easy-nlc ii preinstallation requirements guide · 2017-07-21 · designated for the easy-nlc ii...

30
EASY-nLC II Preinstallation Requirements Guide 60053-97028 Revision B October 2010

Upload: others

Post on 06-Apr-2020

7 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: EASY-nLC II Preinstallation Requirements Guide · 2017-07-21 · designated for the Easy-nLC II system. 2. Your EASY-nLC II system is on site. 3. Personnel experienced in handling

EASY-nLC II

Preinstallation Requirements Guide

60053-97028 Revision B October 2010

Page 2: EASY-nLC II Preinstallation Requirements Guide · 2017-07-21 · designated for the Easy-nLC II system. 2. Your EASY-nLC II system is on site. 3. Personnel experienced in handling

© 2010 Thermo Fisher Scientific Inc. All rights reserved.

EASY-nLC is a trademark and Xcalibur is a registered trademark of Thermo Fisher Scientific in the United States.

Thermo Fisher Scientific Inc. provides this document to its customers with a product purchase to use in the product operation. This document is copyright protected and any reproduction of the whole or any part of this document is strictly prohibited, except with the written authorization of Thermo Fisher Scientific Inc.

The contents of this document are subject to change without notice. All technical information in this document is for reference purposes only. System configurations and specifications in this document supersede all previous information received by the purchaser.

Thermo Fisher Scientific Inc. makes no representations that this document is complete, accurate or error-free and assumes no responsibility and will not be liable for any errors, omissions, damage or loss that might result from any use of this document, even if the information in the document is followed properly.

This document is not part of any sales contract between Thermo Fisher Scientific Inc. and a purchaser. This document shall in no way govern or modify any Terms and Conditions of Sale, which Terms and Conditions of Sale shall govern all conflicting information between the two documents.

Release history: Revision A, September 2010; Revision B, October 2010

Software version: EASY-nLC II version 2.8, EASY-nLC Virtual Instrument (driver)

For Research Use Only. Not for use in diagnostic procedures.

Page 3: EASY-nLC II Preinstallation Requirements Guide · 2017-07-21 · designated for the Easy-nLC II system. 2. Your EASY-nLC II system is on site. 3. Personnel experienced in handling

IMPORTANT PREINSTALLATION INFORMATION... PLEASE READ

EASY-nLC II Installation Request FormDear User:

Read the EASY-nLC II Preinstallation Requirements Guide, and then print and complete the following installation request form. After all items on the form are fulfilled, sign and date the form. Then, mail or fax this form to your local Thermo Fisher Scientific sales/service office. The address and fax number for your local office are located on the following pages.

Print your name, company name, and company address clearly below:Name _______________________________________________________

Company _____________________________________________________ Telephone____________________

E-mail address _____________________________________________________________________________

Address ___________________________________________________________________________________

City ______________________________________ State _____________ Country______________________

Signature _____________________________________________________ Date ________________________

Continue on the back of this page.

Have any special acceptance specifications been agreed to in the contract? Yes No If YES, attach full details of specifications.

Is there any additional equipment that needs to be interfaced to the system? Yes No If YES, attach full details of additional equipment.

Note We reserve the right to invoice against the engineer’s time if the installation requirements are not met on the date of the installation.

1. Sufficient space on workbench has been designated for the Easy-nLC II system.

2. Your EASY-nLC II system is on site.3. Personnel experienced in handling contact

closure connection to the detector are available.4. Doorways, hallways, and so on are a minimum

width of 94 cm (37 in.).5. Sufficient bench space is available for all of the

equipment. List the following:Width: ____________________________Depth: ____________________________Height: ____________________________

6. Workbench can support the load of the system [42 kg (92.6 lb)] and is free from vibration.

7. Lighting is adequate.8. Main power is installed and is in compliance with

local electrical codes.9. Relative humidity is between 20 and 80% with

no condensation.10. Air conditioning is adequate for temperature,

humidity, and particulate matter control. The laboratory can be maintained at a constant temperature, between 5 and 30 °C (41 and 86 °F).

11. Transfer line compatible with supplied fittings from analytical column to detector is available.

12. A tuned nano-ESI source capable of stable spray at nanoflow is available.

13. Degassed and uncontaminated solvent A (water/formic acid), anddegassed and uncontaminated solvent B (acetonitrile/formic acid) are available for testing the performance of your instrument.

14. A network connection is available for the Easy-nLC II system.

15. One voice telephone line is installed near the system.

16. All relevant safety regulations are complied with.17. Primary detector (type, make, and model) that

you will use with the EASY-nLC II system:______________________________________

18. Software application and version that you will use for the detector:______________________________________

Page 4: EASY-nLC II Preinstallation Requirements Guide · 2017-07-21 · designated for the Easy-nLC II system. 2. Your EASY-nLC II system is on site. 3. Personnel experienced in handling

In the U.S. and Canada send to:...................................Attn: Installation Coordinator...................................Fax: [1] 877-373-4006...................................E-mail: [email protected]

Note After receiving this checklist, your local field service representative will contact you to schedule installation.

Page 5: EASY-nLC II Preinstallation Requirements Guide · 2017-07-21 · designated for the Easy-nLC II system. 2. Your EASY-nLC II system is on site. 3. Personnel experienced in handling

North America

United States1400 North Point Pkwy #10West Palm Beach, FL 33407E-mail:[email protected]

Phone......................... [1] 800 532 4752Fax ............................. [1] 877 373 4006

Canada2845 Argentia Road, Unit 4Mississauga, Ontario, L5N 8G6E-mail:[email protected]

Phone......................... [1] 800 530 8447Fax ............................. [1] (905) 890-9161

Europe

AustriaWehlistrasse 27b A-1200 Wien E-mail: [email protected]

Phone......................... [43] (0) 1 333 50 34-0Fax ............................. [43] (0) 1 333 50 34-26

BelgiumClintonpark “Keppekouter”Ninovesteenweg 198B-9320 ERMEBODEGEM - AALSTE-mail: [email protected]

Phone......................... [32] (0) 2 482 3030Fax ............................. [32] (0) 2 482 3031

DenmarkFruebjergvej 32100 København ØE-mail: [email protected]

Phone......................... [45] (70) 236267Fax ............................. [45] (70) 236263

Finland—see “Sweden, Norway, and Finland”

France(Also representing French-speaking North Africa, Algeria, Morocco, and Tunisia)

16 Avenue du QuébecSilic 765Z.A. de CourtaboeufF-91963 Les Ulis Cédex E-mail: [email protected]

Phone.........................[33] (0) 1 60 92 49 50 Fax .............................[33] (0) 1 60 92 48 99

Germany Im Steingrund 4-6D-63303 DreieichE-mail: [email protected]

Phone.........................[49] (0) 6103 408 1050Fax .............................[49] (0) 6103 408 1213

ItalyStrada Rivoltana I-20090 Rodano (Milano) E-mail: [email protected]

Phone.........................Numero Verde (800) 823 162Fax .............................[39] (02) 95320 225

NetherlandsTakkebijsters 1NL-4817 BL Breda E-mail: [email protected]

Phone.........................[31] (0) 76 579 55 55Fax .............................[31] (0) 76 581 09 61

Norway—see “Sweden, Norway, and Finland”

Spain

C/Valportillo I, no22 1a PlantaEdificio CaobaES-28108 Alcobendas - MadridE-mail: [email protected]

Phone.........................[34] (914) 845 965Fax .............................[34] (914) 843 598

Sweden, Norway, and FinlandPyramidbacken 3S-141 75 Kungens Kurva (Stockholm)SwedenE-mail: [email protected]

Phone.........................[46] (0) 8 556 468 20Fax .............................[46] (0) 8 556 468 08

Service Offices for Thermo Scientific SID ProductsFor up-to-date contact information, visit www.thermoscientific.com/wps/portal/ts/contactus.

Notes: The country code is enclosed in square brackets [ ]. The city code or area code is enclosed in parenthesis ( ). For countries other than the U.S., when you aredialing from within the specified country, dial the 0 of the city code. For countries other than Italy, when you are dialing from outside the country, do not dial the 0 ofthe city code.

Page 6: EASY-nLC II Preinstallation Requirements Guide · 2017-07-21 · designated for the Easy-nLC II system. 2. Your EASY-nLC II system is on site. 3. Personnel experienced in handling

Europe—continued

SwitzerlandNeuhofstrasse 114153 ReinachE-mail: [email protected]

Phone......................... [41] (617)16 77 40Fax ............................. [41] (617)16 77 20

United KingdomStafford House1 Boundary ParkBoundary WayHemel Hempstead Hertfordshire HP2 7GE E-mail: [email protected]

Phone ........................ [44] (0) 870 241 1034Fax ............................. [44] (0) 1442 233 667

Australasia and Asia

AustraliaP.O. Box 90925 Caribbean DriveScoresby, VIC 3179 E-mail: [email protected]

Phone......................... [61] 39757 4300Fax ............................. [61] 9763 1169

JapanC-2F 3-9 Moriya-cho, Kanagawa-kuYokohama 221-0022E-mail: [email protected]

Phone......................... [81] (45) 453-9100Fax ............................. [81] (45) 453-9110

P.R. China7th Floor, 7F Tower West, Younghe PlazaNo. 28, Andingmen East StreetBeijing 100007E-mail: [email protected]

Phone (free lines).......800 810 5118, 400 650 5118 Fax ............................. [86] 10 88370548

Service Offices for Thermo Scientific SID Products–Cont’d

Page 7: EASY-nLC II Preinstallation Requirements Guide · 2017-07-21 · designated for the Easy-nLC II system. 2. Your EASY-nLC II system is on site. 3. Personnel experienced in handling

Regulatory Compliance

Thermo Fisher Scientific performs complete testing and evaluation of its products to ensure full compliance with applicable domestic and international regulations. When the system is delivered to you, it meets all pertinent electromagnetic compatibility (EMC) and safety standards as described in the next section or sections by product name.

Changes that you make to your system may void compliance with one or more of these EMC and safety standards. Changes to your system include replacing a part or adding components, options, or peripherals not specifically authorized and qualified by Thermo Fisher Scientific. To ensure continued compliance with EMC and safety standards, replacement parts and additional components, options, and peripherals must be ordered from Thermo Fisher Scientific or one of its authorized representatives.

EMC Directive 89/336/EEC

EMC compliance has been evaluated by DELTA Denmark. For further information, refer to the “Declaration of Conformity” in the preface of the EASY-nLC II User Guide.

Low Voltage Safety Compliance

This device complies with Low Voltage Directive 2006/95/EEC evaluated by Intertek Group plc and harmonized standard EN 61010-1.

FCC Compliance Statement

THIS DEVICE COMPLIES WITH PART 15 OF THE FCC RULES. OPERATION IS SUBJECT TO THE FOLLOWING TWO CONDITIONS: (1) THIS DEVICE MAY NOT CAUSE HARMFUL INTERFERENCE, AND (2) THIS DEVICE MUST ACCEPT ANY INTERFERENCE RECEIVED, INCLUDING INTERFERENCE THAT MAY CAUSE UNDESIRED OPERATION.

CAUTION Read and understand the various precautionary notes, signs, and symbols contained inside this manual pertaining to the safe use and operation of this product before using the device.

Page 8: EASY-nLC II Preinstallation Requirements Guide · 2017-07-21 · designated for the Easy-nLC II system. 2. Your EASY-nLC II system is on site. 3. Personnel experienced in handling

Notice on Lifting and Handling ofThermo Scientific Instruments

For your safety, and in compliance with international regulations, the physical handling of this Thermo Fisher Scientific instrument requires a team effort to lift and/or move the instrument. This instrument is too heavy and/or bulky for one person alone to handle safely.

Notice on the Proper Use ofThermo Scientific Instruments

In compliance with international regulations: Use of this instrument in a manner not specified by Thermo Fisher Scientific could impair any protection provided by the instrument.

Notice on the Susceptibility to Electromagnetic Transmissions

Your instrument is designed to work in a controlled electromagnetic environment. Do not use radio frequency transmitters, such as mobile phones, in close proximity to the instrument.

For manufacturing location, see the label on the instrument.

Page 9: EASY-nLC II Preinstallation Requirements Guide · 2017-07-21 · designated for the Easy-nLC II system. 2. Your EASY-nLC II system is on site. 3. Personnel experienced in handling

WEEE Compliance

This product is required to comply with the European Union’s Waste Electrical & Electronic Equipment (WEEE) Directive 2002/96/EC. It is marked with the following symbol:

Thermo Fisher Scientific has contracted with one or more recycling or disposal companies in each European Union (EU) Member State, and these companies should dispose of or recycle this product. See www.thermo.com/WEEERoHS for further information on Thermo Fisher Scientific’s compliance with these Directives and the recyclers in your country.

WEEE Konformität

Dieses Produkt muss die EU Waste Electrical & Electronic Equipment (WEEE) Richtlinie 2002/96/EC erfüllen. Das Produkt ist durch folgendes Symbol gekennzeichnet:

Thermo Fisher Scientific hat Vereinbarungen mit Verwertungs-/Entsorgungsfirmen in allen EU-Mitgliedsstaaten getroffen, damit dieses Produkt durch diese Firmen wiederverwertet oder entsorgt werden kann. Mehr Information über die Einhaltung dieser Anweisungen durch Thermo Fisher Scientific, über die Verwerter, und weitere Hinweise, die nützlich sind, um die Produkte zu identifizieren, die unter diese RoHS Anweisung fallen, finden sie unter www.thermo.com/WEEERoHS.

Page 10: EASY-nLC II Preinstallation Requirements Guide · 2017-07-21 · designated for the Easy-nLC II system. 2. Your EASY-nLC II system is on site. 3. Personnel experienced in handling

Conformité DEEE

Ce produit doit être conforme à la directive européenne (2002/96/EC) des Déchets d'Equipements Electriques et Electroniques (DEEE). Il est marqué par le symbole suivant:

Thermo Fisher Scientific s'est associé avec une ou plusieurs compagnies de recyclage dans chaque état membre de l’union européenne et ce produit devrait être collecté ou recyclé par celles-ci. Davantage d'informations sur la conformité de Thermo Fisher Scientific à ces directives, les recycleurs dans votre pays et les informations sur les produits Thermo Fisher Scientific qui peuvent aider la détection des substances sujettes à la directive RoHS sont disponibles sur www.thermo.com/WEEERoHS.

Page 11: EASY-nLC II Preinstallation Requirements Guide · 2017-07-21 · designated for the Easy-nLC II system. 2. Your EASY-nLC II system is on site. 3. Personnel experienced in handling

Thermo Scientific EASY-nLC Preinstallation Requirements Guide xi

C

Preface . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .xiiiRelated Documentation . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .xiiiSafety and Special Notices . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .xivContacting Us . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . xv

Chapter 1 Introduction . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .1

Chapter 2 Site Preparation. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .3Shipping . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3Placement . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 4Telephone . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 4

Chapter 3 Operating Environment. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .5Lab Requirements . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 5

Power . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 5Temperature and Humidity . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 5Solvents . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 6Connections . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 6Detector . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 6Trainees. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 6

IT Requirements . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 6Network . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 6Contact Closure . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 7Detector Software . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 7

Chapter 4 Installation . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .9Demonstration . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 9Preventive Maintenance . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 9

Chapter 5 Instrument Arrival . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .11U.S. and Canadian Shipments. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 11International Shipments . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 12

Index . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .13

Contents

Page 12: EASY-nLC II Preinstallation Requirements Guide · 2017-07-21 · designated for the Easy-nLC II system. 2. Your EASY-nLC II system is on site. 3. Personnel experienced in handling
Page 13: EASY-nLC II Preinstallation Requirements Guide · 2017-07-21 · designated for the Easy-nLC II system. 2. Your EASY-nLC II system is on site. 3. Personnel experienced in handling

Thermo Scientific EASY-nLC Preinstallation Requirements Guide xiii

P

Preface

This preinstallation requirements guide describes what you as the customer must do to prepare for the installation of the Thermo Scientific EASY-nLC™ II (nano liquid chromatography) system for analytical runs. Prior to delivery of your system and before making an installation appointment with the field service engineer, use this guide in planning and preparing your lab site. Read each section carefully to ensure that your laboratory is ready for the system installation.

To suggest changes to documentation or to Help

Complete a brief survey about this document by clicking the link below.Thank you in advance for your help.

Related DocumentationIn addition to this guide, Thermo Fisher Scientific provides the following documents for the EASY-nLC II system:

• EASY-nLC II User Guide

• EASY-nLC Virtual Instrument for Xcalibur Quick Reference

Contents

• Related Documentation

• Safety and Special Notices

• Contacting Us

Page 14: EASY-nLC II Preinstallation Requirements Guide · 2017-07-21 · designated for the Easy-nLC II system. 2. Your EASY-nLC II system is on site. 3. Personnel experienced in handling

Preface

xiv EASY-nLC Preinstallation Requirements Guide Thermo Scientific

Safety and Special NoticesMake sure to observe the safety and special notices that appear in boxes.

The following two stickers appear on the EASY-nLC II HPLC instrument:

This sticker indicates that care should be taken to prevent personal injury or damage to parts of the EASY-nLC II system.

This sticker alerts you to consult this manual for instructions on how to operate the HPLC.

Safety and special notices include the following:

CAUTION Highlights hazards to humans, property, or the environment. Each CAUTION notice is accompanied by an appropriate CAUTION symbol.

IMPORTANT Highlights information necessary to prevent damage to software, loss of data, or invalid test results; or may contain information that is critical for optimal performance of the system.

Note Highlights information of general interest.

Tip Highlights helpful information that can make a task easier.

Page 15: EASY-nLC II Preinstallation Requirements Guide · 2017-07-21 · designated for the Easy-nLC II system. 2. Your EASY-nLC II system is on site. 3. Personnel experienced in handling

Preface

Thermo Scientific EASY-nLC Preinstallation Requirements Guide xv

Contacting UsThere are several ways to contact Thermo Fisher Scientific for the information you need.

To contact Technical Support

Find software updates and utilities to download at mssupport.thermo.com.

(U.S. and Canada) To contact Customer Service for ordering information

For all other sales and service contacts for Thermo Scientific SID products, see “Service Offices for Thermo Scientific SID Products” on page v.

To copy manuals from the Internet

Go to mssupport.thermo.com, agree to the Terms and Conditions, and then click Customer Manuals in the left margin of the window.

To suggest changes to documentation or to Help

• Fill out a reader survey online at www.surveymonkey.com/s/PQM6P62.

• Send an e-mail message to the Technical Publications Editor at [email protected].

Phone (Europe) (+45) 6557 2300 (U.S. and Canada) 800-532-4752

Fax (Europe) (+45) 6557 2301

Web site www.proxeon.com

E-mail [email protected]

Address Thermo Fisher ScientificEdisonvej 4DK-5000 Odense C

Phone 800-532-4752

Fax 561-688-8731

E-mail [email protected]

Web site www.thermoscientific.com

Page 16: EASY-nLC II Preinstallation Requirements Guide · 2017-07-21 · designated for the Easy-nLC II system. 2. Your EASY-nLC II system is on site. 3. Personnel experienced in handling
Page 17: EASY-nLC II Preinstallation Requirements Guide · 2017-07-21 · designated for the Easy-nLC II system. 2. Your EASY-nLC II system is on site. 3. Personnel experienced in handling

Thermo Scientific EASY-nLC Preinstallation Requirements Guide 1

1

Introduction

This document provides detailed information on the requirements to successfully install the EASY-nLC II system. To confirm that you have met the site requirements in this document, fill out and forward a signed copy of the Installation Request Form at the beginning of this document.

If you have any questions, contact your local sales representative or our remote support center at [email protected]

The EASY-nLC II system is designed to operate reliably under carefully controlled environmental conditions. As the purchaser, you are responsible for providing a suitable location, a suitable operating environment, a source of power of acceptable quality, correct solvent supplies, and proper waste systems.

Operating an EASY-nLC II system or maintaining it in a condition outside the operating environment specifications described in this guide might cause failures of many types. The repair of such failures is specifically excluded from the standard warranty and service contract coverage.

Page 18: EASY-nLC II Preinstallation Requirements Guide · 2017-07-21 · designated for the Easy-nLC II system. 2. Your EASY-nLC II system is on site. 3. Personnel experienced in handling
Page 19: EASY-nLC II Preinstallation Requirements Guide · 2017-07-21 · designated for the Easy-nLC II system. 2. Your EASY-nLC II system is on site. 3. Personnel experienced in handling

Thermo Scientific EASY-nLC Preinstallation Requirements Guide 3

2

Site Preparation

Before a Thermo Fisher Scientific field service engineer can install your instrument, you must prepare the site. Transport of the equipment to the site requires wide entrances and hallways. Supporting the weight of the EASY-nLC II system, detector, and mass spectrometer requires large and strong workbenches. Each system also has specific power requirements. You must install a telephone within reach of the workbench.

You are responsible for providing an acceptable installation site.

ShippingThe EASY-nLC II system and all auxiliaries ship in a box that is approximately w 60 cm (23.6 in.) × l 55 cm (21.7 in.) × h 65 cm (25.6 in.). The box is placed on a pallet and dimensions of the complete consignment are w 80 cm (31.5 in.) × l 60 cm (23.6 in.) × h 80 cm (31.5 in.). The total weight is 42 kg (92.6 lb). Because the box comes with special protective padding, save the box for possible future use.

Contents

• Shipping

• Placement

• Telephone

CAUTION If the instrument shipping container, Shock Watch, or other indicators show any evidence of damage or mishandling during shipment, do NOT open the container. Call your Thermo Fisher Scientific representative for instructions on what to do. If there is no evidence of shipping damage or mishandling, then you can proceed with the instructions that follow.

Page 20: EASY-nLC II Preinstallation Requirements Guide · 2017-07-21 · designated for the Easy-nLC II system. 2. Your EASY-nLC II system is on site. 3. Personnel experienced in handling

2 Site PreparationPlacement

4 EASY-nLC Preinstallation Requirements Guide Thermo Scientific

PlacementThe EASY-nLC II system alone weighs approximately 32 kg (70.5 lb); its dimensions are approximately w 35 cm (13.8 in.) × l 38 cm (15 in.) × h 45 cm (17.7 in.). There should be at least 15 cm (6 in.) free space at the back of the instrument to ensure proper air circulation.

Place the EASY-nLC II system as close as possible to the detector to minimize dead volume in the transfer lines.

TelephoneInstall a telephone in your laboratory near the instrument so that, if necessary, you can conveniently operate the system while you are working by telephone with Thermo Fisher Scientific Technical Support. Place the voice telephone outlet within 2 m (6 ft) of your LC/MS system.

IMPORTANT Your instrument is designed to work in a controlled electromagnetic environment. Do not use radio frequency transmitters, such as mobile phones, in close proximity to the instrument.

Page 21: EASY-nLC II Preinstallation Requirements Guide · 2017-07-21 · designated for the Easy-nLC II system. 2. Your EASY-nLC II system is on site. 3. Personnel experienced in handling

Thermo Scientific EASY-nLC Preinstallation Requirements Guide 5

3

Operating Environment

Attention to the operating environment will ensure continued high performance of the EASY-nLC II system.

Lab RequirementsEnsure that the physical environment meets these standards for your instrument setup.

Power

115 Vac; +15/–20%; 50/60 Hz; 250 VA230 Vac; +15/–20%; 50/60 Hz; 250 VA

(For UPS dimensioning, assume 300W)

For 115 Vac: one 5.0 AT-fuse (5 × 20 mm, IEC 127)For 230 Vac: one 2.5 AT-fuse

All fuses supplied with the EASY-nLC II system are UL Listed and CSA-certified.

Use the EASY-nLC II system only with appliances and power sources that have proper protective grounding.

Temperature and Humidity

For optimal autosampler plate cooling, maintain the working temperature within 5 to 30 °C.

The humidity should be between 20 to 80% RH and be non-condensing.

Do not plan the installation of the instrument close to a window or ventilation duct or other device that can cause significant temperature change. These temperature changes will affect the performance of the instrument.

Contents

• Lab Requirements

• IT Requirements

Page 22: EASY-nLC II Preinstallation Requirements Guide · 2017-07-21 · designated for the Easy-nLC II system. 2. Your EASY-nLC II system is on site. 3. Personnel experienced in handling

3 Operating EnvironmentIT Requirements

6 EASY-nLC Preinstallation Requirements Guide Thermo Scientific

Solvents

Make sure that you have degassed and uncontaminated LC/MS-grade solvents available: water/formic acid and acetonitrile/formic acid. Do not filter solvents before use. Filtering solvents can introduce contamination.

For information about LC/MS-grade solvents supplied by Thermo Fisher Scientific, go to: www.FisherLCMS.com.

Connections

The EASY-nLC II system ships with a test pre-column and a test analytical column. They connect to the front of the instrument with 360 μm (OD) fittings. For any other diameter, consult with [email protected] for the best alternative solution.

A transfer line between the analytical column and the detector/spotter must be available, for example: 20 μm (ID), 360 μm (OD), fused silica.

If the detector is a mass spectrometer, both a tuned nano-ESI source and online emitters must be available.

Detector

Make sure that the primary detector that you will use with the EASY-nLC II system is tuned and capable of stable spray at nanoflow.

Trainees

As part of the installation, the Thermo Fisher Scientific field service engineer will perform familiarization training, demonstrate the use of the instrument and software, and show basic maintenance procedures. You are responsible for confirming that all trainees are present prior to the start of the training session.

IT RequirementsEnsure that your network and IT setup meet the following standards.

Network

For data access and online support/monitoring, the EASY-nLC II system must be networked through the RJ45 10/100 Mbit Ethernet connection.

The instrument must be set up to use dynamic IP addresses through a local DHCP server or given a fixed IP address (probably by an IT system administrator).

Page 23: EASY-nLC II Preinstallation Requirements Guide · 2017-07-21 · designated for the Easy-nLC II system. 2. Your EASY-nLC II system is on site. 3. Personnel experienced in handling

3 Operating EnvironmentIT Requirements

Thermo Scientific EASY-nLC Preinstallation Requirements Guide 7

Contact Closure

The EASY-nLC II system synchronizes with the detector through a contact closure cable.

When connected to analytical equipment, such as a mass spectrometer, ensure that the protective grounding is shared between the instruments.

The synchronization can be either one way (the EASY-nLC II system sends a START signal to the MS) or two-way (in addition to sending a START signal to the MS, the EASY-nLC II system also monitors a READY/BUSY signal from the MS to avoid wasting sample material if the MS becomes unavailable).

Detector Software

The MS software must interface to the EASY-nLC II system using contact closure. Make sure that an experienced user of MS software correctly configures the system.

Page 24: EASY-nLC II Preinstallation Requirements Guide · 2017-07-21 · designated for the Easy-nLC II system. 2. Your EASY-nLC II system is on site. 3. Personnel experienced in handling
Page 25: EASY-nLC II Preinstallation Requirements Guide · 2017-07-21 · designated for the Easy-nLC II system. 2. Your EASY-nLC II system is on site. 3. Personnel experienced in handling

Thermo Scientific EASY-nLC Preinstallation Requirements Guide 9

4

Installation

Before installation, make sure that all preparations described in the previous chapters are complete.

When you have completed your laboratory site preparation, the EASY-nLC II Installation Request Form has been mailed or faxed to your local office for Thermo Scientific products, and the system has been delivered, call your Thermo Fisher Scientific office to arrange for an installation date. Refer to the Installation Request Form at the front of this guide. Telephone and fax numbers for Thermo Fisher Scientific Technical Support and Customer Service are listed in the preface of this guide.

DemonstrationWhen your new EASY-nLC II system is on site and ready for installation, a Thermo Fisher Scientific field service engineer will install it. During the installation, the field service engineer demonstrates the basics of equipment operation and routine maintenance.

Do not plan to use your new system for sample analysis until the installation is complete and you have signed the acceptance form.

Preventive MaintenanceRoutine and preventive maintenance of the EASY-nLC II system is your responsibility.

Regular preventive maintenance is essential. It increases the life of the system, maximizes the uptime of your system, and provides you with optimum system performance. For more information on maintenance procedures, refer to the EASY-nLC II User Guide.

Page 26: EASY-nLC II Preinstallation Requirements Guide · 2017-07-21 · designated for the Easy-nLC II system. 2. Your EASY-nLC II system is on site. 3. Personnel experienced in handling
Page 27: EASY-nLC II Preinstallation Requirements Guide · 2017-07-21 · designated for the Easy-nLC II system. 2. Your EASY-nLC II system is on site. 3. Personnel experienced in handling

Thermo Scientific EASY-nLC Preinstallation Requirements Guide 11

5

Instrument Arrival

Electronic equipment carriers specializing in the handling of delicate machinery ship the instrument-type system to your site. Occasionally, however, equipment is damaged in transit.

Take the following precautions when receiving material:

• Check carefully for obvious damage or evidence of rough handling.

• Note any apparent external damage on all copies of the receiving documents and describe briefly the extent of the damage. Have the driver sign (or initial) next to your comments to signify agreement with your observations.

• To report the damage, contact your local service office, as listed in “Service Offices for Thermo Scientific SID Products” on page v.

U.S. and Canadian ShipmentsFor shipments to the United States and Canada, instruments are shipped by one of two methods:

• Local Distribution Center

• Free On Board (FOB) San Jose, CA, U.S., or FOB destination

If the system is damaged in transit, the method of shipment determines who has responsibility for filing a claim against the carrier. If the instrument shipping container, Shock Watch, or other indicator shows any evidence of damage or mishandling during shipment, do NOT open the container. Call your Thermo Fisher Scientific representative for further instructions.

Most systems are shipped FOB San Jose, CA, and any damage incurred in shipment is the responsibility of the purchaser and the carrier. However, Thermo Fisher Scientific will assist with claims filing and (billable) repairs if necessary.

If the system is shipped FOB destination and is damaged, Thermo Fisher Scientific files a claim against the carrier.

Note Freight insurance requires that obvious damage be noted on the receiving documents.

Page 28: EASY-nLC II Preinstallation Requirements Guide · 2017-07-21 · designated for the Easy-nLC II system. 2. Your EASY-nLC II system is on site. 3. Personnel experienced in handling

5 Instrument ArrivalInternational Shipments

12 EASY-nLC Preinstallation Requirements Guide Thermo Scientific

When your system arrives, move it to a protected location indoors. If you have questions about moving your system, contact your local office for Thermo Fisher Scientific products. Telephone and fax numbers for service offices are listed in the preface of this guide.

International ShipmentsInternational shipments—from Denmark directly to the customer—are usually shipped Carriage and Insurance Paid (CIP) to destination unless specified differently. If the system is shipped CIP destination and if any damages are incurred in shipment, Thermo Fisher Scientific files a claim against the carrier.

Note For U.S. and Canadian shipments, Thermo Fisher Scientific does not accept liability for damage if materials are received with obvious damage AND the damage is not recorded on the receiving documents.

Note For international shipments, Thermo Fisher Scientific does not accept liability for damage if materials are received with obvious damage AND the damage is not recorded on the receiving documents.

Page 29: EASY-nLC II Preinstallation Requirements Guide · 2017-07-21 · designated for the Easy-nLC II system. 2. Your EASY-nLC II system is on site. 3. Personnel experienced in handling

Thermo Scientific EASY-nLC Preinstallation Requirements Guide 13

I

CCIP, international shipments 12claims, equipment damage 11column connections 6compliance

FCC viiregulatory viiWEEE ix

contact informationCustomer Service (U.S., Canada) xvsales and service vTechnical Support xv

Ddamage during shipping 11damaged equipment, claims 11detector, primary 6

Eelectromagnetic compatibility viiEMC compliance viiEthernet connection 6

FFCC compliance viifreight insurance 11

Iinstallation request form iii, 9insurance, freight 11IT requirements

contact closure 7detector software 7network 6

Llab requirements 5

Mmaintenance 9

Ooperating environment

IT requirements 6lab requirements 5

Ppower requirements 5

Rregulatory compliance vii

Ssafety and special notices xivsafety standards viishipments

U.S. and Canadian 11shipping damage 3, 11site preparation 3solvents 6space requirements 3

Ttelephone 4temperature requirements 5training and trainees 6transfer line 6

WWEEE compliance ix

Index

Page 30: EASY-nLC II Preinstallation Requirements Guide · 2017-07-21 · designated for the Easy-nLC II system. 2. Your EASY-nLC II system is on site. 3. Personnel experienced in handling