insite for well intervention coiled tubing job design and data … · insite® for well...
TRANSCRIPT
WELL INTERVENTION
Coiled Tubing
Introduction
Halliburton has recently expanded its software suite to carry out Coiled Tubing design and real-time data acquisition calculations. InSite® for Well Intervention software system has been designed, using Halliburton’s own Coiled Tubing experience and testing to produce a tool superior to any available commercially for this application.
Since this new software is built upon the InSite platform used throughout the different Halliburton product lines, Halliburton can make full use of the InSite Anywhere® system for remote viewing of the real-time data gathered during higher profile operations. This data can then be viewed from any Internet-connected device, including some smart phones to enable key personnel to watch and make decisions in real-time without actually being on location.
Coiled Tubing Job Design using InSite® for Well Intervention
With wells becoming deeper, more highly deviated, and overall more complex, the need for accurate Coiled Tubing design and analysis is becoming more critical. Hydraulics and mechanical forces can now be analyzed in greater detail prior to any operation to help ensure the likelihood of a successful job.
Forces and StressesThe InSite® for Well Intervention Design Forces Module is used to model Coiled Tubing deployment, with or without tools, into and ut of a well, using an accurate representation of the wellbore.
InSite® for Well Intervention Coiled Tubing Job Design and Data AcquisitionEnables Coiled Tubing job design, data acquisition, and remote viewing of real-time data
HA
L395
50
The program analyzes the cumulative forces acting at a particular stage of the job and determines whether the target depth can be reached, specified tasks performed, and equipment retrieved to surface. This module can be used to simulate any Coiled Tubing operation such as:
• Logging(open-holeandcased-hole)
• Perforating
• Fishing
• Drilling
• Extended-reachapplications
• High-pressureapplications
WELL INTERVENTION
Multiple Case ComparisonsAnadvancedfeatureoftheInSite®forWellInterventiondesignanalysisistheabilitytocompareseveraldifferentcaseseasilyduringasingledesign.Forinstance,tofindoutwhichCoiledTubingstringismostsuitableforaparticularapplication,thetypesoftubingcanbecomparedontheoneoutputgraph,enablingdecisionstobemadequicklyandeasily.Thesecomparisonscanbemadebasedonanyinputparameter.Thefollowingscreenshotsshowanexampleofdifferentstringcomparisonsforasinglewell.
HA
L395
45H
AL3
9547
HA
L395
49H
AL3
9546
ThefollowingscreenshotsshowexampleoutputsthatcanbeobtainedveryquicklytoenableanalysisoftheforcespresentduringaCoiledTubingoperation.
Coiled Tubing and Well HydraulicsInSite®forWellInterventionhasthecapabilityofaccuratelymodelingfluidhydraulicsintheCoiledTubingandwellbore.Fluidflowisinfluencedbyseveralconditions(includingstringandwellboregeometry,fluidproperties,pumprate,measureddepth,chokepressure,andreservoirproperties),andslightchangesmayhaveminimalordramaticimpactsonthepotentialsuccessofajob.
ThehydraulicssimulationsinInSite®forWellInterventionusetheHalliburtonMaterialLibrarydatabaseandcalculations,whicharebasedonempiricaldatagatheredfromHalliburton’sgreatwealthofdrillingfluids,cementing,stimulation,andfracturingexperience.Extensivetesting,usingfluidsandproppantsinCoiledTubing,havealsobeendonetocomplementthisexperience.
Advancedenergy-balancingcalculationsinthemodelincludesfrictionalheatingduetofluidflow,heattransferbetweenformationandwellbore,heattransferbetweenannulusandtubing,andheattransferwithinthetubingandannulusalongthedirectionofflow.Fluidsaretrackedastheymovethroughthesystemwithpressuresandtemperaturebeingcalculatedanddisplayedthroughoutthewellbore.
WELL INTERVENTION
Stage Table DesignAnotheradvancedfeatureoftheInSite®forWellInterventiondesignsoftwareistheabilitytoaddthedimensionoftime.Thisfeatureenableshydraulicsandmechanicsforacompletejobtobecalculatedsimultaneouslywithanyparameterchartedagainsttime.Usingthefeature,youcanseemaximumCoiledTubingstresses(onsurfaceanddownhole)duringtheentireoperation.Thiscanbedonemoreaccuratelyasthehydraulicschangethroughoutthejobasdefinedbytheuserinputs.Pressurescanbepredictedatanylocation(suchasthechokeorwellreservoir)throughoutthejobandinputdataadjustedtooptimizethejobperformance.Volumesandtimesfordifferentoperationsarecalculatedautomaticallytoaidjobplanning.
TheoutputparameterscanalsobeexpressedinaDepthBasedplottoobservethedownholeparametersduringtheproposedoperationasshownbelow.
HA
L395
54H
AL3
9551
HA
L395
48
TheInSite®forWellInterventionhydraulicsdesignmodulecombineshydrauliccalculationswithapowerfulgraphicalinterfacetoenabletheusertopredictflowratesandpressuresatanystageofaCoiledTubingjob.Aswiththeforcesmodel,comparisonscanbemade,usingdifferentparameters(e.g.,differentpumpratesorCoiledTubingstrings)inasinglejobtoenablequickandcleardecisionstobemade.
Thefollowingscreenshotshowsanexampleofsomeofthehydraulicsoutputthatcanbeobtainedquicklywithasinglemouseclick.
Thefollowingscreenshotshowsanexampleofsomeoftheoutputsthatcanbeobtainedforastagetabledesign.
WELL INTERVENTION
Thefollowinggraphicshowstheoutputfromthereal-timeInSite®forWellInterventionFatigueViewer.Notethatthefatigueaccumulatedduringthecurrentoperationisclearlyvisible(inred)againstthepreviousfatigue.
Thepreviousgraphicshowsthepercentageofusedlife.Theupperdisplaygivesagraphicalinterpretationofthestringitself,wherethetaperoccursnotedasachangeinIDandwhereweldsoccur,indicatedbydifferentcoloredlinestorepresentthedifferenttypesofwelds.
ExtensivetestingandfieldevaluationshaveproventheconsistencyandreliabilityofHalliburton’sfatiguelifemodel.Halliburtontakesaconservativeapproachtotubinglifeandretireourstringsbeforeovalitybecomesaconcern.Wherebyothersintheindustryutilizetubingovalityasamajorfactorintheirstringretirementcriteria,Halliburton’sfatiguelifemodeltakesintoaccountseveralmorefactors.Theseincludejobexposuretype(acid,H2S,CO2,etc.),internalandexternalpressures,andthenumberofcycles.
FormoreinformationonhowHalliburtoncalculatesfatigue,refertothefollowingpapers:
• OTC7325-CoiledTubingLifePrediction(1993)
• SPE38407-LargeCoiledTubingFatigueLife(1997)H
AL3
9555
Real-Time Data Acquisition and Calculations
OneofthemostimportantfeaturesofanyCoiledTubingdataacquisitionsoftwareistheabilitytotrackfatigueandmonitorstressesintheCoiledTubingduringanactualjob.Thisfeatureisimportanttohelpensurethatnofailuresoccurduringanoperation.
Fatigue Prediction and Monitoring HalliburtonhasdevelopedacomprehensiveStringManagementSystem.Thissystemincorporatessoftwareandreal-timeDataAcquisitionforfatiguemonitoringandLifePrediction.Inaddition,theStringManagementSystemincludesprocessesforkeepingtrackoftheremaininglifeofeachstring,inspectionandspoolingprocesses,andproceduresforstoringCoiledTubingstrings.
Halliburton’sInSite®forWellInterventionsoftwarepackageusesourproprietaryfatiguemodeldevelopedfromextensiveempiricaldatacompiledbyVladimirAvakov.TheDesignModuleofInSite®forWellInterventioncanbeusedasamodelingtooltopredictfatigueforCoiledTubingstringdesign.ThesimulatorfeaturesanAnalyzertocomparemultiplecasesandoptimizethematerial,diameter,andwallthickness(es)ofthestring.Tocalculatethefatigue,thejobisrunintheStageTable,andthenpre-andpost-jobfatiguecanbecompared.TheprogramcanacceptvariousinputsintheStageTablewithoutpermanentlyalteringcriticalfatiguedata.Whenusedinreal-time,fatigueaccumulationiscalculatedasthejobprogresses.
FeaturesoftheFatigueCalculator/Simulatorinclude:• Calculateswhichsegmentsalongthestringundergobendingevents.
• CalculatesthechangestothebendingradiusatthereelastheCoiledTubingisrunintoandoutofthewell.
• Displaystheusedlifealongthestringasitaccumulates.
• CreatesapermanentandongoingrecordoffatiguedamagetoaCTstring.
UsingtheInSite®forWellInterventionfatigue-analysissoftware,theremaininglifeofthestringandweldscanbepredicted.Prejobsimulationsoftheplannedworkincludingcontingenciescanbesimulatedandlife-usedpeakspredicted.
WELL INTERVENTION
Thefollowingchartsshowsomeofthedownholecalculationpossibilitiesandalsodemonstratesthereal-timefluid-trackingability(representedbydifferentcolors)inthewellbore.
FormoreinformationonhowHalliburtoncalculatestubinglimitsandstresses,refertothefollowingpapers:
• SPE36340-ComputingCollapsePressureforCoiledTubing(1995)
• SPE46004-CollapseDataAnalysisandCoiledTubingLimits(1998)
HA
L395
53H
AL3
9556
Downhole CalculationsAswellascalculatingsurfacestressesintheCoiledTubing,InSite®forWellInterventionalsocancalculatedownholestressesalongwithvariousotherparameters,whichcanbegraphedinreal-timeasthejobprogresses.Thesecalculationsaremadebyusingknownvaluesofpressureanddepthcombinedwithgivenvariablessuchasfluidweightsandvolumestoprovidetheoperatorwithagreaterknowledgeofwellactivity.Thisenhancedknowledgecanhelptheoperatormakejobchanges.
HA
L395
52
Real-Time Calculations
ThroughoutanyCoiledTubingoperation,stressescanbecalculatedandmonitoredatmultiplepositionstohelpensuredifferenttypes,andlocationsoffailurecanbepredictedand,therefore,possiblyavoided.
Surface StressesUsingmeasuredvaluesofpressuresandloadsonthesurface,stressesarecalculatedatfourkeylocationsoftheCoiledTubingsurfacesetup.Thesevaluesareshowninreal-timeonacharttogivetheoperatoravisualwarningofwhenhighstressesarebeingencountered.ThefollowinggraphicshowsanexampleofthegraphicalmeansoftrackingsurfacestressesintheCoiledTubingduringanoperation.
WELL INTERVENTION
Operator DisplayTosimplifyallavailabledatafortheCoiledTubingoperator,Halliburtonhasdevelopedaverypowerfuloperatordisplaythatsummarizesallimportantdataontooneeasy-to-readgraphicalinterface,asshowninthefollowingscreenshot.Thisdisplayiscompletelycustomizable.
Themainfeaturesthathavebeendevelopedfortheoperatordisplayincludethefollowing:• Fullydynamiclimitsbandsontheedgesofthegauges.
Notetheredandgreenbandsonthegauges,whichprovidesnotificationtotheoperatortokeeptheparameterswithinthegreenareastohelpensurenoriskoffailures.
• Anadvancedwarningscreen.Warningsappearforthefollowingscenarios:
• IfstressesontheCoiledTubingstring(onsurfaceordownhole)areapproachinglimits
• Whenweldsorhighfatigueareasareapproachingthelevelwindorinjector
• AstheBHAapproachesthesurfaceoranychangesindownholewellboregeometry
• Fluidtotalizersarecustomizabletohandlemultiplefluids.
Advanced Design Calculations
HalliburtoniscurrentlydevelopingInSite®forWellInterventiontohavetheabilityofcarryingoutjobdesigncalculationsforcommonjobtypessuchassandcleanoutandnitrogenlifting.
ThisnewfeaturewillalsoincorporateHalliburton’sproprietaryCoilSweep™andHydra-Blast™specialisttools.ThefollowingexampleshowsasafeoperationalenvelopethathasbeencalculatedtoassisttheengineerandoperatorwhileperformingasandcleanoutwithCoiledTubing.
Friction Matching
Tooptimizefutureoperations,wecanlearnalotfrompreviousoperations.Whenajobisdesigned,certainparametersmustbeestimated.Onesignificantparameter,particularlyindeviatedwellbores,isthefrictioncoefficientbetweentheCoiledTubingandthewallofthewellbore.ThisvaluehasthemostinfluenceonhowfarwecanpushCoiledTubingalonganextendedreachwell.Factorssuchasconditionofthewellboretubulars,typeofwellboresection(openhole,slottedliners,etc.),fluidtypeinthewell,etc.affectthisnumberandcanmakesignificantdifferencestoajobdesign.
Whenworkingonaseriesofsimilarwells,wecanlookbackatpreviousoperationstoverifythevalidityofalltheassumptionsmadeonpastoperationsbyfinetuningthedesignuntiltheycloselymatchtheactualpostjobfielddata.Thesecalculatedvaluesoffrictioncanthenbeappliedtoanysubsequentoperationshelpingensurethatourjobdesignshavethebestchanceofsuccessandthemostsuitableequipmenttocarrythemoutisonlocationfromthestart.
HA
L395
58
HA
L395
57
WELL INTERVENTION
www.halliburton.com
© 2015 Halliburton. All rights reserved. Sales of Halliburton products and services will be in accord solely with the terms and conditions contained in the contract between Halliburton and the customer that is applicable to the sale. H010828 01/15
Thefollowinggraphisanexampleofpostjobfrictionmatching;thesoftwarealsohasthecapabilityofcalculatingfrictionmatchinginreal-timewhiletheoperationisbeingcarriedout.
AllofthecriticalCoiledTubingoperationalinformationisondisplayatthesametime,whichcanbeconfiguredandsetusingkeyboard,mouse,oratouchscreeninterface.
Thesafetyfeaturesincludedwiththiscontrolsystemareasfollows:• BasicControls
• Stopsinjector,basedontag,overpull,weightorspeedlimits
• AdvancedControls• Improvedlimitsystem
• “Soft”stoprampsdowninjectorspeedathigherspeeds,avoidingequipmentdamage
• Automaticchainlubesystem
• Tubingslipdetection
• Chainlife(stretch)indicationsystem
ACE™ Equipment on FLECS™ Control System
TheACE™(AutomaticControlledEquipment)operatingsysteminstalledontheFLECS™(FlexibleElectronicControlSystem)hardwaregivestheoperatoracontrolsystemwithbuilt-insafetyfeaturesandEthernetconnectivity.TheACEoperatingsystemisthesameplatformusedtocontrolotherHalliburtonequipmentsuchaspumpsandblenders,givinguniformfunctionalityonlocation.
HA
L395
59
HA
L395
60H
AL3
9561
For more information, contact your Halliburton representative or email us at [email protected].