DUNFERMLINE SLUDGE TREATMENT BELT PRESS
Ross-Shire Engineering were engaged by Scottish Water Managed Delivery late in 2016 to design, construct, and install a belt press in the Dunfermline Sludge Treatment Centre, complete with sludge handling and removal systems.
The sludge removal system, included integral weighing systems for two sludge skips, modifi cations to the sludge process building, odour control modifi cations and
refurbishment of the fi nal effl uent and potable water systems.
In addition to the process elements, Ross-shire Engineering were also requested to design and install a new road access and associated footways for the removal of sludge skips.
Following completion of the project, the successful performance of the sludge press resulted in SW increasing the
volume of sludge to be processed at the
site. This change required additional works
for a third weighbridge and sludge removal
stream, with works completed in May 2018.
Case Study
To reduce operating cost and site odour emissions, SW engaged RSE to design and construct a new sludge press at Dunfermline WwTW. The installation has been successfully delivered, allowing SW to process sludge at the facility without reliance on third party providers.
Odour control and sludge press building
Sludge Press installed in the Sludge Building
Sludge skip delivery, prior to the installation of the 3rd weighbridge
Project Title: Dunfermline STC Belt Press
Client: Scottish Water
Project Value: £1.6M
Award Date: December 2016
Project Completed: May 2018
Sludge discharge pipework to sludge skips