000,000
2014 2016
$2,061,311 $1,917,019
$473,945 $402,854
Electricity Gas
n Operation & Maintenance (TBD) Lighting maintenance materials – lamps and ballasts
n Long-Term Operational Savings (TBD) Deferred Maintenance/Future Capital Costs Based on capital improvement projects selected
Additional Areas of Savings Potential To Be QuantifiedAdditional Areas of Savings Potential To Be Quantified
© Ameresco, Inc. 2015, All Rights Reserved 26
Potential Annual Savings Range - $75K - $104K+ / year
City of Mankato Cost Savings OpportunityCity of Mankato Cost Savings Opportunity
Annual Energy and Maintenance Costs Avoidance Savings
~ $220k-300kCost Savings each year *
20 year Performance Contract Project Size
Ameresco’s Preliminary Energy Assessment Findings
© Ameresco, Inc. 2015, All Rights Reserved 27
Contract Self Funded
Performance Contract
Project Size ~ $2.6M - $3.6M *
Self Funding Project Redirects a portion of Current Energy
Budget “No New Taxes”
Funded from Energy Savings, Future O&M and Capital Cost Avoidance, Est. Utility
Rebates - $75K+
* Based on 2014 annual energy consumption costs
Preliminary Project Scope and FundingPreliminary Project Scope and Funding
General List of Facility Improvements for Further Investigationn Lighting retrofits & controlsnWater conservation retrofitsn Lift Stationsn High efficiency transformersnWaste water treatment equip upgrades
n Building controls & automation
n Pneumatic to direct digital control
n Street light upgradenWater treatment Eqpt
© Ameresco, Inc. 2015, All Rights Reserved 28
Funding Sources to be fully evaluated in Detailed Analysisn Energy, operations and other short/long term budget savings
opportunitiesn Xcel Energy Rebates - $60K - $80K (based on final project scope)n Private or 3rd Party Financing n Other sources to be explored in detailed analysis
AMERESCO AMERESCO -- Asset SustainabilityAsset Sustainability
© Ameresco, Inc. 2015, All Rights Reserved 29
Development Process& Next Step
© Ameresco, Inc. 2015, All Rights Reserved
& Next Step
1/8/2016
6
Energy Performance Contract Energy Performance Contract -- Project Development StagesProject Development Stages
PreliminaryAnalysis(no cost)
Investment Grade Audit
Performance Agreement
n Introduce n Detailed Analysis n Project Planning
(6-9 Months)
ConceptApproval
Savings Monitoring
n Needs Assessment n Savings M&V
Long-Term Partnership Process from Concept through Savings Reconciliation
© Ameresco, Inc. 2015, All Rights Reserved 31
n Introduce Concept
n Build Consensus Administration City Council
n Letter to Proceed
Non-binding No Cost
n Detailed Analysis Utility Baseline
n Project Options Scope Funding Sources
n Energy Services Agreement
Development Costs carried Forward to Performance Agreement
n 3-4 Months
Project Planning
n Construction
n Commissioning
n Construction Measurement & Verification (M&V)
n 6 – 9 Months
Streamlined Implementation – Minimizes In-House Staff Time & Quicker Results
n Needs Assessment
n Project Goals
n Gather Information Budgets /Reports
n Site Surveys
n Feasibility Analysis
n 30 Days
n Savings M&V
n Annual Reports
n Annual Reconciliation
n Over Term of Agreement
Scope of Detailed AnalysisScope of Detailed Analysis
n Engineering design with project scope for each Facility Improvement Measures (FIM)
n Ameresco to establish energy cost savings for FIM
n Quantify utility rebates and other available incentives
© Ameresco, Inc. 2015, All Rights Reserved
n Prioritize facility improvement measures
n Recommended project & options
n Cash flow analyses
n Approximately 90-120 days to complete
32
Next StepNext Step
Council Resolutionn Present Preliminary Assessment Findings to Counciln Council approves Project Development Agreement to
develop a self-funding Energy Savings projectn Ameresco will complete a Detailed Analysis to identify a
self-funding project, or there is No Cost to City of
© Ameresco, Inc. 2015, All Rights Reserved 33
self-funding project, or there is No Cost to City of Mankato
n There are No Up-Front costs to proceed at this timen Should a viable self-funding project not be approved for
implementation, an “exit fee” of $65k to $85k* would be due to Ameresco to cover a portion of incurred engineering expenses
* Dependent on agreed upon Project Scope in the Project Development Agreement
Key Project Milestones & Preliminary TimelineKey Project Milestones & Preliminary Timeline
Milestones Preliminary TimelineCouncil Resolution – Project Development Agreement Dec 2015
Deliver Detailed Findings & Recommendations to Council March 2016
© Ameresco, Inc. 2015, All Rights Reserved 34
Recommendations to CouncilCouncil Facility Improvement Selection April 2016
Council Approves Project and Financing Option May 2016
Implementation Phase Begins June 2016
Construction Acceptance January 2017
AMERESCO Information and ResourcesAMERESCO Information and Resources
© Ameresco, Inc. 2015, All Rights Reserved 35
Thank You!
1/8/2016
1
Sustainable Asset Management Planning
with AssetPlanner
Asset Sustainability
Marc RetishBusiness Manager
Ameresco
The Need for Sustainable Portfolio Planning
Confidential & Proprietary Copyright 2012
Physical Asset Criteria• Building Condition Needs• Unfunded Liability• FCI
Utilization Criteria
Real Estate Criteria•Asset Valuation •Land Valuation
Financial Criteria
Tools Tools ProcessesProcesses
& &
Decision Development Framework
Utilization Criteria•Facility utilization•Accommodation planning•Space use•Own vs. lease
EnvironmentalCriteria
• Carbon Footprint•Energy Conservation•Renewable Solutions
Financial Criteria•Capital Costs•Operating Costs•Capital Creation Strategies•Incentives
& & PoliciesPolicies
• Increase current funding
• Short-term operational savings
Establish Targets
Identify
• Deferred maintenance (DM)
• Facility Condition Index (FCI)
• Unfunded Liability (UL)
• Energy Intensity (kWh/ft2)NEEDSNEEDS
STRATEGIES
Asset Optimization & Decision Development
• Short-term operational savings
• Long-term savings strategies
• Redevelopment strategies, …
Identify Solutions
Execute• Funding sources
• Annual budgets
• Projects (budget/schedule/quality)
• Accountability / Transparency
STRATEGIES & SOLUTIONS
IMPLEMENTATIONIMPLEMENTATION
Copyright 2012
Unique Data Development : Best Practicesü Quickly establish Life Cycle cost profiles for all assets utilizing data
modeling techniques
ü Consistency and Standardization
§ Incorporation of existing Data
Validation of Asset Templates:
Basic Asset Details:§ Age§ Size
Data Development Process
Fully Developed Life Cycle Needs (30 – 90 days)
DATA VALIDATION
existing Data Sources
§ Staff Interviews
§ Targeted On-site Validation
Life CycleProfile foreach Asset
MODEL
Life CycleCost
“Templates”
§ Size§ Number of
Floors§ Use / Type
of Asset
Confidential & Proprietary Copyright 2012
§ Facility Name§ Facility Age§ Facility Size§ Number of Floors§ Facility Type:
Basic Asset Details Required:
Basic Asset Details
Confidential & Proprietary Copyright 2012
§ Facility Type:§ Admin§ Public Safety (Police,
Fire, etc…)§ Wastewater§ Engineering§ Etc.
1/8/2016
2
Mechanical§ Heating Systems§ Ventilation Systems§ Air Conditioning§ Plumbing / Drainage§ Building Controls§ Fire Prevention
Electrical§Power & Distribution§Interior Lighting§Exterior Lighting§Emergency Power§Fire Alarm System§Comm / IT Systems§Security Systems§Clock Systems
Component Inventory
Confidential & Proprietary Copyright 2012
Property / Site§ Roadways / Driveways§ Paving & Walkways§ Retaining Walls§ Landscaping§ Fencing§ Underground Utilities
Architectural / Structural§ Roofing, Windows, Exterior Doors§ Foundation & Exterior Walls§ Flooring & Ceilings§ Interior Walls / Doors / Millwork§ Painting & Window Coverings§ Accessories & Equipment
Wireless Download from Asset Planner
iAuditorTM - Data Capture and Management
Confidential & Proprietary Copyright 2012
Wireless Upload to Asset Planner
for QC
Assess Facilities using iAuditor
ComponentComponent
Replacement Value
Component What & Where Component Commentary (Condition, etc.)
Component Data Source
Overall Condition
Action Brief Description Action Commentary Action Type Action Cost Photos
B2010 Exterior Walls $1,231,780
The principal exterior cladding at the building consists of brick veneer. Certain areas of the buildings structural concrete frame also acts as the exterior wall assembly.
The condition of the exterior wall assembly is good at this time. No areas of masonry cracking or spalling were identified. The concrete wall areas are in good condition with no areas of spalling identified. The exterior cladding system underwent rehabilitation in 2006 to repair problem
Validated Good Repair exterior walls
This item is a cyclical allowance towards major repairs of the exterior masonry walls and the concrete shear walls. It is our experience that, while these components typically last for the life of the building, however, fairly major repairs are required from time to time. It is difficult to establish exactly
Repair $225,400
B2020 Exterior Windows $558,000
These components are constructed of good quality thermal glazing with aluminum frames. These components are very durable and should provide a service life of at least 40 years. However, less durable components (e.g., hardware weatherstripping.)
The window frames are in good condition with no significant problems noted. No major work is anticipated with these components within the time frame of this study.
Validated Good Replace entire window system
No failed thermal panes were observed at the areas reviewed. Weatherstripping generally appeared intact and in sufficiently good condition to serve its intended function .
Replacement $558,000
B2030 Exterior Doors $9,800These doors are typically constructed of steel and are usually very durable.
All exterior doors are functional and in satisfactory condition. Validated Good
Replace or refurbish the exterior doors and their hardware. Replacement $9,800
B30 Roofing $204,000
The main flat roof consists of an inverted membrane. The membrane is concealed by the overlaying thermal insulation and gravel ballast. Terrace areas at the north end of the building exist at the 6th, 5th and 4th
No significant problem areas were noted other than weed growth beneath/between the pavers at some of the terrace areas that should be removed as a maintenance Item. No reports were given with respect to suspected water leakage. No
Validated Fair
Remove the existing ballast and thermal insulation, remove the existing waterproofing membrane, install new roofing and replace the existing insulation and ballast.
Replacement $204,000
Step 1: Validated Condition Report
Confidential & Proprietary Copyright 2012
floors. suspected water leakage. No significant work requirements are
C20 Stairs $616,616 Stairs Life Cycle Model Good
D1010 Elevators & Lifts $30,000
The existing elevator cabs had been completely refurbished with new tile flooring, mirrored panels, and stainless steel trims in approximately 1999. The building is provided with 2 Northern geared traction elevators.
The finishes are in acceptable condition and no remedial work is anticipated during the study period. As per the work program, the service provider for elevator maintenance was contacted to discuss the condition of the devices and the requirements for any expected remedial work within the
Validated GoodModernization of elevator motors and controls. Repair $30,000
D2020 Domestic Water Distribution $300,000
The units are aging and failing on a regular basis. The capital plan should allow for a replacement of at least 15 Units per year which allows for a 10% replacement factor. Domestic hot water is circulated continuously through the building.
The building is at the age where domestic water lines typically experience pinholing particularly at the hot water riser line and replacement needs to be planned. Various leaks and repairs of pin-holes has been reported to have commenced at the building. The pumps were not
Validated Fair
Replace domestic hot and cold water risers to the suites in a phased approach coordinated with suite bathroom work.
Replacement $60,000
D2030 Sanitary Waste $200,000
Drainage piping consists of cast iron stacks that convey waste-water from the suites and common areas to the municipal sewer system. Duplex sump pump systems are located in the sub-basement area below the commercial kitchen area.
Drainage piping is not under pressure and generally lasts for the life of the building except for isolated repair. No significant repair requirements are anticipated. The pumps are located in pits and cannot be directly reviewed. There was no alarm condition and the pumps operated satisfactorily in the
Validated GoodAllowances to replace or repair sections of the drainage piping as needed.
Includes both sanitary and rain water drainage piping Replacement $8,000
D2095 Domestic Water Heaters $25,000
Domestic hot water for the building is provided by 2 Teledyne Laars Model PW 1010 boilers with an input of 1000 MBH each. The domestic hot water is stored in a
vertical tank adjacent to the boilerinstallation in the mechanical penthouse of the building
The domestic water boilers are known to be a quality product and no problems were observed or reported to Enerplan during our reviews. Replacement of the boilers is not anticipated to be required within the time frame of this study. No problems with the tank were observed or
Validated Good Replace domestic water heaters Replacement $40,000
Life Cycle Report
ComponentComponent : Replacement
Value
Last Major Action Year
Component : Brief DescriptionOverall
ConditionYear 1 Year 2 Year 3 Year 4 Year 5 Year 6 Year 7
A10 Foundations $ 5,096 1902 The foundation walls appear to GoodA20 Basement Construction $ 48,256 1902 Poured concrete basement floor. GoodB2010 Exterior Walls $ 20,000 1986 Aluminum siding. GoodB2020 Exterior Windows $ 9,454 1996 Windows and caulking. Good $ 9,800B2030 Exterior Doors $ 20,467 1902 The majority of doors were GoodB30 Roofing $ 2,846 2002 Asphalt shingle roof. GoodC1020 Interior Doors $ 23,774 1902 Doors. Poor $ 23,774C1030 Fittings $ 15,844 2005 Kitchen. GoodC3010 Wall Finishes $ 19,500 2005 Wall finishes. Good $ 3,400 $ 3,400 $ 3,400C3020 Floor Finishes $ 9,815 2005 Hardwood flooring. GoodC3020 Floor Finishes $ 9,815 2005 Ceramic tile. GoodC3020 Floor Finishes $ 9,815 2005 Carpet. Good $ 245C3030 Ceiling Finishes $ 13,790 2005 Paint on plaster ceilings. Good $ 1,720 $ 1,720 $ 1,720D2010 Plumbing Fixtures $ 44,834 2005 Plumbing fixtures. GoodD2020 Domestic Water Distribution $ 24,461 1995 Water supply piping. GoodD2030 Sanitary Waste $ 22,968 1902 Sanitary Waste Piping Fair $ 22,968
D2040 Rain Water Drainage $ 2,220 1967Eaves troughs, downspouts, soffit, and fascia.
Poor $ 1,560
D2095 Domestic Water Heaters $ 2,941 2003 Gas fired water tank. FairD3023 Furnaces $ 2,434 1997 Forced air gas furnace. Good $ 12,400D3045 Exhaust Ventilation Systems $ 2,517 2005 Exhaust fans. Good $ 900
Confidential & Proprietary Copyright 2012
D3045 Exhaust Ventilation Systems $ 2,517 2005 Exhaust fans. Good $ 900D5010 Electrical Service And Distribution $ 11,830 1902 Electricity is distributed to all GoodD5021 Branch Wiring $ 44,845 1902 GoodD5022 Lighting Equipment $ 9,937 2005 Lighting fixtures. Good
D5037 Fire Alarm System $ 2,772 2003Smoke detectors and pull stations.
Good
D5091 Exit & Emergency Light Systems $ 1,200 2001 Emergency lighting. Poor $ 2,550D5098 Electric Baseboard Heat 1902 GoodE1041 Residential Appliances $ 8,580 2001 Refrigerators, freezers, and Poor $ 1,200E1042 Laundry Room Equipment $ 10,000 1902 Washers and dryers. Good $ 600G2010 Roadways $ 1,200 1902 Driveway. Poor $ 1,200G2020 Parking Lots $ 9,500 1902 Parking Lot. Poor $ 9,500G2030 Pedestrian Paving $ 1,217 2004 Concrete pad. GoodG2040 Site Development $ 1,529 1991 Fencing. GoodG2050 Landscaping $ 1,200 1902 Plantings and landscaping. The Good $ 1,200G3030 Storm Sewer $ 3,000 1902 Surface drainage. The property is GoodG4020 Site Lighting $ 1,000 1986 Site Lighting Good
$ 29,084 $ 10,700 $ 22,968 $ 0 $ 6,865 $ 5,120 $ 28,520
Cumulative Renewal Requirement = $ 29,384 $ 39,785 $ 62,753 $ 62,753 $ 69,618 $ 74,738 $ 103,258Funding : Cumulative = $ 3,025 $ 6,050 $ 9,074 $ 12,099 $ 15,124 $ 18,149 $ 21,174
Unfunded Liability = $ 26,359 $ 33,735 $ 53,679 $ 50,654 $ 54,494 $ 56,589 $ 82,085(Benchmark Cost based on Template) FCI = 7.91% 14.65% 20.74% 21.98% 23.82% 25.37% 30.24%
FCI without Funding 8.77% 16.38% 23.32% 25.43% 28.13% 30.54% 36.27%
• Develop Decision Mapping• Asset Planning Framework
• Quantify Capital Renewal Needs
Renewal Costs Per YearUnfunded Liability
NEEDS NEEDS REVIEWREVIEW
(Capital Renewal)(Capital Renewal)
Needs Review (Dashboards)
• Quantify Capital Renewal Needs • Data Development &
Management
• 5 & 30 Year Capital Plan • Life Cycle Profiles• On-site assessments
• Capital Creation Strategies• Benchmark High level
savings opportunitiesFCI Targets
& Capital NeedsLife Cycle Output
Projected Capital Needs
Confidential & Proprietary Copyright 2012
Anticipated Funding Level
1/8/2016
3
Projected Unfunded Liability
Confidential & Proprietary Copyright 2012
Unfunded Liability
Sustainability Target
§ Industry Standard Index Used to Track Condition Performance of Facilities / Portfolios
FCI =Renewal and Repair Costs
Replacement Cost
Facility Condition Index (FCI)
GOOD Range: FCI (0% - 5%)FAIR Range: FCI (5% - 10%)POOR Range: FCI (10%-30%)
CRITICAL Range: FCI (> 30%)
Sustainability TargetSustainability Target
FCI (Current Year)
FCI (Year 5)
FCI (Year 10)
FCI (Year 15)
FCI (Year 20)
FCI (Year 25)
0.0% 10.0% 9.7% 29.0% 49.3% 54.1%
0.3% 7.4% 13.5% 19.9% 48.0% 51.2%
17.5% 31.6% 42.0% 50.9% 53.5% 55.4%
4.5% 8.5% 22.0% 33.8% 45.8% 49.4%
5.3% 5.0% 15.4% 37.1% 42.9% 48.2%
0.0% 0.0% 3.4% 6.3% 9.5% 30.5%
Asset AAsset BAsset CAsset DAsset EAsset F
FCI Migration Analysis
0.0% 0.0% 3.4% 6.3% 9.5% 30.5%
2.9% 7.0% 25.2% 37.0% 42.1% 46.0%
20.6% 29.5% 34.2% 44.5% 64.1% 68.1%
6.6% 14.4% 24.7% 25.6% 44.1% 55.5%
7.0% 8.0% 24.4% 30.6% 38.5% 55.9%
26.1% 30.9% 37.4% 42.8% 47.9% 49.9%
0.0% 0.0% 1.4% 17.9% 33.6% 40.6%
Asset FAsset GAsset HAsset IAsset JAsset KAsset L
Projected Facility Condition Index
Critical FCI
Copyright 2011
Poor FCI
Sustainability Target
Projected Funding Target
Critical FCI
Poor FCI
Copyright 2011
Poor FCI
Sustainability Target
Asset Optimization
STRATEGIES
ü Quantify Needs (Ops/Cap)ü 5 & 30 Year Capital Planü Dynamic Data Management
ü Capital Leveragingü Energy & Renewable Solutionsü Redevelopment Strategies
ü Efficient Design
NEEDS
Confidential & Proprietary Copyright 2012
STRATEGIES & SOLUTIONS
IMPLEMENTATION
Efficient Designü Streamlined Tenderingü Construction Managementü Affordable Constructionü Green Technology
1/8/2016
4
Projected Unfunded Liability
Unfunded Liability
Sustainability Target
Capital Creation Strategy
Short Term Energy Savings
ReducedUnfundedLiability
Sustainability Target
Maintenance and Operating Savings
Capital Creation Strategy
Reduced Unfunded LiabilitySustainability Target
Longer Term Savings – Deep Retrofits
Capital Creation Strategy
Copyright 2011
ReducedUnfunded Liability
Sustainability Target
Real Estate & Community PartnershipStrategies
Capital Creation Strategy
Copyright 2011
ReducedUnfunded Liability
Sustainability Target
FCI Reduction Strategy
Confidential & Proprietary Copyright 2011
Extended Life = 16 Years
5%
10%
30%
1/8/2016
5
Outcomes Enhancing “Quality of Municipal Space ”
• 1. Understanding and quantifying capital replacement needs
• 2. Data management methods and accountability reporting
• 3. Enhanced decision making framework utilizing best practices
Strategic Outcomes
• 4. Enhanced asset value
• 5. Asset sustainability
• 6. Optimal use of capital dollars
• 7. Provides leveraged and bundled solutions