Project Type Location Steel Tonnage Works Carried Out robinsons.com Robinson are pleased to have been associated with the supply and installation of the steelwork and precast package for the new Interdisciplinary STEM Teaching and Engagement Centre (ISTEC) which contains state-of-the-art laboratories for teaching undergraduates and postgraduate students. It will also support the University’s schools, colleges and community outreach activities, while providing important facilities for industry and a platform for wider collaboration. The site programme was completed ahead of schedule and handed over in a phased manner to suit the following trades. Robinson were invited to the “Topping-out Ceremony” by the University project team on Monday 14th November 2016. The “Topping-out Ceremony” is believed to go back a thousand years to the Scandinavian people, who traditionally raised a flag, a fir tree or both when the timber frame (or in this case steel) of a building reached its maximum height, the custom of the fir tree symbolizing bringing life to the building. Teaching Centre Nottingham 180 tonnes Structural steelwork, Pre-cast planks, stairs and metal decking Robinson supplied and erected 180 tonnes of structural steelwork including the precast planks, stairs and metal decking. Andrew Hopewell MCIOB MA – Lead Construction Manager, Nottingham Trent University “The work undertaken by the Robinson Structures team on our new Interdisciplinary Science and Technology Centre (ISTeC), was a key part of the successful project delivery, and an excellent example of positive, pro-active collaboration in construction.” Nottingham Trent University STEM Teaching Centre Main Contractor T 01332 574711 E [email protected]

Upload: others

Post on 13-Jul-2020

3 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Main Contractor Nottingham Trent University STEM …...Andrew Hopewell MCIOB MA – Lead Construction Manager, Nottingham Trent University “The work undertaken by the Robinson Structures

Project Type

Location

Steel Tonnage

Works Carried Out

robinsons.com

Robinson are pleased to have been associated with the supply and installation of

the steelwork and precast package for the new Interdisciplinary STEM Teaching and

Engagement Centre (ISTEC) which contains state-of-the-art laboratories for teaching

undergraduates and postgraduate students. It will also support the University’s schools,

colleges and community outreach activities, while providing important facilities for

industry and a platform for wider collaboration.

The site programme was completed ahead of schedule and handed over in a phased

manner to suit the following trades.

Robinson were invited to the “Topping-out Ceremony” by the University project team

on Monday 14th November 2016. The “Topping-out Ceremony” is believed to go back

a thousand years to the Scandinavian people, who traditionally raised a flag, a fir tree

or both when the timber frame (or in this case steel) of a building reached its maximum

height, the custom of the fir tree symbolizing bringing life to the building.

Teaching Centre

Nottingham

180 tonnes

Structural steelwork, Pre-cast planks, stairs and metal decking

Robinson supplied and erected 180 tonnes of structural steelwork including the precast planks, stairs and metal decking.

Andrew Hopewell MCIOB MA – Lead Construction Manager, Nottingham Trent University

“The work undertaken by the Robinson Structures team on our new Interdisciplinary Science and Technology Centre (ISTeC), was a key part of the successful project delivery, and an excellent example of positive, pro-active collaboration in construction.”

Nottingham Trent University STEM Teaching Centre

Main Contractor