Progress Since 2012 Name Suburb Region/District Project Type Project Description Current Status 2nd Bulk Liquids Berth Port Botany Eastern City District Freight Planning approval to develop a second Bulk Liquids Berth (BLB2) at Port Botany was received in 2008. On 31 May 2011, John Holland Pty Ltd was engaged to construct the BLB2. The berth became operational in December 2013. The main products handled at the BLB are refined fuels, gases and chemicals / other bulk liquids. BLB2 comprise a steel piled pier adjacent to the existing BLB1; associated infrastructure such as marine loading arms, fire fighting equipment, onshore support facilities and pipelines from existing user sites to the new berth. The open access, multi user berth operates on a 24 hour/ 7 day per week basis. BLB2 has been designed to accommodate 120,000 dead weight tonne vessels to a maximum of 270m length overall. Completed Abbotsford Wharf - Wharf Upgrade program Abbotsford Eastern City District Maritime The upgrade aims to provide easier access to the wharf, better weather protection, additional seating, improved safety, quicker and more efficient boarding and disembarking, increased capacity and more efficient interchange with other modes of transport. Planning Acacia Avenue cycleway Lake Munmorah Central Coast Walking and Cycling Shared Path cycleway alongside Acacia Avenue Completed

Author: others

Post on 11-Jun-2020

1 views

Category:

Documents


0 download

Embed Size (px)

TRANSCRIPT

  • Progress Since 2012 Name Suburb Region/District Project Type Project Description Current

    Status

    2nd Bulk Liquids Berth Port Botany Eastern City

    District

    Freight Planning approval to develop a second Bulk Liquids

    Berth (BLB2) at Port Botany was received in 2008. On

    31 May 2011, John Holland Pty Ltd was engaged to

    construct the BLB2. The berth became operational in

    December 2013. The main products handled at the BLB

    are refined fuels, gases and chemicals / other bulk

    liquids. BLB2 comprise a steel piled pier adjacent to the

    existing BLB1; associated infrastructure such as marine

    loading arms, fire fighting equipment, onshore support

    facilities and pipelines from existing user sites to the new

    berth. The open access, multi user berth operates on a 24

    hour/ 7 day per week basis. BLB2 has been designed to

    accommodate 120,000 dead weight tonne vessels to a

    maximum of 270m length overall.

    Completed

    Abbotsford Wharf -

    Wharf Upgrade

    program

    Abbotsford Eastern City

    District

    Maritime The upgrade aims to provide easier access to the wharf,

    better weather protection, additional seating, improved

    safety, quicker and more efficient boarding and

    disembarking, increased capacity and more efficient

    interchange with other modes of transport.

    Planning

    Acacia Avenue

    cycleway

    Lake Munmorah Central Coast Walking and Cycling Shared Path cycleway alongside Acacia Avenue Completed

  • Name Suburb Region/District Project Type Project Description Current

    Status

    Additional Boating

    Access Points at

    Middle Harbour

    (Investigation),

    Willoughby

    Castle Cove North Maritime Planning

    Additional Boating

    Access Points on the

    Nepean River

    (Investigation)

    Penrith West Maritime Investigation and concept designs for eight passive craft access points to the Neapean River.

    Planning

    Airds Road cycleway Leumeah Western City

    District

    Walking and Cycling Shared Path cycleway alongside Airds Road Completed

    Airport East Precinct Mascot Eastern City

    District

    Road Roads east of the airport will be upgraded and the

    General Holmes Drive rail level crossing will be

    removed by constructing a road underpass. This would

    improve the movement of rail freight facilities to and

    from Port Botany, and improve traffic flow and access to

    the airport and Port Botany. Key features and benefits of

    the project are replacing the General Holmes Drive rail

    level crossing with a road underpass that links General

    Holmes Drive, Botany Road and Wentworth Avenue to

    improve the movement of rail freight and improve access

    to the Airport, Mascot and the eastern suburbs; providing

    improvements to the Mill Pond Road intersections with

    General Holmes Drive and Botany Road to support

    future growth and access to the airport; widening Joyce

    Drive and General Holmes Drive between O'Riordan

    Street and Mill Pond Road to three lanes in each

    direction to improve traffic flow around the airport and

    to Port Botany; creating a new shared path to link to the

    existing cycle way on Wentworth Avenue to improve

    connections for pedestrians and cyclists; and retaining

    the northbound bus stop on Botany Road close to the

    existing location to meet community needs.

    In-Progress

  • Name Suburb Region/District Project Type Project Description Current

    Status

    Airport North Precinct Mascot Eastern City

    District

    Road Roads north of Sydney Airport are being upgraded to

    improve traffic flow and connections to the airport and

    Port Botany. Key features of the upgrade include

    converting the southern sections of Robey Street and

    O’Riordan Street into one-way roads; widening

    O’Riordan Street to provide six through lanes between

    Bourke Road and Robey Street; reconfiguring the

    existing traffic lights on O’Riordan Street between

    Qantas Drive and Bourke Road; and upgrading the

    footpath on the eastern side of O’Riordan Street. The

    upgrades will help increase traffic capacity and reduce

    congestion along O’Riordan Street, and improve access

    to Sydney Airport domestic terminals.

    Planning

    Airport Street

    cycleway

    Temora Riverina - Murray Walking and Cycling Road Shoulder cycleway alongside Airport Street Completed

    Airport West Precinct Arncliffe Eastern City

    District

    Road Marsh Street, Arncliffe is being widened to three lanes

    westbound to relieve congestion and improve traffic

    flow. The project supports and complements upgrades to

    Sydney Airport’s internal road network. Key features

    include widening Marsh Street to three lanes westbound

    between the Giovanni Brunetti Bridge and the M5

    interchange, meaning Marsh Street would be three lanes

    in both directions; providing a dedicated cycleway on the

    southern side of Marsh Street to connect the existing

    path on the bridge to the Eve Street cycleway; providing

    a pedestrian crossing at the intersection of Marsh Street

    and Flora Street; and minor widening of the existing

    eastbound and westbound lanes to provide wider, safer

    lanes for motorists. Key benefits include increasing

    traffic capacity and reduce congestion on Marsh Street

    for westbound traffic; improving cycle access in the area

    and increase safety for cyclists; and improving

    pedestrian access in the area.

    In-Progress

  • Name Suburb Region/District Project Type Project Description Current

    Status

    Albert Street

    cycleway

    Moruya South East &

    Tablelands

    Walking and Cycling Shared Path cycleway alongside Albert Street Completed

    Albion Park

    Interchange -

    Commuter Parking

    Albion Park Rail Illawarra

    Shoalhaven

    Parking Conversion of an existing staff car park to provide two

    extra commuter car parking spaces.

    Completed

    Albion Park

    Interchange - Transport

    Access Program

    Upgrade

    Albion Park Rail Illawarra

    Shoalhaven

    Interchange Improvements to the transport interchange facilities and

    access at Albion Park Station included redesigning and

    regrading of the ramp on the western side of the station

    to make it wheelchair compliant; improving pedestrian

    access to the western side bus stop on the Princes

    Highway; providing a more user friendly bicycle parking

    facility; and providing a formalised ‘kiss and ride’ area

    for passenger pick up and drop off.

    Completed

    Albion Park Rail

    Bypass - Princes

    Highway Upgrade

    Albion Park Illawarra

    Shoalhaven

    Road Planning is underway for a future extension of the M1

    Princes Motorway between Yallah and Oak Flats to

    provide a bypass of Albion Park Rail. The bypass will

    complete the 'missing link' for a high standard road

    between Sydney and Bomaderry.

    Planning

    Albion Park Station Refresh Package 3a

    Albion Park Rail North Rail The Station Refresh Program, within the Customer Experience Improvement Programs seeks to fulfil the

    needs of the customer by investing in improvements to

    the customer facilities and amebience at stations. The

    eight elements of scope are: Bird Proofing, Cleaning,

    Painting/Painting Stripping, LED Lighting, Toilet

    refurbishments, Landscaping, Station Precient repairs

    and Kit of Parts upgrade (Seats, Bins and Bubblers)

    Completed

    Albury Station Refresh Package 4a

    Albury Central City Rail The Station Refresh Program, within the Customer Experience Improvement Programs seeks to fulfil the

    needs of the customer by investing in improvements to

    the customer facilities and amebience at stations. The

    eight elements of scope are: Bird Proofing, Cleaning,

    Painting/Painting Stripping, LED Lighting, Toilet

    refurbishments, Landscaping, Station Precient repairs

    and Kit of Parts upgrade (Seats, Bins and Bubblers)

    Completed

  • Name Suburb Region/District Project Type Project Description Current

    Status

    Alfords Point Road

    Upgrade

    Alfords Point South District Road Alfords Point Road will be widened between the

    Georges River and Brushwood Drive. The upgrade will

    reduce congestion, improve travel times and improve

    road safety. The upgrade will also provide improvements

    to the local road network.

    In-Progress

    Alice Street Harris Park Central City Road Install pedestrian fence and kerb ramp/footpath works in

    Alice Street east of Good Street, Harris Park. Includes

    construction of pedestrian fence on both sides of Alice

    Street east of the existing pedestrian crossing and also to

    upgrade footpath/kerb ram

    Completed

    Allambie Road

    cycleway

    Allambie

    Heights

    North District Walking and Cycling Road Shoulder cycleway alongside Allambie Road Completed

    Allandale Road Cessnock Hunter Road Install traffic signals at McGrane St, and left in left out

    on eastern leg of Jurd St

    Not Started

    Allawah Interchange -

    Transport Access

    Program Upgrade

    Hurstville South District Interchange The transport interchange facilities at Allawah have been

    upgraded to make it easier for commuters to access the

    station by different transport modes. The upgrade

    included changes to bus stops, footpaths and ramps, a

    new 'kiss and ride' pedestrian drop-off zone, bicycle

    racks, shelters, fencing, guides for the visually impaired

    and signage on both sides of the station to improve

    accessibility.

    Completed

    Allworth Boat Ramp

    Improvements (Car

    Park and Lighting)

    Allworth Hunter Maritime Works include the installation of a new toilet, improve lighting and investigating the removal of Allworth

    Swimming baths.

    Planning

    Alpine Way Khancoban Riverina Murray Road VAS curve warning signs Completed

    Alpine Way Geehi Riverina Murray Road VAS curve warning signs Completed

    Angels Beach Drive East Ballina North Coast Road Install roundabout and provide superelevation, RRPMs

    and curve advisory signs

    Completed

  • Name Suburb Region/District Project Type Project Description Current

    Status

    Anzac Park Boating

    Access Improvements

    (Dinghy Storage and

    Launching Facility),

    Tea Gardens

    Tea Gardens Hunter Maritime Installation of new dinghy launching and storage facilities within Anzac Park.

    Planning

    Apex Park Boat Ramp

    & Car Park Upgrade,

    Wagga Wagga (Lake

    Albert)

    Lake Albert Riverina Murray Maritime Upgrade of the Apex Park boat ramp facility at Lake Albert. Works include: Widening the existing boat ramp

    to 8m and installation of lane dividers to make it a two

    lane ramp; expansion and redevelopment of the existing

    car park to increase car/trailer parking capacity

    (resealing, linemarking, signage, solar lighting); and

    improvements to the lake foreshore including

    stabilisation of 215m of the foreshore using Elcorock

    sand bags (to replace failed retaining walls), installation

    of boat tie up points and installation of rubbish stations.

    Planning

    Apex Park Boat Ramp

    Facility Upgrade, Lake

    Hume

    Lake Hume

    Village

    Riverina Murray Maritime Upgrade of the Apex Park boat ramp facility. The project will be staged with Stage 1 to involve the development

    of a Master Plan for the site and Stage 2 to comprise

    construction of identified infrastructure priorities.

    Planning

    Apex Park Boat Ramp

    Upgrade, Narooma North Narooma South East and

    Tablelands

    Maritime Additional Funding for the upgrade of the boat ramp

    facility at Apex Park, Narooma. Works include:

    construction of a new two lane concrete boat ramp,

    construction of a new modular centre ramp pontoon,

    refurbishment of the existing jetty.

    Completed

    Appin Road Cataract Illawarra

    Shoalhaven

    Road Realign curve from between 200-600 to between 600-

    1000m, provide appropriate super elevation, install wire

    rope barrier on roadside from no barrier and widen

    shoulder to 2.5m outside curve and 1m inside curve

    Completed

  • Name Suburb Region/District Project Type Project Description Current

    Status

    Armidale Interchange -

    Transport Access

    Program Upgrade

    Armidale New England North

    West

    Interchange Interchange upgrade at Armidale railway station and

    coach depot. The upgrade at the railway station included

    resurfacing of the car park, nine extra commuter car

    parking spaces including one accessible parking space,

    improving footpaths, installing new signage and bicycle

    parking facilities, as well as upgrades to lighting. The

    upgrade at the Visitor Information Centre coach

    interchange included a new bus shelter, lighting, CCTV

    surveillance cameras and accessibility upgrades to the

    existing rest rooms. The new shelter will keep

    passengers out of the elements while waiting for coaches

    and disembarking.

    Completed

    Armidale Regional Council Truck Wash Capacity Upgrade

    Armidale New England

    North West

    Freight Install dedicated 50mm mains water service with associated meter and backflow device to truck wash.Install a new pressure pump for Bay 2 (currently unequipped) and upgrade current pressure pump on Bay 1 (pump is 10+ years old)Install two 22,700 litre poly tanks for pump draw off reservoir.Upgrade AvData controller to service additional wash bay.Install colour bond fencing to separate the two wash bays.

    Planning

    Armidale Road Nymboida North Coast Road Improve vertical alignment, superelevation, horizontal

    alignment and install shoulders, CAMs and guideposts

    Completed

    Arncliffe Interchange -

    Commuter Parking

    Arncliffe Eastern City

    District

    Parking Conversion of existing staff car park to provide two extra

    commuter car parking spaces.

    Completed

  • Name Suburb Region/District Project Type Project Description Current

    Status

    Arncliffe Interchange -

    Transport Access

    Program Upgrade

    Arncliffe Eastern City

    District

    Interchange Arncliffe Station is now accessible for all customers with

    four new lifts connecting the concourse, platform and

    street levels. The lifts will make commuting easier for

    our customers, especially those with a disability, the

    elderly, parents with prams and travellers with luggage.

    Key features of the upgrade include four new lifts; new

    canopies on the footbridge and platforms; upgraded

    CCTV surveillance cameras and announcement systems;

    new sheltered bus stops, taxi rank and kiss and ride area

    along Firth Street; new family accessible toilets at the

    platform level; two new accessible parking spaces within

    the existing car park off Burrows Street; upgraded stairs

    and wayfinding signage; and new bicycle racks.

    Completed

    Artarmon Interchange -

    Transport Access

    Program Upgrade

    Artarmon North District Interchange Improvements to the accessibility at Artarmon Station

    included two new lifts, a new pedestrian bridge to

    improve access from Hampden Road and a new

    accessible parking space on Hampden Road.

    Completed

    Artarmon Station Refresh Package 2

    Artarmon Hunter Rail The Station Refresh Program, within the Customer Experience Improvement Programs seeks to fulfil the

    needs of the customer by investing in improvements to

    the customer facilities and amebience at stations. The

    eight elements of scope are: Bird Proofing, Cleaning,

    Painting/Painting Stripping, LED Lighting, Toilet

    refurbishments, Landscaping, Station Precient repairs

    and Kit of Parts upgrade (Seats, Bins and Bubblers)

    Completed

    Ashfield Interchange -

    Commuter Parking

    Ashfield Eastern City

    District

    Parking Conversion of existing staff car park to provide three

    extra commuter car parking spaces.

    Completed

    Ashfield Interchange -

    Commuter Parking

    Ashfield Eastern City

    District

    Parking A new multi-storey car park on Brown Street will

    include 120 new commuter spaces, fencing, lighting and

    CCTV to boost access and security.

    In-Progress

  • Name Suburb Region/District Project Type Project Description Current

    Status

    Ashfield Station Refresh Package 2

    Ashfield Hunter Rail The Station Refresh Program, within the Customer Experience Improvement Programs seeks to fulfil the

    needs of the customer by investing in improvements to

    the customer facilities and amebience at stations. The

    eight elements of scope are: Bird Proofing, Cleaning,

    Painting/Painting Stripping, LED Lighting, Toilet

    refurbishments, Landscaping, Station Precient repairs

    and Kit of Parts upgrade (Seats, Bins and Bubblers)

    Completed

    Asquith Interchange -

    Commuter Parking

    Asquith North District Parking The project includes constructing a 42 space commuter

    car park on Jersey Street North; two accessible parking

    spaces close to the station (within the Haldane Street car

    park); a pedestrian link from the car park to the station;

    and improved lighting and CCTV surveillance.

    In-Progress

    Asquith Station Refresh Package 1

    Asquith South East and Tablelands

    Rail The Station Refresh Program, within the Customer

    Experience Improvement Programs seeks to fulfil the

    needs of the customer by investing in improvements to

    the customer facilities and amebience at stations. The

    eight elements of scope are: Bird Proofing, Cleaning,

    Painting/Painting Stripping, LED Lighting, Toilet

    refurbishments, Landscaping, Station Precient repairs

    and Kit of Parts upgrade (Seats, Bins and Bubblers)

    Completed

    Auburn Interchange -

    Transport Access

    Program Upgrade

    Auburn Central City

    District

    Interchange Improvements to the transport interchange facilities at

    Auburn Station included upgrading the Northumberland

    Road ‘kiss and ride’ facility to incorporate seating and

    signage; removing the existing stairs that lead to the

    ramp at the Railway Station entrance and exit at South

    Parade; and installing a new weather wall at the South

    Parade bus stop.

    Completed

    Austinmer Interchange

    - Commuter Parking

    Austinmer Illawarra

    Shoalhaven

    Parking Conversion of existing staff car park to provide two extra

    commuter car parking spaces.

    Completed

    Austinmer Interchange

    - Transport Access

    Program Upgrade

    Austinmer Illawarra

    Shoalhaven

    Interchange Improvements to Austinmer Station included redesigning

    and rebuilding the ramp to platform 2.

    Completed

  • Name Suburb Region/District Project Type Project Description Current

    Status

    Automatic Train

    Protection

    Haymarket Eastern City

    District

    Rail The Automatic Train Protection (ATP) Program will see

    the Sydney Trains metropolitan and NSW TrainLink

    intercity rail network fitted with new equipment to

    improve rail safety by monitoring a train’s speed and

    position on the network and automatically intervening or

    braking to ensure safe operations.

    In-Progress

    Back Creek Boating

    Access Improvements,

    South West Rocks

    South West

    Rocks

    North Coast Maritime Planning

    Backmans Swamp

    Creek cycleway

    Orange Central West &

    Orana

    Walking and Cycling Shared Path cycleway alongside Backmans Swamp

    Creek

    Completed

    Ballina Interchange -

    Transport Access

    Program Upgrade

    Ballina North Coast Interchange Construction of new waiting areas and installation of

    additional lighting.

    Completed

    Ballina Road

    cycleway

    East Lismore North Coast Walking and Cycling Shared Path cycleway alongside Ballina Road Completed

    Ballina Trawler

    Harbour Development

    (Investigation), Ballina

    West Ballina North Coast Maritime Preparation of a development options review to determine the preferred use of the Ballina Trawler

    Harbour Precinct.

    Planning

    Balmain East Wharf -

    Wharf Upgrade

    Program

    Balmain East Eastern City

    District

    Maritime The new wharf is made up of a steel floating pontoon, a

    concrete fixed entry platform and an aluminium

    gangway connecting the entry platform to the pontoon.

    The pontoon has a curved roof, glass panels and new

    seating offering some protection from the weather and

    improved amenity. The new wharf provides better

    protection from the wind, rain and sun; improved safety

    for customers; improved access for mobility impaired

    customers and customers with prams; quicker and more

    efficient boarding and disembarking; and future capacity

    for two ferries to berth at the wharf at the same time.

    Completed

    Balmain Thames Street

    Wharf - Wharf

    Upgrade Program

    Balmain Eastern City

    District

    Maritime Ferry wharf upgrade to improve the safety and amenity

    for passengers and better accessibility for customers with

    mobility aids.

    Completed

  • Name Suburb Region/District Project Type Project Description Current

    Status

    Balmoral Reserve Boat

    Ramp Car Park

    Upgrade, Balmoral

    Balmoral Hunter Maritime Upgrade of the Balmoral Reserve boat ramp car park. Works include: formalisation (sealing and line marking)

    of the existing gravel car park, improvements to the boat

    ramp manouevring area and formalisation of boat rigging

    and wash down area.

    Planning

    Balranald Caravan Park

    Boat Ramp Pontoon,

    Balranald

    Balranald Far West Maritime Installation of two 8m pontoons at the boat ramp (one either side of the ramp) and construction of two unisex

    toilets on the upper level trailer parking area at the site.

    Planning

    Balranald Truck Wash Project

    Balranald Far West Freight Extend existing concrete apron to accommodate road train configuration vehicle. Install new Avdata or similar operations system including water supply and pressure pump system. Install water treatment facility and outfall retention. Area lighting and access ladders.

    Planning

    Bandon Road Link Vineyard Western City

    District

    Road A new road corridor is planned between Richmond

    Road, Marsden Park and Windsor Road, Vineyard. This

    is part of the North West Growth Centre Road Network

    Strategy that was confirmed by the NSW Government in

    July 2015. The preferred corridor would cater for a new

    four lane divided road including a central median to

    allow for future widening; an off-road shared path for

    pedestrians and cyclists; a new road underpass of the

    Richmond railway line at Vineyard; and traffic light

    intersections and a central median to improve road

    safety.

    Planning

    Bankstown Interchange

    - Commuter Parking

    Bankstown South District Parking Conversion of existing staff car park to provide ten extra

    commuter car parking spaces, including two accessible

    parking spaces.

    Completed

    Bankstown Interchange

    - Transport Access

    Program

    Bankstown South District Interchange Improvements to Bankstown Station included new stairs

    and ramps to improve circulation at the northern and

    southern station entrances; relocation and installation of

    additional ticket barriers; installation of a covered

    walkway to the bus interchange; widening the staircase

    access to platform; and installation of bicycle parking

    facilities.

    Completed

  • Name Suburb Region/District Project Type Project Description Current

    Status

    Barangaroo Ferry Hub Barangaroo Eastern City

    District

    Maritime The Barangaroo Ferry Hub will serve Sydney’s newest

    commercial district and provide increased capacity for

    ferry services to meet future demand. The new ferry hub

    will provide berthing space for additional ferry services

    from the Parramatta River, as well as direct access to and

    from the Eastern Suburbs and lower North Shore. The

    new ferry hub will connect customers to the city centre

    via Wynyard Walk, a high quality pedestrian link

    between Barangaroo and Wynyard Station. Key features

    include two new ferry wharves with a landing and ramp

    to connect the floating pontoon to the land; two berthing

    faces for ferries on each pontoon; new facilities for

    customer safety and comfort at each wharf, including

    seating, lighting, passenger information display and

    weather protection; integrated electronic ticketing system

    for public transport in Sydney using the Opal card; and

    public amenities such as bins, ticket vending machines,

    wayfinding and signage.

    In-Progress

    Barmedman Road

    cycleway

    Temora Riverina - Murray Walking and Cycling Shared Path cycleway alongside Barmedman Road Completed

    Barrenjoey Road Bilgola North Road CAMs, curve advisory signs and warning signs Completed

    Barrington Bridge

    Replacement - Bridges

    for the Bush - Tranche

    2

    Barrington Hunter Road The Barrington Bridge which crosses the Barrington River at Barrington, was built in 1920. The bridge is

    located on Thunderbolts Way, which is an important

    freight link between the Mid North Coast and the New

    England Tablelands serving tourism, livestock and

    timber industries. The timber truss bridge is narrow and

    requires a high level of maintenance. The proposal is to

    replace the bridge with a conctete structure on a new

    alignment. Design is progressing.

    Planning

  • Name Suburb Region/District Project Type Project Description Current

    Status

    Barton Highway Safety

    Works

    Murrumbateman South East &

    Tablelands

    Road A package of safety works was undertaken on the Barton

    Highway. Safety works at the intersection of McIntosh

    Circuit and the Barton Highway included providing

    turning lanes on the Barton Highway and McIntosh

    Circuit and improving lighting. Safety at the Euroka

    Avenue intersection with the Barton Highway was

    improved including widening the shoulder on the

    northbound lane, building new designated turning lanes

    into Euroka Avenue and some vegetation removal to

    improve sight distance. A curve on the Barton Highway

    just south of Murrumbateman Road was realigned and a

    turning lane was built for vehicles turning right into

    Murrumbateman Road. A one kilometre section of the

    Barton Highway at Capricorn Corner was realigned

    given its crash history. Construction of 4.5 kilometres of

    new road at Gounyan curves was undertaken to remove

    seven bends in the highway. A 1.2 kilometre southbound

    overtaking lane has also been built to replace the existing

    northbound overtaking lane. Other safety works being

    planned along sections of the Barton Highway include

    extending culverts, removing trees, flattening

    embankments and installing safety barriers.

    Completed

    Bass Point Boat Ramp

    Car Park Upgrade,

    Shell Cove

    Shell Cove Illawarra

    Shoalhaven

    Maritime Planning

    Batemans Bay

    Interchange - Transport

    Access Program

    Upgrade

    Batemans Bay South East &

    Tablelands

    Interchange Construction of new drop off and pick up areas. Completed

    Batemans Bay Sewage

    Pump-out Facility North Batemans

    Bay

    South East and

    Tablelands

    Maritime Planning

    Batemans Bay/Clyde

    River Boating

    Infrastructure Upgrades

    Batemans Bay South East and

    Tablelands

    Maritime Planning

  • Name Suburb Region/District Project Type Project Description Current

    Status

    Bathurst Station Refresh Package 2a

    Bathurst Eastern City Rail The Station Refresh Program, within the Customer Experience Improvement Programs seeks to fulfil the

    needs of the customer by investing in improvements to

    the customer facilities and amebience at stations. The

    eight elements of scope are: Bird Proofing, Cleaning,

    Painting/Painting Stripping, LED Lighting, Toilet

    refurbishments, Landscaping, Station Precient repairs

    and Kit of Parts upgrade (Seats, Bins and Bubblers)

    Completed

    Baulkham Hills

    Interchange -

    Commuter Parking

    Baulkham Hills Central City

    District

    Parking New commuter car park at Torrs Street providing 183

    commuter car parking spaces, including four accessible

    parking spaces.

    Completed

    Baulkham Hills

    Interchange - Transport

    Access Program

    Upgrade

    Baulkham Hills Central City

    District

    Interchange New bus shelters have been installed on Windsor Road

    and Old Northern Road, as well as improvements

    delivered to lighting and footpaths. Kiss and ride

    facilities are now available on Railway Street, with new

    pram ramps also delivered on Olive Street.

    Completed

    Bayview Wharf

    Upgrade & New

    Pontoon, Bayview

    Bayview North Maritime Upgrade of the existing Bayview wharf which is in poor condition. Works include staibilsation of the stone

    groyne (that joins the wharf to the shore), and

    replacement of some fender piles, decking planks, wharf

    beams, and fastenings. The improvement works also

    include the installation of a new pontoon to provide short

    term berthings for boats.

    Planning

    Beauty Point Boat

    Ramp Facility

    Upgrade, Wallaga Lake

    Wallaga Lake South East and

    Tablelands

    Maritime Upgrade of the Beauty Point boat ramp. Works include:

    replacement of the existing gravel boat ramp with a new

    concrete double ramp, enlargement and upgrade of the

    existing site access road and ramp approach, enlargement

    and formalisation of car/trailer parking.

    Planning

    Beecroft Interchange -

    Commuter Parking

    Beecroft North District Parking Conversion of existing staff car park to provide one extra

    commuter car parking space.

    Completed

  • Name Suburb Region/District Project Type Project Description Current

    Status

    Bega Bypass Bega South East &

    Tablelands

    Road The 3.5 kilometre, two lane bypass takes heavy vehicles

    out of Bega CBD and improves safety. A new

    roundabout south of the Bega River Bridge was also

    installed and the intersection at Finucane Lane was

    rebuilt to improve sight distance and road safety. The

    bypass supports the region's economy by allowing the

    Princes Highway between the Snowy Mountains

    Highway and the Victorian border to be used by B

    double heavy vehicles by providing an approved route at

    Bega without sharp corners.

    Completed

    Belgrave Street Manly North Road Pedestrian protection at traffic lights Completed

    Bellambi Interchange -

    Commuter Parking

    Bellambi Illawarra

    Shoalhaven

    Parking Conversion of existing staff car park to provide two extra

    commuter car parking spaces.

    Completed

    Bellambi Station Refresh Package 3a

    Bellambi North Rail The Station Refresh Program, within the Customer Experience Improvement Programs seeks to fulfil the

    needs of the customer by investing in improvements to

    the customer facilities and amebience at stations. The

    eight elements of scope are: Bird Proofing, Cleaning,

    Painting/Painting Stripping, LED Lighting, Toilet

    refurbishments, Landscaping, Station Precient repairs

    and Kit of Parts upgrade (Seats, Bins and Bubblers)

    Completed

    Bellevue Estate

    cycleway

    Mudgee Central West &

    Orana

    Walking and Cycling Shared Path cycleway alongside Bellevue Estate Completed

    Bells Line of Road -

    Castlereagh

    Connection Corridor

    Preservation

    South Windsor Western City

    District

    Road Transport for NSW is investigating a suitable corridor

    for the Bells Line of Road – Castlereagh Connection to

    provide an alternative route across the Blue Mountains.

    The investigation would identify a suitable corridor

    connecting the Bells Line of Road east of Kurrajong

    Heights with the Sydney Motorway Network.

    In-Progress

  • Name Suburb Region/District Project Type Project Description Current

    Status

    Bells Line of Road

    Corridor Improvement

    Program

    Berambing Western City

    District

    Road Road safety and traffic efficiency are being improved on

    Bells Line of Road between Lithgow and Kurrajong

    Heights by providing more overtaking lanes and wider

    sealed shoulders. This includes safety improvements on

    Chifley Road between Bell and Lithgow including curve

    and grade improvements at Scenic Hill and a road over

    rail bridge replacement at Clarence.

    In-Progress

    Belmore Interchange -

    Commuter Parking

    Belmore South District Parking Conversion of existing staff car park to provide five

    extra commuter car parking spaces.

    Completed

    Belmore Station Refresh Package 4

    Belmore Western City Rail The Station Refresh Program, within the Customer Experience Improvement Programs seeks to fulfil the

    needs of the customer by investing in improvements to

    the customer facilities and amebience at stations. The

    eight elements of scope are: Bird Proofing, Cleaning,

    Painting/Painting Stripping, LED Lighting, Toilet

    refurbishments, Landscaping, Station Precient repairs

    and Kit of Parts upgrade (Seats, Bins and Bubblers)

    Completed

    Belmore Street

    cycleway

    Junee Riverina - Murray Walking and Cycling Shared Path cycleway alongside Belmore Street Completed

    Bemboka Bridge

    Upgrade - Bridges for

    the Bush - Program 1

    Morans Crossing South East &

    Tablelands

    Road The project includes upgrades to the road approaches and

    improved safety with the improvement of existing traffic

    barriers to current Australian standards. Key features

    include widening of the bridge and both road

    approaches, specifically to allow an increase in traffic

    lane width, an increase in shoulder width and provision

    for cyclists on the bridge; intersection upgrade works at

    Polacks Flat Road to improve sight distance to the west;

    realignment of the unnamed access track intersection

    immediately west of the bridge to improve sight

    distances; and two permanent combined sedimentation

    and accident spill basins. The upgrade improves freight

    productivity by removing a significant freight bottleneck.

    Completed

  • Name Suburb Region/District Project Type Project Description Current

    Status

    Berala Interchange -

    Transport Access

    Program Upgrade

    Berala Central City

    District

    Interchange Improvements to Berala interchange include a new lift; a

    new canopy; a family accessible toilet; undercover

    bicycle racks; improved interchange areas, including kiss

    and ride zones, two accessible parking spaces and an

    upgraded bus shelter; upgrades to lighting and CCTV

    surveillance; and improved wayfinding signage.

    In-Progress

    Berala Station Refresh Package 1

    Berala South East and Tablelands

    Rail The Station Refresh Program, within the Customer

    Experience Improvement Programs seeks to fulfil the

    needs of the customer by investing in improvements to

    the customer facilities and amebience at stations. The

    eight elements of scope are: Bird Proofing, Cleaning,

    Painting/Painting Stripping, LED Lighting, Toilet

    refurbishments, Landscaping, Station Precient repairs

    and Kit of Parts upgrade (Seats, Bins and Bubblers)

    Completed

    Berkeley Harbour

    Boating Facilities

    Improvements

    (Investigation), Lake

    Illawarra

    Berkeley Illawarra

    Shoalhaven

    Maritime Planning

    Bernera Road

    cycleway

    Prestons Western City

    District

    Walking and Cycling Shared Path cycleway alongside Bernera Road Completed

    Berowra Interchange -

    Commuter Parking

    Berowra North District Parking Conversion of existing staff car park to provide two extra

    commuter car parking spaces.

    Completed

    Berry Interchange -

    Commuter Parking

    Berry Illawarra

    Shoalhaven

    Parking Conversion of existing staff car park to provide two extra

    commuter car parking spaces.

    Completed

    Berry to Bomaderry -

    Princes Highway

    Upgrade

    Bomaderry Illawarra

    Shoalhaven

    Road The upgrade will provide around 10.6 kilometres of four-

    lane highway with median separation between Mullers

    Lane, Berry and Cambewarra Road, Bomaderry. Once

    the highway upgrade between Berry and Bomaderry is

    built it will complete four lanes of divided highway

    between Waterfall and Jervis Bay Road, Falls Creek.

    Planning

  • Name Suburb Region/District Project Type Project Description Current

    Status

    Beverly Hills

    Interchange - Transport

    Access Program

    Upgrade

    Beverly Hills South District Interchange Improvements to Beverly Hills interchange include new

    pick up and drop off areas, new taxi rank and bus shelter.

    Completed

    Beverly Hills Station Refresh Package 4

    Beverly Hills Western City Rail The Station Refresh Program, within the Customer Experience Improvement Programs seeks to fulfil the

    needs of the customer by investing in improvements to

    the customer facilities and amebience at stations. The

    eight elements of scope are: Bird Proofing, Cleaning,

    Painting/Painting Stripping, LED Lighting, Toilet

    refurbishments, Landscaping, Station Precient repairs

    and Kit of Parts upgrade (Seats, Bins and Bubblers)

    Completed

    Bexley North

    Interchange -

    Commuter Parking

    Bexley North Eastern City

    District

    Parking Conversion of existing staff car park to provide five

    extra commuter car parking spaces

    Completed

    Birchgrove Wharf -

    Wharf Upgrade

    Program

    Birchgrove Eastern City

    District

    Maritime The wharf upgrade will provide improved customer

    amenity such as better protection from the wind, rain and

    sun, seating and waiting areas; improved safety for

    customers; improved access for mobility impaired

    customers and customers with prams; quicker and more

    efficient boarding and disembarking; increased wharf

    capacity for future growth of ferry services; more

    efficient interchanges with other modes of transport, both

    public and private; and better way finding signage.

    Planning

    Black Diamond

    Place cycleway

    Bulli Illawarra

    Shoalhaven

    Walking and Cycling Shared Path cycleway alongside Black Diamond

    Place

    Completed

    Blackheath Station Refresh Package 4a

    Blackheath Central City Rail The Station Refresh Program, within the Customer Experience Improvement Programs seeks to fulfil the

    needs of the customer by investing in improvements to

    the customer facilities and amebience at stations. The

    eight elements of scope are: Bird Proofing, Cleaning,

    Painting/Painting Stripping, LED Lighting, Toilet

    refurbishments, Landscaping, Station Precient repairs

    and Kit of Parts upgrade (Seats, Bins and Bubblers)

    Completed

  • Name Suburb Region/District Project Type Project Description Current

    Status

    Blacktown Interchange

    - Commuter Parking

    Blacktown Central City

    District

    Parking Conversion of existing staff car park to provide 113 extra

    commuter car parking spaces.

    Completed

    Blacktown Interchange

    - Commuter Parking

    Blacktown Central City

    District

    Parking New multi-storey commuter car park providing 489 new

    commuter car park spaces, including 15 accessible

    parking spaces, eight motorcycle spaces and 40 spaces

    for securing bicycles. The car park also includes lifts,

    security lighting and CCTV surveillance. Parking is free

    and available 24 hours, seven days a week.

    Completed

    Blacktown Interchange

    - Transport Access

    Program Upgrade

    Blacktown Central City

    District

    Interchange Improvements to Blacktown interchange will include

    extending the station concourse to allow for additional

    ticket barriers and provide more space for better

    passenger circulation.

    In-Progress

    Blacktown Road

    cycleway

    Blacktown Central City

    District

    Walking and Cycling Shared Path cycleway alongside Blacktown Road Completed

    Blacktown Station Refresh Package 1

    Blacktown Central Coast Rail The Station Refresh Program, within the Customer Experience Improvement Programs seeks to fulfil the

    needs of the customer by investing in improvements to

    the customer facilities and amebience at stations. The

    eight elements of scope are: Bird Proofing, Cleaning,

    Painting/Painting Stripping, LED Lighting, Toilet

    refurbishments, Landscaping, Station Precient repairs

    and Kit of Parts upgrade (Seats, Bins and Bubblers)

    Completed

    Blaxcell Street Granville Central City Road The proposal is to raise the existing pedestrian crossing

    on Blaxcell Street, immediately north of Thomas Street,

    Granville. The project will include construction of a

    wombat crossing with associated signs and line

    markings, and realignment of the existi

    Completed

    Blaxland Interchange -

    Commuter Parking

    Blaxland Western City

    District

    Parking Conversion of existing staff car park to provide three

    extra commuter car parking spaces.

    Completed

    Blaxland Interchange -

    Transport Access

    Program Upgrade

    Blaxland Western City

    District

    Interchange New steel canopies were installed on the station platform

    to provide better protection for customers against rain

    and sun exposure.

    Completed

  • Name Suburb Region/District Project Type Project Description Current

    Status

    Blaxland Road

    cycleway

    Ryde North District Walking and Cycling Shared Path cycleway alongside Blaxland Road Completed

    Blaxland Station Refresh Package 3a

    Blaxland North Rail The Station Refresh Program, within the Customer Experience Improvement Programs seeks to fulfil the

    needs of the customer by investing in improvements to

    the customer facilities and amebience at stations. The

    eight elements of scope are: Bird Proofing, Cleaning,

    Painting/Painting Stripping, LED Lighting, Toilet

    refurbishments, Landscaping, Station Precient repairs

    and Kit of Parts upgrade (Seats, Bins and Bubblers)

    Completed

    Boambee Creek Boat

    Ramp Upgrade, Coffs

    Harbour

    Toormina North Coast Maritime Upgrade of the Boambee Creek boat ramp. Works include replacement of the old exisiting ramp with a new

    precast concrete ramp and repairs to the upper section of

    the ramp.

    Planning

    Boating Access

    Improvements (New

    Pontoons) at

    Macksville

    Macksville North Coast Maritime Improvements to boating infrastructure at River Street Reserve, Macksville. Works include the upgrade to the

    existing timber jetty (including the installation of a roof),

    the installation of a new pontoon and gangway facility

    west of the jetty, and access improvements from the site's

    toilets to the jetty and new pontoon.

    Planning

    Boating Access

    Improvements at

    Willoughby’s

    Beach, Murray Valley

    Regional Park

    Deniliquin Riverina Murray Maritime Construction of a single lane concrete boat ramp at Willoughby's Beach for access to the Edward River for

    small boats and non-powered watercraft (as this site is an

    entry/exit point for the Edward River Canoe Trail). Other

    works include the formalisation of a car park area at the

    site.

    Planning

  • Name Suburb Region/District Project Type Project Description Current

    Status

    Bobs Farm to Anna

    Bay - Nelson Bay Road

    Upgrade Stage 3

    Bobs Farm Hunter Road Nelson Bay Road has been upgraded from Bobs Farm to

    Anna Bay. Key features of the upgrade include provision

    of a second carriageway between Cromarty Lane and

    Port Stephens Drive roundabout, Anna Bay; rebuilding

    the existing carriageway; landscaped median to separate

    opposing traffic; ten upgraded bus bays; new u-turn

    facilities to provide safe access to properties along the

    route; pedestrian refuges in the median adjacent to bus

    bays; wider shoulders; and improved intersections. The

    upgrade has resulted in improved safety for motorists,

    cyclists and pedestrians; better bays for bus passengers;

    reduced traffic delays; and more reliable travel times for

    motorists using this section of Nelson Bay Road.

    Completed

    Bohnock Boat Ramp

    Facility Upgrade Bohnock Hunter Maritime Upgrade of the existing boat ramp facility at Bohnock.

    Works include widening/extending the existing boat

    ramp, the installation of an on-ramp centre pontoon,

    extension and sealing of the car park, and the installation

    of a fish cleaning table.

    Planning

    Bolivia Hill - New

    England Highway

    Upgrade

    Bolivia New England North

    West

    Road Planning is underway to upgrade the New England

    Highway at Bolivia Hill. The existing highway through

    the area has narrow traffic lanes shoulders, with a rock

    face on one side and a steep, rocky valley on the other.

    The project involves building about 2.1 kilometres of

    new road pavement, a new 320 metre long bridge that

    avoids the creek line, 3.5 metre wide lanes in each

    direction and widened road shoulders to improve safety.

    Planning

    Bomaderry (Nowra)

    Interchange -

    Commuter Parking

    Bomaderry Illawarra

    Shoalhaven

    Parking Conversion of existing staff car park to provide six extra

    commuter car parking spaces.

    Completed

  • Name Suburb Region/District Project Type Project Description Current

    Status

    Bomaderry Station Refresh Package 2a

    Bomaderry Eastern City Rail The Station Refresh Program, within the Customer Experience Improvement Programs seeks to fulfil the

    needs of the customer by investing in improvements to

    the customer facilities and amebience at stations. The

    eight elements of scope are: Bird Proofing, Cleaning,

    Painting/Painting Stripping, LED Lighting, Toilet

    refurbishments, Landscaping, Station Precient repairs

    and Kit of Parts upgrade (Seats, Bins and Bubblers)

    Completed

    Bombo Interchange -

    Commuter Parking

    Bombo Illawarra

    Shoalhaven

    Parking Conversion of existing staff car park to provide two extra

    commuter car parking spaces.

    Completed

    Bondi Junction Station Refresh Package 1

    Bondi Junction Central Coast Rail The Station Refresh Program, within the Customer Experience Improvement Programs seeks to fulfil the

    needs of the customer by investing in improvements to

    the customer facilities and amebience at stations. The

    eight elements of scope are: Bird Proofing, Cleaning,

    Painting/Painting Stripping, LED Lighting, Toilet

    refurbishments, Landscaping, Station Precient repairs

    and Kit of Parts upgrade (Seats, Bins and Bubblers)

    Completed

    Booth Street Annandale Eastern City Road Install illuminated pedestrian crossing signs at existing

    Booth Street, Annandale raised pedestrian crossing.

    Not Started

    Bowling Alley Point

    Boat Ramp Upgrade,

    Chaffey Dam

    Bowling Alley

    Point

    New England

    North West

    Maritime Planning

    Bowral Interchange -

    Commuter Parking

    Bowral South East &

    Tablelands

    Parking Conversion of existing staff car park to provide one extra

    commuter car parking space.

    Completed

    Bowral Station Refresh Package 4a

    Bowral Central City Rail The Station Refresh Program, within the Customer Experience Improvement Programs seeks to fulfil the

    needs of the customer by investing in improvements to

    the customer facilities and amebience at stations. The

    eight elements of scope are: Bird Proofing, Cleaning,

    Painting/Painting Stripping, LED Lighting, Toilet

    refurbishments, Landscaping, Station Precient repairs

    and Kit of Parts upgrade (Seats, Bins and Bubblers)

    Completed

  • Name Suburb Region/District Project Type Project Description Current

    Status

    Bradwardine Road

    cycleway

    Windradyne Central West &

    Orana

    Walking and Cycling Shared Path cycleway alongside Bradwardine Road Completed

    Braidwood Truck Wash Upgrade

    Braidwood South East and

    Tablelands

    Freight Install high pressure pump, upgrade lighting, upgrade fall on hardstand

    Planning

    Bridge Reserve Boat

    Ramp Facility

    Upgrade, Clarence

    Town

    Clarence Town Hunter Maritime Planning

    Bridges for the Bush -

    Program 2

    Condobolin Central West &

    Orana

    Road Replacement of six heritage timber truss bridges (to

    Higher Mass Limit standard) and upgrade of six heritage

    timber truss bridges to provide ongoing safe service

    levels. Addressing the state's deficient rural bridges is a

    key priority for NSW investment as the bridges currently

    present the most critical restrictions to freight access.

    In-Progress

    Brig O'Johnston Bridge

    Upgrade - Bridges for

    the Bush - Program 2

    Clarence Town Hunter Road The bridge over the Williams River at Clarence Town

    was built in 1880 and is the oldest surviving timber truss

    bridge in NSW. Rehabilitation work is required to

    strengthen the bridge to meet current vehicle loads and

    heavy vehicle requirements, as well as help to reduce

    future maintenance costs. The upgrade will improve road

    freight productivity.

    In-Progress

    Briner Bridge Upgrade

    - Bridges for the Bush -

    Tranche 2

    Ulmarra North Coast Road Briner Bridge, which was built in 1908, is a Dare truss bridge located between the villages of Ulmarra and

    Tucabia on Coldstream Terrace. The single span bridge

    crosses the Upper Coldstream River and is one of six

    operable Dare truss bridges and one of two single-span

    Dare truss bridges in NSW. Planning is under way to

    ensure the upgrade work preserves important heritage

    aspects of the structure.

    Planning

  • Name Suburb Region/District Project Type Project Description Current

    Status

    Bringelly Road

    Upgrade Stage 1 -

    Camden Valley Way to

    King Street

    Leppington Western City

    District

    Road The Bringelly Road Upgrade will deliver new and

    upgraded roads to support integrated transport in the

    region and capitalise on the economic benefits from

    developing a Western Sydney Airport at Badgerys

    Creek. It will also improve safety, increase road capacity

    and reduce congestion and travel times in the future. The

    key features of Stage 1 include upgrading Bringelly

    Road to a four lane divided road between Camden

    Valley Way and King Street; east of the Upper Canal

    bridge to Eastwood Road will be a six lane divided road;

    an 80km/h speed limit and two metre wide shoulders;

    three metre wide off-road shared pedestrian and cyclist

    path; bus priority at traffic lights and indented bus bays;

    extending the current noise wall on Cowpasture Road

    240 metres along Camden Valley Way.

    In-Progress

    Bringelly Road

    Upgrade Stage 2 - King

    Street to The Northern

    Road

    Rossmore Western City

    District

    Road The Bringelly Road Upgrade will deliver new and

    upgraded roads to support integrated transport in the

    region and capitalise on the economic benefits from

    developing a Western Sydney Airport at Badgerys

    Creek. It will also improve safety, increase road capacity

    and reduce congestion and travel times in the future. The

    key features of Stage 2 include upgrading from two lanes

    to a four lane divided road with a central median, which

    would allow for widening to six lanes, when required; a

    speed limit of 80 km/h; a three metre wide off road

    shared pedestrian and cyclist path with crossings at

    traffic lights to improve safety; designated turning lanes

    at traffic lights along with bus priority and indented bus

    bays on both sides of Bringelly Road; new signalised

    intersections; and new bridges over South Creek.

    In-Progress

    Brisbane Water Drive Tascott Central Coast Road Install kerbside barrier (southbound) to prevent vehicles

    from running onto shared pedestrian/cycle path on

    Brisbane Water Drive, Tascott.

    Completed

    Broadmeadow

    Interchange -

    Commuter Parking

    Broadmeadow Hunter Parking Conversion of existing staff car park to provide four

    extra commuter car parking spaces.

    Completed

  • Name Suburb Region/District Project Type Project Description Current

    Status

    Broadmeadow

    Interchange - Transport

    Access Program

    Upgrade

    Broadmeadow Hunter Interchange The upgrade to Broadmeadow Station includes three new

    lifts located at Platform 2/3, Brown Road entrance and

    Graham Road entrance; new weather protection canopies

    at the station entrances and on Platform 2;

    reconfiguration of the station entrances on Brown Road

    and Graham Road; upgraded security features including

    lighting and CCTV camera surveillance; improved

    wayfinding signage including tactile signage for vision

    impaired station users; footpath upgrades in the vicinity

    of the station entrances on Brown Road and Graham

    Road; a new electrical substation on Brown Road; and

    power upgrades.

    In-Progress

    Broadmeadow Station Refresh Package 1a

    Broadmeadow Illawarra Shoalhaven

    Rail The Station Refresh Program, within the Customer

    Experience Improvement Programs seeks to fulfil the

    needs of the customer by investing in improvements to

    the customer facilities and amebience at stations. The

    eight elements of scope are: Bird Proofing, Cleaning,

    Painting/Painting Stripping, LED Lighting, Toilet

    refurbishments, Landscaping, Station Precient repairs

    and Kit of Parts upgrade (Seats, Bins and Bubblers)

    Completed

    Broken Hill Truckwash Facility

    Broken Hill Far West Freight Construction of new truckwash (greenfield project) in broken Hill. The truck wash will be a one bay facility to cater for up to B-Double. It is drive- through truck wash and is able to cater for longer vehicles up to A triples..The project will consist of:1. Civil and siteworks - bitumising of site, installation of stormwater drainage and fencing2. Provision of directory signage3. Construction of roofing for truckwash facility4. Structure plumbing and drainage works5. Sewer reticulation works6. Electrical and communication works7. Pumping and control systems8. Installation of water recycling unit9. Construction and installation of truckwash bay10. Installation of wheelwash units11. AVData connection to site to ensure linkage to other truckwash facilities.

    Planning

  • Name Suburb Region/District Project Type Project Description Current

    Status

    Brooklyn Waterfront

    Master Plan

    (Development)

    Brooklyn North Maritime Planning

    Broughton Street

    cycleway

    Concord Eastern City

    District

    Walking and Cycling Shared Path cycleway alongside Broughton Street Completed

    Browns Creek Non-

    powered Boating

    Access Improvements,

    Taree

    Taree Hunter Maritime Provision of a small craft launch site into the sheltered waters of Browns Creek for use by canoeist and

    kayakers.

    Planning

    Brungle Road South Gundagai Riverina Murray Road Localised shoulder widening, W-beam Barrier,

    delineation improvements

    Completed

    Brunswick Heads Boat

    Harbour Master Plan

    Development

    Brunswick

    Heads

    North Coast Maritime Planning

    Brunswick Street Boat

    Ramp Upgrade, Ballina Ballina North Coast Maritime Installation of a pontoon at the existing boat ramp at

    Riverview Park, Brunswick Street, Ballina. The project

    also includes opportunities for investigation in to car

    parking improvements at the site.

    Planning

    Brunswick Street

    cycleway

    Lismore Heights North Coast Walking and Cycling Shared Path cycleway alongside Brunswick Street Completed

    Brushgrove Boat Ramp

    and Car Park Upgrade

    (Wingfield Bridge)

    Cowper North Coast Maritime Replacement of the current boat ramp with a new boat ramp; and

    construction of a new car park adjoining the boat ramp

    and pontoon.

    Planning

    Budd Park Pontoon

    Upgrade,

    Murwillumbah

    South

    Murwillumbah

    North Coast Maritime Upgrade and relocation of the existing pontoon at Budd Park to a more suitable location within the park.

    Planning

    Bulahdelah Bypass -

    Pacific Highway

    Upgrade

    Bulahdelah Hunter Road The upgrade of the Pacific Highway at Bulahdelah

    involved the construction of about 8.6 kilometres of four

    lane divided road with an eastern bypass of the

    Bulahdelah township.

    Completed

  • Name Suburb Region/District Project Type Project Description Current

    Status

    Bullaburra, Ridge

    Street to Genevieve

    Road

    Bullaburra Western City

    District

    Road The existing Great Western Highway was upgraded from

    a two lane highway to a four lane divided highway from

    west of Ridge Street, Lawson to 400 metres west of

    Genevieve Road.

    Completed

    Bulli Interchange -

    Commuter Parking

    Bulli Illawarra

    Shoalhaven

    Parking Conversion of existing staff car park to provide two extra

    commuter car parking spaces.

    Completed

    Bulli Road Toongabbie Central City Road Install pedestrian refuge island, street lighting, kerb and

    gutter works on Bulli Road, East of Bungaree Road.

    Completed

    Bulli Station Refresh Package 4a

    Bulli Central City Rail The Station Refresh Program, within the Customer Experience Improvement Programs seeks to fulfil the

    needs of the customer by investing in improvements to

    the customer facilities and amebience at stations. The

    eight elements of scope are: Bird Proofing, Cleaning,

    Painting/Painting Stripping, LED Lighting, Toilet

    refurbishments, Landscaping, Station Precient repairs

    and Kit of Parts upgrade (Seats, Bins and Bubblers)

    Completed

    Burnett Street -

    Ledger Road

    cycleway

    Merrylands Central City

    District

    Walking and Cycling Shared Path cycleway alongside Burnett Street -

    Ledger Road

    Completed

    Burnum Burnum

    Sanctuary Boat Ramp

    Upgrade, Woronora

    Woronora South Maritime Upgrade of the existing boat ramp and installation of a new pontoon adjacent to the boat ramp at Burnum

    Burnum Sanctuary, Woronora.

    Planning

  • Name Suburb Region/District Project Type Project Description Current

    Status

    Burrill Lake Bridge -

    Princes Highway

    Upgrade

    Burrill Lake Illawarra

    Shoalhaven

    Road Key features of the new bridge include a 290 metre long

    bridge spanning the lake on a new alignment to the east

    of the existing bridge; roundabouts on either side of the

    crossing to connect the A1 Princes Highway to local

    roads; a pedestrian and cycle path on the new bridge,

    connecting to new paths on both sides and linking to the

    Ulladulla cycle path; pedestrian paths underneath both

    ends of the new bridge; the new bridge and highway

    would be higher than the future 1 in 100 year flood level

    and reduce the impact of flooding; complete removal of

    the existing causeway and bridge; and a southern

    foreshore park on the existing bridge approach.

    In-Progress

    Burwood Station Refresh Package 1

    Burwood Central Coast Rail The Station Refresh Program, within the Customer Experience Improvement Programs seeks to fulfil the

    needs of the customer by investing in improvements to

    the customer facilities and amebience at stations. The

    eight elements of scope are: Bird Proofing, Cleaning,

    Painting/Painting Stripping, LED Lighting, Toilet

    refurbishments, Landscaping, Station Precient repairs

    and Kit of Parts upgrade (Seats, Bins and Bubblers)

    Completed

    Bus Priority

    Infrastructure Program

    Parramatta Central City

    District

    Bus Projects are being delivered along Sydney's most

    important bus routes that make bus services faster and

    more reliable. Measures include red bus lanes, bus

    priority at traffic lights, changed parking restrictions and

    clearways, and relocating bus stops.

    In-Progress

    Cabarita Wharf -

    Wharf Upgrade

    Program

    Cabarita Eastern City

    District

    Maritime The wharf upgrade will provide improved customer

    amenity such as better protection from the wind, rain and

    sun, seating and waiting areas; improved safety for

    customers; improved access for mobility impaired

    customers and customers with prams; quicker and more

    efficient boarding and disembarking; increased wharf

    capacity for future growth of ferry services; more

    efficient interchanges with other modes of transport, both

    public and private; and better way finding signage.

    Planning

  • Name Suburb Region/District Project Type Project Description Current

    Status

    Cabramatta

    Interchange -

    Commuter Parking

    Cabramatta Western City

    District

    Parking Conversion of existing staff car park to provide seven

    extra commuter car parking spaces.

    Completed

    Camden Haven River

    Recreational Boating

    Facilities Study

    (Investigation)

    Dunbogan North Coast Maritime Funding to undertake a review of existing Council managed boating facilities on the Camden Haven River.

    The study is to include a condition assessment of

    recreational boating infrastructure; community

    consultation on existing facilities; review of population

    and boating demand forecasts and identification of future

    site upgrades and site redundancies.

    Planning

    Camden Street

    cycleway

    Wilton Western City

    District

    Walking and Cycling Shared Path cycleway alongside Camden Street Completed

    Camden Valley Way

    Upgrade

    Leppington Western City

    District

    Road Camden Valley Way was upgraded between Oran Park

    Drive and Bringelly Road. The key features of the

    project included two lanes upgraded to a four lane

    divided road; a posted vehicle speed limit of 80 km/h; a

    three metre wide, off-road shared pedestrian/cyclist path

    on the western side of the road; traffic lights at Forest

    Lawn Memorial Gardens Cemetery, Cowpasture Road

    South, Heath Road, St Andrews Road, Raby Road,

    Catherine Field Road and Springfield Road; the

    realignment of Denham Court Road and Ingleburn Road

    to a four-way intersection with traffic lights; temporary

    u-turn facilities located opposite traffic lights at the

    intersections of Forest Lawn Memorial Gardens

    Cemetery and St Andrews Road; new bridges; and bus

    priority capability at traffic lights and indented bus bays

    on each side of Camden Valley Way.

    Completed

    Campbelltown

    Interchange -

    Commuter Parking

    Campbelltown Western City

    District

    Parking Conversion of existing staff car park to provide 154 extra

    commuter car parking spaces.

    Completed

    Campbelltown

    Interchange -

    Commuter Parking

    Campbelltown Western City

    District

    Parking Car park with an extra 450 parking spaces. In-Progress

  • Name Suburb Region/District Project Type Project Description Current

    Status

    Campbelltown Road,

    Camden Valley Way to

    Denham Court Road

    Edmondson Park Western City

    District

    Road Planning and designing is underway for a proposed

    upgrade of Campbelltown Road between Hume Highway

    / Camden Valley Way, Casula and Brooks Road,

    Denham Court. Key features of the proposed upgrade

    include an upgrade from a generally two lane to a four

    lane divided road with a central median; a wide central

    median which will allow room for widening to six lanes,

    if required in the future, between The Hume Motorway

    overbridge and Zouch Road; new signalised

    intersections; an off-road shared pedestrian/cyclist path

    generally on the western side of Campbelltown Road;

    designated turning lanes and bicycle and pedestrian

    crossing provisions at traffic lights; and an additional

    bridge over the M31 Hume Motorway to allow for the

    widening of Campbelltown Road. The construction

    phase of the project will be undertaking in stages. The

    first stage will be approximately 1.2 kilometre section

    between from East Town Road Centre and to New

    Macdonald Road.

    Planning

    Campsie Interchange -

    Commuter Parking

    Campsie South District Parking Conversion of existing staff car park to provide two extra

    commuter car parking spaces.

    Completed

    Campsie Interchange -

    Transport Access

    Program Upgrade

    Campsie South District Interchange Improvements to the transport interchange facilities at

    Campsie Station included seating at the eastbound bus

    stops on South Parade; improving bus stops on South

    Parade for customer safety and comfort; improving

    footpath pavements on route to and at the three on-street

    commuter car parks; installing clear and direct way-

    finding signage; and installing disabled car parking

    spaces on North Parade, including lighting upgrades.

    Completed

    Canal Street

    cycleway

    Leeton Riverina - Murray Walking and Cycling Shared Path cycleway alongside Canal Street Completed

  • Name Suburb Region/District Project Type Project Description Current

    Status

    Canberra Station Refresh Package 1a

    Kingston ACT Illawarra Shoalhaven

    Rail The Station Refresh Program, within the Customer

    Experience Improvement Programs seeks to fulfil the

    needs of the customer by investing in improvements to

    the customer facilities and amebience at stations. The

    eight elements of scope are: Bird Proofing, Cleaning,

    Painting/Painting Stripping, LED Lighting, Toilet

    refurbishments, Landscaping, Station Precient repairs

    and Kit of Parts upgrade (Seats, Bins and Bubblers)

    Completed

    Canley Vale

    Interchange -

    Commuter Parking

    Canley Vale Western City

    District

    Parking New multi-storey commuter car park providing 122

    commuter car parking spaces including a lift, stairs,

    lighting and CCTV cameras.

    Completed

    Canley Vale

    Interchange -

    Commuter Parking

    Canley Vale Western City

    District

    Parking Conversion of existing staff car park to provide two extra

    commuter car parking spaces.

    Completed

    Canley Vale

    Interchange - Transport

    Access Program

    Upgrade

    Canley Vale Western City

    District

    Interchange Improvements to accessibility at Canley Vale Station

    included the construction of new accessible ramps on

    both sides of the station, new stairs and bike racks on

    both sides of the station, and improved safety through

    additional CCTV surveillance cameras and lighting, new

    tactiles on the platform, new handrails and signage.

    Completed

    Canley Vale Road Canley Heights Western City Road Upgrade existing raised pedestrian crossing west of

    Ascot Street, Canley Heights to improve its accessibility

    and safety of pedestrians. The works will ensure a flat

    transition between footpath and the raised platform and

    relocate the drainage lintel and

    Not Started

    Canley Vale Road

    cycleway

    Canley Heights Western City

    District

    Walking and Cycling Shared Path cycleway alongside Canley Vale Road Completed

    Canley Vale Station Refresh Package 4

    Canley Vale Western City Rail The Station Refresh Program, within the Customer Experience Improvement Programs seeks to fulfil the

    needs of the customer by investing in improvements to

    the customer facilities and amebience at stations. The

    eight elements of scope are: Bird Proofing, Cleaning,

    Painting/Painting Stripping, LED Lighting, Toilet

    refurbishments, Landscaping, Station Precient repairs

    and Kit of Parts upgrade (Seats, Bins and Bubblers)

    Completed

  • Name Suburb Region/District Project Type Project Description Current

    Status

    Captain Cook Bridge

    South Boating Access

    Improvements

    (Investigation), Taren

    Point

    Taren Point South Maritime Passive craft launching facility including a jetty for both passive craft and small vessel access. Upgrade to

    foreshore and provision of a seating area and kayak

    assembly point.

    Planning

    Captain Cook Park

    Boating Facilities

    Improvements

    (Investigation), Ballina

    Ballina North Coast Maritime Investigation into the installation of a new pontoon at Captain Cook Park for short term boat mooring and

    passenger exchange.

    Planning

    Cargo Movement

    Coordination Centre

    Botany Bay Eastern City

    District

    Rail The NSW Cargo Movement Coordination Centre is

    working with industry to optimise how cargo moves

    through Port Botany, Port Kembla and regional NSW

    across supply chain interfaces and networks. It aims to

    better coordinate the activities of operators across the

    landside cargo transport chain – including stevedores,

    road and rail freight operators, network operators and

    terminals – to create a more efficient, higher performing

    freight network which maximises existing capacity. The

    centre is focused on the state-wide freight network; bulk

    commodities (such as grain and coal) as well as

    container freight; and key supply chain interfaces (ports,

    road, rail and intermodal terminals). It will help towards

    the target of doubling rail’s mode share of container

    movements through NSW ports by 2020.

    In-Progress

    Caringbah Interchange

    - Transport Access

    Program Upgrade

    Caringbah South District Interchange New steel canopies were installed on the station platform

    to provide better protection for customers against rain

    and sun exposure.

    Completed

    Caringbah Station Refresh Package 1

    Caringbah Central Coast Rail The Station Refresh Program, within the Customer Experience Improvement Programs seeks to fulfil the

    needs of the customer by investing in improvements to

    the customer facilities and amebience at stations. The

    eight elements of scope are: Bird Proofing, Cleaning,

    Painting/Painting Stripping, LED Lighting, Toilet

    refurbishments, Landscaping, Station Precient repairs

    and Kit of Parts upgrade (Seats, Bins and Bubblers)

    Completed

  • Name Suburb Region/District Project Type Project Description Current

    Status

    Carlingford

    Interchange -

    Commuter Parking

    Carlingford Central City

    District

    Parking Commuter car park providing up to 150 new spaces. Planning

    Caroline Chisholm

    Drive

    Winston Hills Central City Road Install a refuge island in Caroline Chisolm Drive west of

    Hilcrest Avenue, Winston Hills. The proposed works

    includes conversion of an existing traffic island to a

    refuge island, with upgrades of existing kerb ramps and

    street lighting infrastructure.

    Completed

    Carramar Station Refresh Package 1

    Carramar Central Coast Rail The Station Refresh Program, within the Customer Experience Improvement Programs seeks to fulfil the

    needs of the customer by investing in improvements to

    the customer facilities and amebience at stations. The

    eight elements of scope are: Bird Proofing, Cleaning,

    Painting/Painting Stripping, LED Lighting, Toilet

    refurbishments, Landscaping, Station Precient repairs

    and Kit of Parts upgrade (Seats, Bins and Bubblers)

    Completed

    Carrington Boat Ramp

    Facility Improvements

    (Investigation)

    Carrington Hunter Maritime Planning

    Carrington Road

    cycleway

    Marrickville Eastern City

    District

    Walking and Cycling Bicycle Path cycleway alongside Carrington Road Completed

    Cary Street Toronto Hunter Road Install pedestrian fencing Design Only

    Completed

    Casino Interchange -

    Transport Access

    Program Upgrade

    Casino North Coast Interchange Construction of a new taxi rank and relocation of

    existing car parking spaces.

    Completed

    Casino Station Refresh Package 2a

    Casino Eastern City Rail The Station Refresh Program, within the Customer Experience Improvement Programs seeks to fulfil the

    needs of the customer by investing in improvements to

    the customer facilities and amebience at stations. The

    eight elements of scope are: Bird Proofing, Cleaning,

    Painting/Painting Stripping, LED Lighting, Toilet

    refurbishments, Landscaping, Station Precient repairs

    and Kit of Parts upgrade (Seats, Bins and Bubblers)

    Completed

  • Name Suburb Region/District Project Type Project Description Current

    Status

    Castle Hill -

    Showground Road

    Upgrade

    Castle Hill Central City

    District

    Road Showground Road is being upgraded between Carrington

    Road and Old Northern Road, Castle Hill from a two

    lane to a four lane divided road to reduce congestion and

    increase traffic capacity to meet predicted growth from

    development in the area. Key features include widening

    of Showground Road to at least four lanes between

    Carrington Road and Old Northern Road with additional

    turning lanes at key intersections; upgrading the

    intersection of Showground Road and Pennant Street to

    include additional turning lanes and a bus priority

    measure; installing new traffic lights at the intersections

    of Showground Road with Rowallan Avenue and

    Cheriton Avenue; changing the intersection of

    Showground Road and Britannia Road to left-in/left-out

    access; installing a central concrete median with

    landscaped planter bays at a number of locations along

    the road; and providing a concrete footpath to both sides

    of the road between Carrington Road and Pennant Street.

    In-Progress

    Cattai Ridge Road Glenorie Central City Road Install roadside w-beam barrier and and CAMS Completed

  • Name Suburb Region/District Project Type Project Description Current

    Status

    CBD and South East

    Light Rail

    Moore Park Eastern City

    District

    Light Rail The CBD and South East Light Rail is a new light rail

    network for Sydney, currently under construction. The

    12 kilometre route will feature 19 stops, extending from

    Circular Quay along George Street to Central Station,

    through Surry Hills to Moore Park, then to Kensington

    and Kingsford via Anzac Parade, and Randwick via

    Alison Road and High Street. Key features include high

    frequency ‘turn up and go’ light rail services operating

    every four minutes in the peak in the CBD, and every

    eight minutes in the peak from Moore Park to Randwick

    and Kensington; reliable and high-capacity services;

    additional special event services between Central and the

    Moore Park and Alison Road stops; a one-kilometre

    pedestrian zone along George Street, between Hunter

    and Bathurst Streets; and a fleet of electric-powered light

    rail vehicles with air conditioning and accessible low-

    floor design.

    In-Progress

    Centennial Park

    cycleway

    Woollahra Eastern City

    District

    Walking and Cycling Shared Path cycleway alongside Centennial Park Completed

    Central Coast

    Highway, Brisbane

    Water Drive, Manns

    Road Intersection

    Upgrade

    West Gosford Central Coast Road The upgrade provides a range of benefits for businesses,

    motorists and the community, including: the newly

    aligned intersection at Brisbane Water Drive and Manns

    Road will substantially improve traffic flow and improve

    access to local businesses; the Central Coast Highway

    westbound exit ramp onto the newly constructed Grieve

    Close underpass will provide improved access to local

    businesses; the traffic lights at Manns Road and Grieve

    Close intersection will provide access into Grieve Close

    and the link road connecting to Dyer Crescent; improved

    access to new developments including the Riverside

    Park; urban design improvements will improve the visual

    appeal and amenity in the commercial area; and shared

    pedestrian and cycle paths along the Central Coast

    Highway, Manns Road and Brisbane Water Drive will

    improve connectivity to existing paths.

    Completed

  • Name Suburb Region/District Project Type Project Description Current

    Status

    Central Coast

    Highway, Carlton Road

    to Ocean View Drive

    Erina Heights Central Coast Road The upgrade of the Central Coast Highway between

    Carlton Road, Erina Heights and Ocean View Drive,

    Wamberal involved widening to two lanes in each

    direction. The project improves safety for motorists,

    cyclists and pedestrians; increases capacity to improve

    traffic flow and reduce travel times and congestion;

    improves access for public transport; and formalises

    parking arrangements.

    Completed

    Central Coast

    Highway, Frederick

    Street Intersection

    Upgrade

    East Gosford Central Coast Road The upgrade involved road widening to provide a

    dedicated right turn lane eastbound on the Central Coast

    Highway (York Street) into Frederick Street (south) to

    reduce queues during peak periods; extensions of the

    shared pedestrian/cycle paths and pedestrian facilities on

    the southern side of the intersection to Albany Street;

    adjustments to traffic light phasing to allow extra time

    for pedestrians to cross before traffic proceeds; and

    stormwater drainage improvements and utility

    relocations.

    Completed

    Central Coast

    Highway, Racecourse

    Road Intersection

    Upgrade

    West Gosford Central Coast Road The upgrade includes the following improvements:

    providing a left turn lane with traffic light control on the

    Central Coast Highway (eastbound) for vehicles turning

    on to Racecourse Road. This will allow for an additional

    through lane for motorists travelling east on the highway;

    providing a left turn lane with traffic light control on

    Racecourse Road (southbound) for vehicles turning onto

    the Central Coast Highway. This will separate left

    turning traffic from through and right turning traffic to

    provide extra capacity for this leg of the intersection;

    providing a new pedestrian crossing on the western leg

    of the Central Coast Highway and installing pedestrian

    traffic lights within the median on Racecourse Road

    (southbound); and providing a 2.5 metre wide shared

    path along the northern side of the Central Coast

    Highway and extending along Racecourse Road to allow

    cyclists and pedestrians to safety cross the road.

    In-Progress

  • Name Suburb Region/District Project Type Project Description Current

    Status

    Central Coast

    Highway, Wisemans

    Ferry Road Intersection

    Upgrade

    Somersby Central Coast Road Key features of the upgrade include lengthening the

    existing right turn lane and providing a second right turn

    lane from the Central Coast Highway (from Gosford)

    into Wisemans Ferry Road, to reduce queuing and

    improve safety; providing an additional left turn lane

    with both lanes under traffic light control from

    Wisemans Ferry Road into the Central Coast Highway

    (to Gosford), to improve safety by removing the need to

    merge; providing a continuous lane on Wisemans Ferry

    Road for southbound vehicles exiting the M1 Pacific

    Motorway heading towards the Central Coast Highway

    to improve safety by removing the need to merge;

    providing a new right turn lane from Wisemans Ferry

    Road onto the northbound on-ramp of the M1 Pacific

    Motorway to improve safety by separating traffic

    movements; providing a new car pool car park with

    approximately 100 parking spaces; and providing an off

    road cycle path between Wisemans Ferry Road and

    Kangoo Road.

    Completed

    Central Interchange -

    Transport Access

    Program Upgrade

    Haymarket Eastern City

    District

    Interchange Installation of lifts and construction of accessible ramps. Completed

    Cessnock Road Weston Hunter Road Install raised island with additional give way sign and

    move give way line forward using kerb extensions

    Completed

  • Name Suburb Region/District Project Type Project Description Current

    Status

    Charles Kay Drive and

    Brunswick Road Safety

    Improvements

    Terrigal Central Coast Road The Terrigal Drive intersections at Charles Kay Drive

    and Brunswick Road were improved to improve safety

    and traffic flow along Terrigal Drive. Key features of the

    upgrade include new traffic lights at the Charles Kay

    Drive and Brunswick Road intersections; widening

    Terrigal Drive between Duffys Road and Charles Kay

    Drive to provide two through lanes in each direction and

    additional left and right turn lanes out of Charles Kay

    Drive; providing a shared pedestrian and cycle path on

    the southern side of Terrigal Drive between Duffys Road

    and Bellbird Avenue; and providing pedestrian traffic

    lights east of Duffys Road to improve safety for

    pedestrians crossing Terrigal Drive.

    Completed

    Charleyong Bridge

    Replacement - Bridges

    for the bush - Tranche

    2

    Tomboye South East and Tablelands

    Road The Charleyong Bridge is a single-span Allen truss

    timber bridge built in 1901, which crosses the

    Mongarlowe River at Marlowe. The bridge is located

    on Main Road 92 connecting Braidwood and Nowra via

    Nerriga, which is a regionally important link for goods,

    quarried material and stock between Nowra, Braidwood

    and Canberra. The bridge is proposed to be replaced as

    it does not meet current loading standards and has

    become increasingly expensive to maintain.

    Replacement of the bridge would greatly improve

    regional and local freight route continuity and allow

    Higher Mass Limit Vehicles to use the road.

    Planning

    Chatham Road Eastwood North Road Install high friction surface, CAMs and RRPMs Completed

    Chester Hill Station Refresh Package 1

    Chester Hill Central Coast Rail The Station Refresh Program, within the Customer Experience Improvement Programs seeks to fulfil the

    needs of the customer by investing in improvements to

    the customer facilities and amebience at stations. The

    eight elements of scope are: Bird Proofing, Cleaning,

    Painting/Painting Stripping, LED Lighting, Toilet

    refurbishments, Landscaping, Station Precient repairs

    and Kit of Parts upgrade (Seats, Bins and Bubblers)

    Completed

  • Name Suburb Region/District Project Type Project Description Current

    Status

    Chiswick Wharf -

    Wharf Upgrade

    Program

    Chiswick Eastern City

    District

    Maritime The wharf upgrade will provide improved customer

    amenity such as better protection from the wind, rain and

    sun, seating and waiting areas; improved safety for

    customers; improved access for mobility impaired

    customers and customers with prams; quicker and more

    efficient boarding and disembarking; increased wharf

    capacity for future growth of ferry services; more