  • Situational Awareness Technology Trends for Renewable Portfolio using SCADA GMS

    Sept 23, 2013

    Michael Liska – InvenergyWilliam Schwant – Structure

    Mario Marchelli – Structure

    EMMOS User Conference

    Invenergy Presentation

  • Agenda

    Introduction to Invenergy

    Challenges for Portfolio of Renewables

    Functionality Criteria and Situation Motivations

    Implementation of Situational Awareness Solution

    Realized Benefits and Forward Impacts

  • Who is Invenergy Developed 7,100 MWs of utility-scale renewable and natural gas-

    fueled power generation facilities in the US, Canada and Europe

    Operates 3,150 MWs of Wind Renewables in North America

    28 Wind Sites representing ~2,000 Turbines

  • Where is Invenergy

    • Sites Located in

    15 States, 2

    Canadian

    Provinces and

    Europe

    • Headquartered

    in Chicago Ill

    • Participates in ERCOT, PJM, BPA, MISO, WECC, NYISO,

    IESO, and Hydro Quebec

  • Who Invenergy is …Tomorrow

    Exploring international development

    opportunities in Japan, Mexico, UK and

    more

    Increasing integration of solar and natural

    gas assets into the generation portfolio

    Rapid growth of the wind fleet

  • Distinctive Considerations

    Key Considerations & Constraints

    Monitoring and Control Responsibilities

    Site Control

    Turbine Control

    Operation includes ability to remotely Open Breakers as well

    as Reset Turbines

    Connection standards with each Market Operator (ERCOT,

    PJM, WECC, MISO, NYISO, IESO, Hydro Quebec)

    Operations Centralized for diverse geographic

    regions

  • Change Drivers

    The motivation for the change was to bring all Monitor and Control functions in-house at Invenergy

    Standardization of Operation

    Discontinuing 3rd party services

    Retiring all equipment which vendors no longer support

    Transitioning original portfolio

    Portfolio expansion

    Uniform supportability

    System environments arrangement (Dev / Test, DR, Prod) Functionality Migrations, Site Additions and Redundancy)

  • Issues to Overcome

    Piece by Piece - Not a conglomerate, started small and grew

    site by site

    Unique Boutique -Too many dissimilar systems making it

    difficult to centralize

    Expiration Date- Legacy Custom Systems with expired

    Support

    Looking Forward - Desired Standardization, Continuity,

    Similarity…

  • Situational Awareness for Renewable

    Portfolios Technology Trends

    Power Forecast Accuracy

    Communication, &

    Assimilation

    Evaluated Control

    Options: GMS Vendors RTU Communication Individual OEM Controllers Develop In House Solutions

  • Situational Awareness Solution -

    Implementation

    Scalable: Summary, Dashboard, Site, Turbine

    Smoothing Differences (ERCOT vs. PJM Dashboards)

    Similarities / Efficiencies

    The site specific OEM Wind farm Controllers persist, relegated to

    redundant backups

  • Situational Awareness Solution -

    Representing Scale

  • Situational Awareness Solution -

    Turbine Control (Standard and Advanced)

  • Situational Awareness Solution -

    Assimilating Differences

  • Situational Awareness Solution -

    Centralized Alarming

  • Situational Awareness Solution

    Similarities / EfficienciesSingle Source Navigation for:

    GMS Overview Screen

    Substation Displays

    Power Control Display

    Turbine Control Display

    Operation Dashboards

    Market Information Display

    GMS Health Monitor

    Alarm Management

    Logging

  • Staying Healthy & Growing

    Daily Operation

    Supportability

    Incorporating New Sites (Planned for development 7 Sites and 690 MWs over next twenty-four months)

    Assimilation of other unit types

  • Questions / Discussion

  • Presenter Contact Info

    Michael Liska - Invenergy LLC

    [email protected] 312-582-1566

    William Schwant –The Structure Group

    [email protected] 512-921-5063

    Mario Marchelli –The Structure Group

    [email protected] 832-563-0897

    mailto:[email protected]:[email protected]:[email protected]