Arc 307 project in conjunction with Building Systems II Project: To analyze the occupancy service requirements of the design project of a Hotel with a public function at grade level, and propose access and egress ideas as the design is in a process stage. Programs: Rhino 4, Vray for Rhino, AutoCad, Adobe IllustratorTRANSCRIPT
2012 FALL - ARC 322 - BUILDING SYSTEMS IIFORM SYSTEMS PARALLAX - SCHEMATIC DESIGN. WK08ARC 307-07 MCDONALD STUDIO - HOTEL IN SARATOGA SPRINGSALLIE SUTHERLAND, #238
HVAC IDEA: PLACE COOLING TOWERS NEXT TO THE ELEVATOR CORE AT THE CENTER OF THE BUILDING SO AS NOT TO OBSTRUCT EXTERNAL CIRCULATION
EGRESS IDEA: PLACE TWO FIRE STAIRS AT THE BACK OF THE SITE AND ONE ON THE NORTH EAST SIDE WHERE THERE ARE SEPARATIONS BETWEEN THE SITE AND OTHER BUILDINGS ON THE BLOCK
SPA TREATMENT ROOMSAREA: 9,558 SQ FTLF: 100 GROSSOL: 95.58 GROSS
SPA LOUNGEAREA: 1,500 SQ FTLF: 15 NETOL: 100 GROSS
STORAGE ROOMAREA: 576 SQ FTLF: 300 GROSSOL: 1.92 GROSS
B
A3
A3
S
SPAAREA: 1,926 SQ FTLF: 15 NETOL: 128.4 GROSS
HOTELRESTAURANTAREA: 1320 SQ FTLF: 7 NETOL: 188.5 GROSS
HOTEL LOBBYAND SHOPAREA: 2904 SQ FTLF: 60 NETOL: 48.4 GROSS
A2
MR2
B
LOUNGEAREA: 576 SQ FTLF: 15 NETOL: 38.4 GROSS
R2
HOTEL ROOMSAREA: 11,410 SQ FTLF: 200 GROSSOL: 57.05 GROSS
FIRST FLOOR
SECOND FLOOR
THIRD FLOOR
FOURTH FLOOR
d=108 FT
D= 202 FT
66 FT
72 FT
GYMAREA: 2240 SQ FTLF: 50 GROSSOL: 44.8 GROSS
JUICE BARAREA: 2000 SQ FTLF: 7 NETOL: 285.7 GROSS
STORAGE AREAAREA: 4,224 SQ FTLF: 300 GROSSOL: 14.08 GROSS
A2
A3
S
A3
YOGA STUDIOAREA: 2,200 SQ FTLF: 50 GROSSOL: 44 GROSS
PLANS: 1” = 32’
HOTEL ROOMSAREA: 11,410 SQ FTLF: 200 GROSSOL: 57.05 GROSS
FIFTH FLOOR
LIFE SAFETY: d> D/2 = MEETS EGRESS
LONGITUDINAL SECTION LOOKING NORTHEAST
THIS IS 51,844 SQ FT HOTEL IS DESIGNED AS A MIXED USED BUILDING COMPRISED OF A SPA AT THE BASEMENT LEVEL, THREE STORIES OF PUBLIC MIXED USE SPACE, AND TWO STORIES OF HOTEL ROOMS (R2).
RENDERING SHOWING THE COURTYARD CONDITION CREATED BY A VOID IN THE TWO UPPER LEVELS (R2).
RENDERING SHOWING THE APERTURESON THE FACADE, WHICH DISPLAYS THE VARIETY OF MIXED OCCUPANCIES.
ACCESS IDEA: LOCATE 3 REQUIRED FIRE STAIRS WITHIN HALLWAY AND SOCIAL SPACES IN THE SAME PLACE ON EVERY LEVEL, AND LOCATE ELEVATOR CORE AND VARIOUS CONVENIENCE STAIRS IN THE CENTER.
DETAILED PLAN OF A HOTEL ROOM
OCCUPANCY LOAD PER FOORBASEMENT LEVEL: 325.9FIRST FLOOR: 236.9SECOND FLOOR: 344.58THIRD FLOOR: 44FOURTH FLOOR: 95.45FIFTH FLOOR: 57.05
TOTAL OCCUPANCY: 1,103.88 GROSS
BASEMENT