Progress Since 2012 Name Suburb Region/District Project Type Project Description Current
Status
2nd Bulk Liquids Berth Port Botany Eastern City
District
Freight Planning approval to develop a second Bulk Liquids
Berth (BLB2) at Port Botany was received in 2008. On
31 May 2011, John Holland Pty Ltd was engaged to
construct the BLB2. The berth became operational in
December 2013. The main products handled at the BLB
are refined fuels, gases and chemicals / other bulk
liquids. BLB2 comprise a steel piled pier adjacent to the
existing BLB1; associated infrastructure such as marine
loading arms, fire fighting equipment, onshore support
facilities and pipelines from existing user sites to the new
berth. The open access, multi user berth operates on a 24
hour/ 7 day per week basis. BLB2 has been designed to
accommodate 120,000 dead weight tonne vessels to a
maximum of 270m length overall.
Completed
Abbotsford Wharf -
Wharf Upgrade
program
Abbotsford Eastern City
District
Maritime The upgrade aims to provide easier access to the wharf,
better weather protection, additional seating, improved
safety, quicker and more efficient boarding and
disembarking, increased capacity and more efficient
interchange with other modes of transport.
Planning
Acacia Avenue
cycleway
Lake Munmorah Central Coast Walking and Cycling Shared Path cycleway alongside Acacia Avenue Completed
-
Name Suburb Region/District Project Type Project Description Current
Status
Additional Boating
Access Points at
Middle Harbour
(Investigation),
Willoughby
Castle Cove North Maritime Planning
Additional Boating
Access Points on the
Nepean River
(Investigation)
Penrith West Maritime Investigation and concept designs for eight passive craft access points to the Neapean River.
Planning
Airds Road cycleway Leumeah Western City
District
Walking and Cycling Shared Path cycleway alongside Airds Road Completed
Airport East Precinct Mascot Eastern City
District
Road Roads east of the airport will be upgraded and the
General Holmes Drive rail level crossing will be
removed by constructing a road underpass. This would
improve the movement of rail freight facilities to and
from Port Botany, and improve traffic flow and access to
the airport and Port Botany. Key features and benefits of
the project are replacing the General Holmes Drive rail
level crossing with a road underpass that links General
Holmes Drive, Botany Road and Wentworth Avenue to
improve the movement of rail freight and improve access
to the Airport, Mascot and the eastern suburbs; providing
improvements to the Mill Pond Road intersections with
General Holmes Drive and Botany Road to support
future growth and access to the airport; widening Joyce
Drive and General Holmes Drive between O'Riordan
Street and Mill Pond Road to three lanes in each
direction to improve traffic flow around the airport and
to Port Botany; creating a new shared path to link to the
existing cycle way on Wentworth Avenue to improve
connections for pedestrians and cyclists; and retaining
the northbound bus stop on Botany Road close to the
existing location to meet community needs.
In-Progress
-
Name Suburb Region/District Project Type Project Description Current
Status
Airport North Precinct Mascot Eastern City
District
Road Roads north of Sydney Airport are being upgraded to
improve traffic flow and connections to the airport and
Port Botany. Key features of the upgrade include
converting the southern sections of Robey Street and
O’Riordan Street into one-way roads; widening
O’Riordan Street to provide six through lanes between
Bourke Road and Robey Street; reconfiguring the
existing traffic lights on O’Riordan Street between
Qantas Drive and Bourke Road; and upgrading the
footpath on the eastern side of O’Riordan Street. The
upgrades will help increase traffic capacity and reduce
congestion along O’Riordan Street, and improve access
to Sydney Airport domestic terminals.
Planning
Airport Street
cycleway
Temora Riverina - Murray Walking and Cycling Road Shoulder cycleway alongside Airport Street Completed
Airport West Precinct Arncliffe Eastern City
District
Road Marsh Street, Arncliffe is being widened to three lanes
westbound to relieve congestion and improve traffic
flow. The project supports and complements upgrades to
Sydney Airport’s internal road network. Key features
include widening Marsh Street to three lanes westbound
between the Giovanni Brunetti Bridge and the M5
interchange, meaning Marsh Street would be three lanes
in both directions; providing a dedicated cycleway on the
southern side of Marsh Street to connect the existing
path on the bridge to the Eve Street cycleway; providing
a pedestrian crossing at the intersection of Marsh Street
and Flora Street; and minor widening of the existing
eastbound and westbound lanes to provide wider, safer
lanes for motorists. Key benefits include increasing
traffic capacity and reduce congestion on Marsh Street
for westbound traffic; improving cycle access in the area
and increase safety for cyclists; and improving
pedestrian access in the area.
In-Progress
-
Name Suburb Region/District Project Type Project Description Current
Status
Albert Street
cycleway
Moruya South East &
Tablelands
Walking and Cycling Shared Path cycleway alongside Albert Street Completed
Albion Park
Interchange -
Commuter Parking
Albion Park Rail Illawarra
Shoalhaven
Parking Conversion of an existing staff car park to provide two
extra commuter car parking spaces.
Completed
Albion Park
Interchange - Transport
Access Program
Upgrade
Albion Park Rail Illawarra
Shoalhaven
Interchange Improvements to the transport interchange facilities and
access at Albion Park Station included redesigning and
regrading of the ramp on the western side of the station
to make it wheelchair compliant; improving pedestrian
access to the western side bus stop on the Princes
Highway; providing a more user friendly bicycle parking
facility; and providing a formalised ‘kiss and ride’ area
for passenger pick up and drop off.
Completed
Albion Park Rail
Bypass - Princes
Highway Upgrade
Albion Park Illawarra
Shoalhaven
Road Planning is underway for a future extension of the M1
Princes Motorway between Yallah and Oak Flats to
provide a bypass of Albion Park Rail. The bypass will
complete the 'missing link' for a high standard road
between Sydney and Bomaderry.
Planning
Albion Park Station Refresh Package 3a
Albion Park Rail North Rail The Station Refresh Program, within the Customer Experience Improvement Programs seeks to fulfil the
needs of the customer by investing in improvements to
the customer facilities and amebience at stations. The
eight elements of scope are: Bird Proofing, Cleaning,
Painting/Painting Stripping, LED Lighting, Toilet
refurbishments, Landscaping, Station Precient repairs
and Kit of Parts upgrade (Seats, Bins and Bubblers)
Completed
Albury Station Refresh Package 4a
Albury Central City Rail The Station Refresh Program, within the Customer Experience Improvement Programs seeks to fulfil the
needs of the customer by investing in improvements to
the customer facilities and amebience at stations. The
eight elements of scope are: Bird Proofing, Cleaning,
Painting/Painting Stripping, LED Lighting, Toilet
refurbishments, Landscaping, Station Precient repairs
and Kit of Parts upgrade (Seats, Bins and Bubblers)
Completed
-
Name Suburb Region/District Project Type Project Description Current
Status
Alfords Point Road
Upgrade
Alfords Point South District Road Alfords Point Road will be widened between the
Georges River and Brushwood Drive. The upgrade will
reduce congestion, improve travel times and improve
road safety. The upgrade will also provide improvements
to the local road network.
In-Progress
Alice Street Harris Park Central City Road Install pedestrian fence and kerb ramp/footpath works in
Alice Street east of Good Street, Harris Park. Includes
construction of pedestrian fence on both sides of Alice
Street east of the existing pedestrian crossing and also to
upgrade footpath/kerb ram
Completed
Allambie Road
cycleway
Allambie
Heights
North District Walking and Cycling Road Shoulder cycleway alongside Allambie Road Completed
Allandale Road Cessnock Hunter Road Install traffic signals at McGrane St, and left in left out
on eastern leg of Jurd St
Not Started
Allawah Interchange -
Transport Access
Program Upgrade
Hurstville South District Interchange The transport interchange facilities at Allawah have been
upgraded to make it easier for commuters to access the
station by different transport modes. The upgrade
included changes to bus stops, footpaths and ramps, a
new 'kiss and ride' pedestrian drop-off zone, bicycle
racks, shelters, fencing, guides for the visually impaired
and signage on both sides of the station to improve
accessibility.
Completed
Allworth Boat Ramp
Improvements (Car
Park and Lighting)
Allworth Hunter Maritime Works include the installation of a new toilet, improve lighting and investigating the removal of Allworth
Swimming baths.
Planning
Alpine Way Khancoban Riverina Murray Road VAS curve warning signs Completed
Alpine Way Geehi Riverina Murray Road VAS curve warning signs Completed
Angels Beach Drive East Ballina North Coast Road Install roundabout and provide superelevation, RRPMs
and curve advisory signs
Completed
-
Name Suburb Region/District Project Type Project Description Current
Status
Anzac Park Boating
Access Improvements
(Dinghy Storage and
Launching Facility),
Tea Gardens
Tea Gardens Hunter Maritime Installation of new dinghy launching and storage facilities within Anzac Park.
Planning
Apex Park Boat Ramp
& Car Park Upgrade,
Wagga Wagga (Lake
Albert)
Lake Albert Riverina Murray Maritime Upgrade of the Apex Park boat ramp facility at Lake Albert. Works include: Widening the existing boat ramp
to 8m and installation of lane dividers to make it a two
lane ramp; expansion and redevelopment of the existing
car park to increase car/trailer parking capacity
(resealing, linemarking, signage, solar lighting); and
improvements to the lake foreshore including
stabilisation of 215m of the foreshore using Elcorock
sand bags (to replace failed retaining walls), installation
of boat tie up points and installation of rubbish stations.
Planning
Apex Park Boat Ramp
Facility Upgrade, Lake
Hume
Lake Hume
Village
Riverina Murray Maritime Upgrade of the Apex Park boat ramp facility. The project will be staged with Stage 1 to involve the development
of a Master Plan for the site and Stage 2 to comprise
construction of identified infrastructure priorities.
Planning
Apex Park Boat Ramp
Upgrade, Narooma North Narooma South East and
Tablelands
Maritime Additional Funding for the upgrade of the boat ramp
facility at Apex Park, Narooma. Works include:
construction of a new two lane concrete boat ramp,
construction of a new modular centre ramp pontoon,
refurbishment of the existing jetty.
Completed
Appin Road Cataract Illawarra
Shoalhaven
Road Realign curve from between 200-600 to between 600-
1000m, provide appropriate super elevation, install wire
rope barrier on roadside from no barrier and widen
shoulder to 2.5m outside curve and 1m inside curve
Completed
-
Name Suburb Region/District Project Type Project Description Current
Status
Armidale Interchange -
Transport Access
Program Upgrade
Armidale New England North
West
Interchange Interchange upgrade at Armidale railway station and
coach depot. The upgrade at the railway station included
resurfacing of the car park, nine extra commuter car
parking spaces including one accessible parking space,
improving footpaths, installing new signage and bicycle
parking facilities, as well as upgrades to lighting. The
upgrade at the Visitor Information Centre coach
interchange included a new bus shelter, lighting, CCTV
surveillance cameras and accessibility upgrades to the
existing rest rooms. The new shelter will keep
passengers out of the elements while waiting for coaches
and disembarking.
Completed
Armidale Regional Council Truck Wash Capacity Upgrade
Armidale New England
North West
Freight Install dedicated 50mm mains water service with associated meter and backflow device to truck wash.Install a new pressure pump for Bay 2 (currently unequipped) and upgrade current pressure pump on Bay 1 (pump is 10+ years old)Install two 22,700 litre poly tanks for pump draw off reservoir.Upgrade AvData controller to service additional wash bay.Install colour bond fencing to separate the two wash bays.
Planning
Armidale Road Nymboida North Coast Road Improve vertical alignment, superelevation, horizontal
alignment and install shoulders, CAMs and guideposts
Completed
Arncliffe Interchange -
Commuter Parking
Arncliffe Eastern City
District
Parking Conversion of existing staff car park to provide two extra
commuter car parking spaces.
Completed
-
Name Suburb Region/District Project Type Project Description Current
Status
Arncliffe Interchange -
Transport Access
Program Upgrade
Arncliffe Eastern City
District
Interchange Arncliffe Station is now accessible for all customers with
four new lifts connecting the concourse, platform and
street levels. The lifts will make commuting easier for
our customers, especially those with a disability, the
elderly, parents with prams and travellers with luggage.
Key features of the upgrade include four new lifts; new
canopies on the footbridge and platforms; upgraded
CCTV surveillance cameras and announcement systems;
new sheltered bus stops, taxi rank and kiss and ride area
along Firth Street; new family accessible toilets at the
platform level; two new accessible parking spaces within
the existing car park off Burrows Street; upgraded stairs
and wayfinding signage; and new bicycle racks.
Completed
Artarmon Interchange -
Transport Access
Program Upgrade
Artarmon North District Interchange Improvements to the accessibility at Artarmon Station
included two new lifts, a new pedestrian bridge to
improve access from Hampden Road and a new
accessible parking space on Hampden Road.
Completed
Artarmon Station Refresh Package 2
Artarmon Hunter Rail The Station Refresh Program, within the Customer Experience Improvement Programs seeks to fulfil the
needs of the customer by investing in improvements to
the customer facilities and amebience at stations. The
eight elements of scope are: Bird Proofing, Cleaning,
Painting/Painting Stripping, LED Lighting, Toilet
refurbishments, Landscaping, Station Precient repairs
and Kit of Parts upgrade (Seats, Bins and Bubblers)
Completed
Ashfield Interchange -
Commuter Parking
Ashfield Eastern City
District
Parking Conversion of existing staff car park to provide three
extra commuter car parking spaces.
Completed
Ashfield Interchange -
Commuter Parking
Ashfield Eastern City
District
Parking A new multi-storey car park on Brown Street will
include 120 new commuter spaces, fencing, lighting and
CCTV to boost access and security.
In-Progress
-
Name Suburb Region/District Project Type Project Description Current
Status
Ashfield Station Refresh Package 2
Ashfield Hunter Rail The Station Refresh Program, within the Customer Experience Improvement Programs seeks to fulfil the
needs of the customer by investing in improvements to
the customer facilities and amebience at stations. The
eight elements of scope are: Bird Proofing, Cleaning,
Painting/Painting Stripping, LED Lighting, Toilet
refurbishments, Landscaping, Station Precient repairs
and Kit of Parts upgrade (Seats, Bins and Bubblers)
Completed
Asquith Interchange -
Commuter Parking
Asquith North District Parking The project includes constructing a 42 space commuter
car park on Jersey Street North; two accessible parking
spaces close to the station (within the Haldane Street car
park); a pedestrian link from the car park to the station;
and improved lighting and CCTV surveillance.
In-Progress
Asquith Station Refresh Package 1
Asquith South East and Tablelands
Rail The Station Refresh Program, within the Customer
Experience Improvement Programs seeks to fulfil the
needs of the customer by investing in improvements to
the customer facilities and amebience at stations. The
eight elements of scope are: Bird Proofing, Cleaning,
Painting/Painting Stripping, LED Lighting, Toilet
refurbishments, Landscaping, Station Precient repairs
and Kit of Parts upgrade (Seats, Bins and Bubblers)
Completed
Auburn Interchange -
Transport Access
Program Upgrade
Auburn Central City
District
Interchange Improvements to the transport interchange facilities at
Auburn Station included upgrading the Northumberland
Road ‘kiss and ride’ facility to incorporate seating and
signage; removing the existing stairs that lead to the
ramp at the Railway Station entrance and exit at South
Parade; and installing a new weather wall at the South
Parade bus stop.
Completed
Austinmer Interchange
- Commuter Parking
Austinmer Illawarra
Shoalhaven
Parking Conversion of existing staff car park to provide two extra
commuter car parking spaces.
Completed
Austinmer Interchange
- Transport Access
Program Upgrade
Austinmer Illawarra
Shoalhaven
Interchange Improvements to Austinmer Station included redesigning
and rebuilding the ramp to platform 2.
Completed
-
Name Suburb Region/District Project Type Project Description Current
Status
Automatic Train
Protection
Haymarket Eastern City
District
Rail The Automatic Train Protection (ATP) Program will see
the Sydney Trains metropolitan and NSW TrainLink
intercity rail network fitted with new equipment to
improve rail safety by monitoring a train’s speed and
position on the network and automatically intervening or
braking to ensure safe operations.
In-Progress
Back Creek Boating
Access Improvements,
South West Rocks
South West
Rocks
North Coast Maritime Planning
Backmans Swamp
Creek cycleway
Orange Central West &
Orana
Walking and Cycling Shared Path cycleway alongside Backmans Swamp
Creek
Completed
Ballina Interchange -
Transport Access
Program Upgrade
Ballina North Coast Interchange Construction of new waiting areas and installation of
additional lighting.
Completed
Ballina Road
cycleway
East Lismore North Coast Walking and Cycling Shared Path cycleway alongside Ballina Road Completed
Ballina Trawler
Harbour Development
(Investigation), Ballina
West Ballina North Coast Maritime Preparation of a development options review to determine the preferred use of the Ballina Trawler
Harbour Precinct.
Planning
Balmain East Wharf -
Wharf Upgrade
Program
Balmain East Eastern City
District
Maritime The new wharf is made up of a steel floating pontoon, a
concrete fixed entry platform and an aluminium
gangway connecting the entry platform to the pontoon.
The pontoon has a curved roof, glass panels and new
seating offering some protection from the weather and
improved amenity. The new wharf provides better
protection from the wind, rain and sun; improved safety
for customers; improved access for mobility impaired
customers and customers with prams; quicker and more
efficient boarding and disembarking; and future capacity
for two ferries to berth at the wharf at the same time.
Completed
Balmain Thames Street
Wharf - Wharf
Upgrade Program
Balmain Eastern City
District
Maritime Ferry wharf upgrade to improve the safety and amenity
for passengers and better accessibility for customers with
mobility aids.
Completed
-
Name Suburb Region/District Project Type Project Description Current
Status
Balmoral Reserve Boat
Ramp Car Park
Upgrade, Balmoral
Balmoral Hunter Maritime Upgrade of the Balmoral Reserve boat ramp car park. Works include: formalisation (sealing and line marking)
of the existing gravel car park, improvements to the boat
ramp manouevring area and formalisation of boat rigging
and wash down area.
Planning
Balranald Caravan Park
Boat Ramp Pontoon,
Balranald
Balranald Far West Maritime Installation of two 8m pontoons at the boat ramp (one either side of the ramp) and construction of two unisex
toilets on the upper level trailer parking area at the site.
Planning
Balranald Truck Wash Project
Balranald Far West Freight Extend existing concrete apron to accommodate road train configuration vehicle. Install new Avdata or similar operations system including water supply and pressure pump system. Install water treatment facility and outfall retention. Area lighting and access ladders.
Planning
Bandon Road Link Vineyard Western City
District
Road A new road corridor is planned between Richmond
Road, Marsden Park and Windsor Road, Vineyard. This
is part of the North West Growth Centre Road Network
Strategy that was confirmed by the NSW Government in
July 2015. The preferred corridor would cater for a new
four lane divided road including a central median to
allow for future widening; an off-road shared path for
pedestrians and cyclists; a new road underpass of the
Richmond railway line at Vineyard; and traffic light
intersections and a central median to improve road
safety.
Planning
Bankstown Interchange
- Commuter Parking
Bankstown South District Parking Conversion of existing staff car park to provide ten extra
commuter car parking spaces, including two accessible
parking spaces.
Completed
Bankstown Interchange
- Transport Access
Program
Bankstown South District Interchange Improvements to Bankstown Station included new stairs
and ramps to improve circulation at the northern and
southern station entrances; relocation and installation of
additional ticket barriers; installation of a covered
walkway to the bus interchange; widening the staircase
access to platform; and installation of bicycle parking
facilities.
Completed
-
Name Suburb Region/District Project Type Project Description Current
Status
Barangaroo Ferry Hub Barangaroo Eastern City
District
Maritime The Barangaroo Ferry Hub will serve Sydney’s newest
commercial district and provide increased capacity for
ferry services to meet future demand. The new ferry hub
will provide berthing space for additional ferry services
from the Parramatta River, as well as direct access to and
from the Eastern Suburbs and lower North Shore. The
new ferry hub will connect customers to the city centre
via Wynyard Walk, a high quality pedestrian link
between Barangaroo and Wynyard Station. Key features
include two new ferry wharves with a landing and ramp
to connect the floating pontoon to the land; two berthing
faces for ferries on each pontoon; new facilities for
customer safety and comfort at each wharf, including
seating, lighting, passenger information display and
weather protection; integrated electronic ticketing system
for public transport in Sydney using the Opal card; and
public amenities such as bins, ticket vending machines,
wayfinding and signage.
In-Progress
Barmedman Road
cycleway
Temora Riverina - Murray Walking and Cycling Shared Path cycleway alongside Barmedman Road Completed
Barrenjoey Road Bilgola North Road CAMs, curve advisory signs and warning signs Completed
Barrington Bridge
Replacement - Bridges
for the Bush - Tranche
2
Barrington Hunter Road The Barrington Bridge which crosses the Barrington River at Barrington, was built in 1920. The bridge is
located on Thunderbolts Way, which is an important
freight link between the Mid North Coast and the New
England Tablelands serving tourism, livestock and
timber industries. The timber truss bridge is narrow and
requires a high level of maintenance. The proposal is to
replace the bridge with a conctete structure on a new
alignment. Design is progressing.
Planning
-
Name Suburb Region/District Project Type Project Description Current
Status
Barton Highway Safety
Works
Murrumbateman South East &
Tablelands
Road A package of safety works was undertaken on the Barton
Highway. Safety works at the intersection of McIntosh
Circuit and the Barton Highway included providing
turning lanes on the Barton Highway and McIntosh
Circuit and improving lighting. Safety at the Euroka
Avenue intersection with the Barton Highway was
improved including widening the shoulder on the
northbound lane, building new designated turning lanes
into Euroka Avenue and some vegetation removal to
improve sight distance. A curve on the Barton Highway
just south of Murrumbateman Road was realigned and a
turning lane was built for vehicles turning right into
Murrumbateman Road. A one kilometre section of the
Barton Highway at Capricorn Corner was realigned
given its crash history. Construction of 4.5 kilometres of
new road at Gounyan curves was undertaken to remove
seven bends in the highway. A 1.2 kilometre southbound
overtaking lane has also been built to replace the existing
northbound overtaking lane. Other safety works being
planned along sections of the Barton Highway include
extending culverts, removing trees, flattening
embankments and installing safety barriers.
Completed
Bass Point Boat Ramp
Car Park Upgrade,
Shell Cove
Shell Cove Illawarra
Shoalhaven
Maritime Planning
Batemans Bay
Interchange - Transport
Access Program
Upgrade
Batemans Bay South East &
Tablelands
Interchange Construction of new drop off and pick up areas. Completed
Batemans Bay Sewage
Pump-out Facility North Batemans
Bay
South East and
Tablelands
Maritime Planning
Batemans Bay/Clyde
River Boating
Infrastructure Upgrades
Batemans Bay South East and
Tablelands
Maritime Planning
-
Name Suburb Region/District Project Type Project Description Current
Status
Bathurst Station Refresh Package 2a
Bathurst Eastern City Rail The Station Refresh Program, within the Customer Experience Improvement Programs seeks to fulfil the
needs of the customer by investing in improvements to
the customer facilities and amebience at stations. The
eight elements of scope are: Bird Proofing, Cleaning,
Painting/Painting Stripping, LED Lighting, Toilet
refurbishments, Landscaping, Station Precient repairs
and Kit of Parts upgrade (Seats, Bins and Bubblers)
Completed
Baulkham Hills
Interchange -
Commuter Parking
Baulkham Hills Central City
District
Parking New commuter car park at Torrs Street providing 183
commuter car parking spaces, including four accessible
parking spaces.
Completed
Baulkham Hills
Interchange - Transport
Access Program
Upgrade
Baulkham Hills Central City
District
Interchange New bus shelters have been installed on Windsor Road
and Old Northern Road, as well as improvements
delivered to lighting and footpaths. Kiss and ride
facilities are now available on Railway Street, with new
pram ramps also delivered on Olive Street.
Completed
Bayview Wharf
Upgrade & New
Pontoon, Bayview
Bayview North Maritime Upgrade of the existing Bayview wharf which is in poor condition. Works include staibilsation of the stone
groyne (that joins the wharf to the shore), and
replacement of some fender piles, decking planks, wharf
beams, and fastenings. The improvement works also
include the installation of a new pontoon to provide short
term berthings for boats.
Planning
Beauty Point Boat
Ramp Facility
Upgrade, Wallaga Lake
Wallaga Lake South East and
Tablelands
Maritime Upgrade of the Beauty Point boat ramp. Works include:
replacement of the existing gravel boat ramp with a new
concrete double ramp, enlargement and upgrade of the
existing site access road and ramp approach, enlargement
and formalisation of car/trailer parking.
Planning
Beecroft Interchange -
Commuter Parking
Beecroft North District Parking Conversion of existing staff car park to provide one extra
commuter car parking space.
Completed
-
Name Suburb Region/District Project Type Project Description Current
Status
Bega Bypass Bega South East &
Tablelands
Road The 3.5 kilometre, two lane bypass takes heavy vehicles
out of Bega CBD and improves safety. A new
roundabout south of the Bega River Bridge was also
installed and the intersection at Finucane Lane was
rebuilt to improve sight distance and road safety. The
bypass supports the region's economy by allowing the
Princes Highway between the Snowy Mountains
Highway and the Victorian border to be used by B
double heavy vehicles by providing an approved route at
Bega without sharp corners.
Completed
Belgrave Street Manly North Road Pedestrian protection at traffic lights Completed
Bellambi Interchange -
Commuter Parking
Bellambi Illawarra
Shoalhaven
Parking Conversion of existing staff car park to provide two extra
commuter car parking spaces.
Completed
Bellambi Station Refresh Package 3a
Bellambi North Rail The Station Refresh Program, within the Customer Experience Improvement Programs seeks to fulfil the
needs of the customer by investing in improvements to
the customer facilities and amebience at stations. The
eight elements of scope are: Bird Proofing, Cleaning,
Painting/Painting Stripping, LED Lighting, Toilet
refurbishments, Landscaping, Station Precient repairs
and Kit of Parts upgrade (Seats, Bins and Bubblers)
Completed
Bellevue Estate
cycleway
Mudgee Central West &
Orana
Walking and Cycling Shared Path cycleway alongside Bellevue Estate Completed
Bells Line of Road -
Castlereagh
Connection Corridor
Preservation
South Windsor Western City
District
Road Transport for NSW is investigating a suitable corridor
for the Bells Line of Road – Castlereagh Connection to
provide an alternative route across the Blue Mountains.
The investigation would identify a suitable corridor
connecting the Bells Line of Road east of Kurrajong
Heights with the Sydney Motorway Network.
In-Progress
-
Name Suburb Region/District Project Type Project Description Current
Status
Bells Line of Road
Corridor Improvement
Program
Berambing Western City
District
Road Road safety and traffic efficiency are being improved on
Bells Line of Road between Lithgow and Kurrajong
Heights by providing more overtaking lanes and wider
sealed shoulders. This includes safety improvements on
Chifley Road between Bell and Lithgow including curve
and grade improvements at Scenic Hill and a road over
rail bridge replacement at Clarence.
In-Progress
Belmore Interchange -
Commuter Parking
Belmore South District Parking Conversion of existing staff car park to provide five
extra commuter car parking spaces.
Completed
Belmore Station Refresh Package 4
Belmore Western City Rail The Station Refresh Program, within the Customer Experience Improvement Programs seeks to fulfil the
needs of the customer by investing in improvements to
the customer facilities and amebience at stations. The
eight elements of scope are: Bird Proofing, Cleaning,
Painting/Painting Stripping, LED Lighting, Toilet
refurbishments, Landscaping, Station Precient repairs
and Kit of Parts upgrade (Seats, Bins and Bubblers)
Completed
Belmore Street
cycleway
Junee Riverina - Murray Walking and Cycling Shared Path cycleway alongside Belmore Street Completed
Bemboka Bridge
Upgrade - Bridges for
the Bush - Program 1
Morans Crossing South East &
Tablelands
Road The project includes upgrades to the road approaches and
improved safety with the improvement of existing traffic
barriers to current Australian standards. Key features
include widening of the bridge and both road
approaches, specifically to allow an increase in traffic
lane width, an increase in shoulder width and provision
for cyclists on the bridge; intersection upgrade works at
Polacks Flat Road to improve sight distance to the west;
realignment of the unnamed access track intersection
immediately west of the bridge to improve sight
distances; and two permanent combined sedimentation
and accident spill basins. The upgrade improves freight
productivity by removing a significant freight bottleneck.
Completed
-
Name Suburb Region/District Project Type Project Description Current
Status
Berala Interchange -
Transport Access
Program Upgrade
Berala Central City
District
Interchange Improvements to Berala interchange include a new lift; a
new canopy; a family accessible toilet; undercover
bicycle racks; improved interchange areas, including kiss
and ride zones, two accessible parking spaces and an
upgraded bus shelter; upgrades to lighting and CCTV
surveillance; and improved wayfinding signage.
In-Progress
Berala Station Refresh Package 1
Berala South East and Tablelands
Rail The Station Refresh Program, within the Customer
Experience Improvement Programs seeks to fulfil the
needs of the customer by investing in improvements to
the customer facilities and amebience at stations. The
eight elements of scope are: Bird Proofing, Cleaning,
Painting/Painting Stripping, LED Lighting, Toilet
refurbishments, Landscaping, Station Precient repairs
and Kit of Parts upgrade (Seats, Bins and Bubblers)
Completed
Berkeley Harbour
Boating Facilities
Improvements
(Investigation), Lake
Illawarra
Berkeley Illawarra
Shoalhaven
Maritime Planning
Bernera Road
cycleway
Prestons Western City
District
Walking and Cycling Shared Path cycleway alongside Bernera Road Completed
Berowra Interchange -
Commuter Parking
Berowra North District Parking Conversion of existing staff car park to provide two extra
commuter car parking spaces.
Completed
Berry Interchange -
Commuter Parking
Berry Illawarra
Shoalhaven
Parking Conversion of existing staff car park to provide two extra
commuter car parking spaces.
Completed
Berry to Bomaderry -
Princes Highway
Upgrade
Bomaderry Illawarra
Shoalhaven
Road The upgrade will provide around 10.6 kilometres of four-
lane highway with median separation between Mullers
Lane, Berry and Cambewarra Road, Bomaderry. Once
the highway upgrade between Berry and Bomaderry is
built it will complete four lanes of divided highway
between Waterfall and Jervis Bay Road, Falls Creek.
Planning
-
Name Suburb Region/District Project Type Project Description Current
Status
Beverly Hills
Interchange - Transport
Access Program
Upgrade
Beverly Hills South District Interchange Improvements to Beverly Hills interchange include new
pick up and drop off areas, new taxi rank and bus shelter.
Completed
Beverly Hills Station Refresh Package 4
Beverly Hills Western City Rail The Station Refresh Program, within the Customer Experience Improvement Programs seeks to fulfil the
needs of the customer by investing in improvements to
the customer facilities and amebience at stations. The
eight elements of scope are: Bird Proofing, Cleaning,
Painting/Painting Stripping, LED Lighting, Toilet
refurbishments, Landscaping, Station Precient repairs
and Kit of Parts upgrade (Seats, Bins and Bubblers)
Completed
Bexley North
Interchange -
Commuter Parking
Bexley North Eastern City
District
Parking Conversion of existing staff car park to provide five
extra commuter car parking spaces
Completed
Birchgrove Wharf -
Wharf Upgrade
Program
Birchgrove Eastern City
District
Maritime The wharf upgrade will provide improved customer
amenity such as better protection from the wind, rain and
sun, seating and waiting areas; improved safety for
customers; improved access for mobility impaired
customers and customers with prams; quicker and more
efficient boarding and disembarking; increased wharf
capacity for future growth of ferry services; more
efficient interchanges with other modes of transport, both
public and private; and better way finding signage.
Planning
Black Diamond
Place cycleway
Bulli Illawarra
Shoalhaven
Walking and Cycling Shared Path cycleway alongside Black Diamond
Place
Completed
Blackheath Station Refresh Package 4a
Blackheath Central City Rail The Station Refresh Program, within the Customer Experience Improvement Programs seeks to fulfil the
needs of the customer by investing in improvements to
the customer facilities and amebience at stations. The
eight elements of scope are: Bird Proofing, Cleaning,
Painting/Painting Stripping, LED Lighting, Toilet
refurbishments, Landscaping, Station Precient repairs
and Kit of Parts upgrade (Seats, Bins and Bubblers)
Completed
-
Name Suburb Region/District Project Type Project Description Current
Status
Blacktown Interchange
- Commuter Parking
Blacktown Central City
District
Parking Conversion of existing staff car park to provide 113 extra
commuter car parking spaces.
Completed
Blacktown Interchange
- Commuter Parking
Blacktown Central City
District
Parking New multi-storey commuter car park providing 489 new
commuter car park spaces, including 15 accessible
parking spaces, eight motorcycle spaces and 40 spaces
for securing bicycles. The car park also includes lifts,
security lighting and CCTV surveillance. Parking is free
and available 24 hours, seven days a week.
Completed
Blacktown Interchange
- Transport Access
Program Upgrade
Blacktown Central City
District
Interchange Improvements to Blacktown interchange will include
extending the station concourse to allow for additional
ticket barriers and provide more space for better
passenger circulation.
In-Progress
Blacktown Road
cycleway
Blacktown Central City
District
Walking and Cycling Shared Path cycleway alongside Blacktown Road Completed
Blacktown Station Refresh Package 1
Blacktown Central Coast Rail The Station Refresh Program, within the Customer Experience Improvement Programs seeks to fulfil the
needs of the customer by investing in improvements to
the customer facilities and amebience at stations. The
eight elements of scope are: Bird Proofing, Cleaning,
Painting/Painting Stripping, LED Lighting, Toilet
refurbishments, Landscaping, Station Precient repairs
and Kit of Parts upgrade (Seats, Bins and Bubblers)
Completed
Blaxcell Street Granville Central City Road The proposal is to raise the existing pedestrian crossing
on Blaxcell Street, immediately north of Thomas Street,
Granville. The project will include construction of a
wombat crossing with associated signs and line
markings, and realignment of the existi
Completed
Blaxland Interchange -
Commuter Parking
Blaxland Western City
District
Parking Conversion of existing staff car park to provide three
extra commuter car parking spaces.
Completed
Blaxland Interchange -
Transport Access
Program Upgrade
Blaxland Western City
District
Interchange New steel canopies were installed on the station platform
to provide better protection for customers against rain
and sun exposure.
Completed
-
Name Suburb Region/District Project Type Project Description Current
Status
Blaxland Road
cycleway
Ryde North District Walking and Cycling Shared Path cycleway alongside Blaxland Road Completed
Blaxland Station Refresh Package 3a
Blaxland North Rail The Station Refresh Program, within the Customer Experience Improvement Programs seeks to fulfil the
needs of the customer by investing in improvements to
the customer facilities and amebience at stations. The
eight elements of scope are: Bird Proofing, Cleaning,
Painting/Painting Stripping, LED Lighting, Toilet
refurbishments, Landscaping, Station Precient repairs
and Kit of Parts upgrade (Seats, Bins and Bubblers)
Completed
Boambee Creek Boat
Ramp Upgrade, Coffs
Harbour
Toormina North Coast Maritime Upgrade of the Boambee Creek boat ramp. Works include replacement of the old exisiting ramp with a new
precast concrete ramp and repairs to the upper section of
the ramp.
Planning
Boating Access
Improvements (New
Pontoons) at
Macksville
Macksville North Coast Maritime Improvements to boating infrastructure at River Street Reserve, Macksville. Works include the upgrade to the
existing timber jetty (including the installation of a roof),
the installation of a new pontoon and gangway facility
west of the jetty, and access improvements from the site's
toilets to the jetty and new pontoon.
Planning
Boating Access
Improvements at
Willoughby’s
Beach, Murray Valley
Regional Park
Deniliquin Riverina Murray Maritime Construction of a single lane concrete boat ramp at Willoughby's Beach for access to the Edward River for
small boats and non-powered watercraft (as this site is an
entry/exit point for the Edward River Canoe Trail). Other
works include the formalisation of a car park area at the
site.
Planning
-
Name Suburb Region/District Project Type Project Description Current
Status
Bobs Farm to Anna
Bay - Nelson Bay Road
Upgrade Stage 3
Bobs Farm Hunter Road Nelson Bay Road has been upgraded from Bobs Farm to
Anna Bay. Key features of the upgrade include provision
of a second carriageway between Cromarty Lane and
Port Stephens Drive roundabout, Anna Bay; rebuilding
the existing carriageway; landscaped median to separate
opposing traffic; ten upgraded bus bays; new u-turn
facilities to provide safe access to properties along the
route; pedestrian refuges in the median adjacent to bus
bays; wider shoulders; and improved intersections. The
upgrade has resulted in improved safety for motorists,
cyclists and pedestrians; better bays for bus passengers;
reduced traffic delays; and more reliable travel times for
motorists using this section of Nelson Bay Road.
Completed
Bohnock Boat Ramp
Facility Upgrade Bohnock Hunter Maritime Upgrade of the existing boat ramp facility at Bohnock.
Works include widening/extending the existing boat
ramp, the installation of an on-ramp centre pontoon,
extension and sealing of the car park, and the installation
of a fish cleaning table.
Planning
Bolivia Hill - New
England Highway
Upgrade
Bolivia New England North
West
Road Planning is underway to upgrade the New England
Highway at Bolivia Hill. The existing highway through
the area has narrow traffic lanes shoulders, with a rock
face on one side and a steep, rocky valley on the other.
The project involves building about 2.1 kilometres of
new road pavement, a new 320 metre long bridge that
avoids the creek line, 3.5 metre wide lanes in each
direction and widened road shoulders to improve safety.
Planning
Bomaderry (Nowra)
Interchange -
Commuter Parking
Bomaderry Illawarra
Shoalhaven
Parking Conversion of existing staff car park to provide six extra
commuter car parking spaces.
Completed
-
Name Suburb Region/District Project Type Project Description Current
Status
Bomaderry Station Refresh Package 2a
Bomaderry Eastern City Rail The Station Refresh Program, within the Customer Experience Improvement Programs seeks to fulfil the
needs of the customer by investing in improvements to
the customer facilities and amebience at stations. The
eight elements of scope are: Bird Proofing, Cleaning,
Painting/Painting Stripping, LED Lighting, Toilet
refurbishments, Landscaping, Station Precient repairs
and Kit of Parts upgrade (Seats, Bins and Bubblers)
Completed
Bombo Interchange -
Commuter Parking
Bombo Illawarra
Shoalhaven
Parking Conversion of existing staff car park to provide two extra
commuter car parking spaces.
Completed
Bondi Junction Station Refresh Package 1
Bondi Junction Central Coast Rail The Station Refresh Program, within the Customer Experience Improvement Programs seeks to fulfil the
needs of the customer by investing in improvements to
the customer facilities and amebience at stations. The
eight elements of scope are: Bird Proofing, Cleaning,
Painting/Painting Stripping, LED Lighting, Toilet
refurbishments, Landscaping, Station Precient repairs
and Kit of Parts upgrade (Seats, Bins and Bubblers)
Completed
Booth Street Annandale Eastern City Road Install illuminated pedestrian crossing signs at existing
Booth Street, Annandale raised pedestrian crossing.
Not Started
Bowling Alley Point
Boat Ramp Upgrade,
Chaffey Dam
Bowling Alley
Point
New England
North West
Maritime Planning
Bowral Interchange -
Commuter Parking
Bowral South East &
Tablelands
Parking Conversion of existing staff car park to provide one extra
commuter car parking space.
Completed
Bowral Station Refresh Package 4a
Bowral Central City Rail The Station Refresh Program, within the Customer Experience Improvement Programs seeks to fulfil the
needs of the customer by investing in improvements to
the customer facilities and amebience at stations. The
eight elements of scope are: Bird Proofing, Cleaning,
Painting/Painting Stripping, LED Lighting, Toilet
refurbishments, Landscaping, Station Precient repairs
and Kit of Parts upgrade (Seats, Bins and Bubblers)
Completed
-
Name Suburb Region/District Project Type Project Description Current
Status
Bradwardine Road
cycleway
Windradyne Central West &
Orana
Walking and Cycling Shared Path cycleway alongside Bradwardine Road Completed
Braidwood Truck Wash Upgrade
Braidwood South East and
Tablelands
Freight Install high pressure pump, upgrade lighting, upgrade fall on hardstand
Planning
Bridge Reserve Boat
Ramp Facility
Upgrade, Clarence
Town
Clarence Town Hunter Maritime Planning
Bridges for the Bush -
Program 2
Condobolin Central West &
Orana
Road Replacement of six heritage timber truss bridges (to
Higher Mass Limit standard) and upgrade of six heritage
timber truss bridges to provide ongoing safe service
levels. Addressing the state's deficient rural bridges is a
key priority for NSW investment as the bridges currently
present the most critical restrictions to freight access.
In-Progress
Brig O'Johnston Bridge
Upgrade - Bridges for
the Bush - Program 2
Clarence Town Hunter Road The bridge over the Williams River at Clarence Town
was built in 1880 and is the oldest surviving timber truss
bridge in NSW. Rehabilitation work is required to
strengthen the bridge to meet current vehicle loads and
heavy vehicle requirements, as well as help to reduce
future maintenance costs. The upgrade will improve road
freight productivity.
In-Progress
Briner Bridge Upgrade
- Bridges for the Bush -
Tranche 2
Ulmarra North Coast Road Briner Bridge, which was built in 1908, is a Dare truss bridge located between the villages of Ulmarra and
Tucabia on Coldstream Terrace. The single span bridge
crosses the Upper Coldstream River and is one of six
operable Dare truss bridges and one of two single-span
Dare truss bridges in NSW. Planning is under way to
ensure the upgrade work preserves important heritage
aspects of the structure.
Planning
-
Name Suburb Region/District Project Type Project Description Current
Status
Bringelly Road
Upgrade Stage 1 -
Camden Valley Way to
King Street
Leppington Western City
District
Road The Bringelly Road Upgrade will deliver new and
upgraded roads to support integrated transport in the
region and capitalise on the economic benefits from
developing a Western Sydney Airport at Badgerys
Creek. It will also improve safety, increase road capacity
and reduce congestion and travel times in the future. The
key features of Stage 1 include upgrading Bringelly
Road to a four lane divided road between Camden
Valley Way and King Street; east of the Upper Canal
bridge to Eastwood Road will be a six lane divided road;
an 80km/h speed limit and two metre wide shoulders;
three metre wide off-road shared pedestrian and cyclist
path; bus priority at traffic lights and indented bus bays;
extending the current noise wall on Cowpasture Road
240 metres along Camden Valley Way.
In-Progress
Bringelly Road
Upgrade Stage 2 - King
Street to The Northern
Road
Rossmore Western City
District
Road The Bringelly Road Upgrade will deliver new and
upgraded roads to support integrated transport in the
region and capitalise on the economic benefits from
developing a Western Sydney Airport at Badgerys
Creek. It will also improve safety, increase road capacity
and reduce congestion and travel times in the future. The
key features of Stage 2 include upgrading from two lanes
to a four lane divided road with a central median, which
would allow for widening to six lanes, when required; a
speed limit of 80 km/h; a three metre wide off road
shared pedestrian and cyclist path with crossings at
traffic lights to improve safety; designated turning lanes
at traffic lights along with bus priority and indented bus
bays on both sides of Bringelly Road; new signalised
intersections; and new bridges over South Creek.
In-Progress
Brisbane Water Drive Tascott Central Coast Road Install kerbside barrier (southbound) to prevent vehicles
from running onto shared pedestrian/cycle path on
Brisbane Water Drive, Tascott.
Completed
Broadmeadow
Interchange -
Commuter Parking
Broadmeadow Hunter Parking Conversion of existing staff car park to provide four
extra commuter car parking spaces.
Completed
-
Name Suburb Region/District Project Type Project Description Current
Status
Broadmeadow
Interchange - Transport
Access Program
Upgrade
Broadmeadow Hunter Interchange The upgrade to Broadmeadow Station includes three new
lifts located at Platform 2/3, Brown Road entrance and
Graham Road entrance; new weather protection canopies
at the station entrances and on Platform 2;
reconfiguration of the station entrances on Brown Road
and Graham Road; upgraded security features including
lighting and CCTV camera surveillance; improved
wayfinding signage including tactile signage for vision
impaired station users; footpath upgrades in the vicinity
of the station entrances on Brown Road and Graham
Road; a new electrical substation on Brown Road; and
power upgrades.
In-Progress
Broadmeadow Station Refresh Package 1a
Broadmeadow Illawarra Shoalhaven
Rail The Station Refresh Program, within the Customer
Experience Improvement Programs seeks to fulfil the
needs of the customer by investing in improvements to
the customer facilities and amebience at stations. The
eight elements of scope are: Bird Proofing, Cleaning,
Painting/Painting Stripping, LED Lighting, Toilet
refurbishments, Landscaping, Station Precient repairs
and Kit of Parts upgrade (Seats, Bins and Bubblers)
Completed
Broken Hill Truckwash Facility
Broken Hill Far West Freight Construction of new truckwash (greenfield project) in broken Hill. The truck wash will be a one bay facility to cater for up to B-Double. It is drive- through truck wash and is able to cater for longer vehicles up to A triples..The project will consist of:1. Civil and siteworks - bitumising of site, installation of stormwater drainage and fencing2. Provision of directory signage3. Construction of roofing for truckwash facility4. Structure plumbing and drainage works5. Sewer reticulation works6. Electrical and communication works7. Pumping and control systems8. Installation of water recycling unit9. Construction and installation of truckwash bay10. Installation of wheelwash units11. AVData connection to site to ensure linkage to other truckwash facilities.
Planning
-
Name Suburb Region/District Project Type Project Description Current
Status
Brooklyn Waterfront
Master Plan
(Development)
Brooklyn North Maritime Planning
Broughton Street
cycleway
Concord Eastern City
District
Walking and Cycling Shared Path cycleway alongside Broughton Street Completed
Browns Creek Non-
powered Boating
Access Improvements,
Taree
Taree Hunter Maritime Provision of a small craft launch site into the sheltered waters of Browns Creek for use by canoeist and
kayakers.
Planning
Brungle Road South Gundagai Riverina Murray Road Localised shoulder widening, W-beam Barrier,
delineation improvements
Completed
Brunswick Heads Boat
Harbour Master Plan
Development
Brunswick
Heads
North Coast Maritime Planning
Brunswick Street Boat
Ramp Upgrade, Ballina Ballina North Coast Maritime Installation of a pontoon at the existing boat ramp at
Riverview Park, Brunswick Street, Ballina. The project
also includes opportunities for investigation in to car
parking improvements at the site.
Planning
Brunswick Street
cycleway
Lismore Heights North Coast Walking and Cycling Shared Path cycleway alongside Brunswick Street Completed
Brushgrove Boat Ramp
and Car Park Upgrade
(Wingfield Bridge)
Cowper North Coast Maritime Replacement of the current boat ramp with a new boat ramp; and
construction of a new car park adjoining the boat ramp
and pontoon.
Planning
Budd Park Pontoon
Upgrade,
Murwillumbah
South
Murwillumbah
North Coast Maritime Upgrade and relocation of the existing pontoon at Budd Park to a more suitable location within the park.
Planning
Bulahdelah Bypass -
Pacific Highway
Upgrade
Bulahdelah Hunter Road The upgrade of the Pacific Highway at Bulahdelah
involved the construction of about 8.6 kilometres of four
lane divided road with an eastern bypass of the
Bulahdelah township.
Completed
-
Name Suburb Region/District Project Type Project Description Current
Status
Bullaburra, Ridge
Street to Genevieve
Road
Bullaburra Western City
District
Road The existing Great Western Highway was upgraded from
a two lane highway to a four lane divided highway from
west of Ridge Street, Lawson to 400 metres west of
Genevieve Road.
Completed
Bulli Interchange -
Commuter Parking
Bulli Illawarra
Shoalhaven
Parking Conversion of existing staff car park to provide two extra
commuter car parking spaces.
Completed
Bulli Road Toongabbie Central City Road Install pedestrian refuge island, street lighting, kerb and
gutter works on Bulli Road, East of Bungaree Road.
Completed
Bulli Station Refresh Package 4a
Bulli Central City Rail The Station Refresh Program, within the Customer Experience Improvement Programs seeks to fulfil the
needs of the customer by investing in improvements to
the customer facilities and amebience at stations. The
eight elements of scope are: Bird Proofing, Cleaning,
Painting/Painting Stripping, LED Lighting, Toilet
refurbishments, Landscaping, Station Precient repairs
and Kit of Parts upgrade (Seats, Bins and Bubblers)
Completed
Burnett Street -
Ledger Road
cycleway
Merrylands Central City
District
Walking and Cycling Shared Path cycleway alongside Burnett Street -
Ledger Road
Completed
Burnum Burnum
Sanctuary Boat Ramp
Upgrade, Woronora
Woronora South Maritime Upgrade of the existing boat ramp and installation of a new pontoon adjacent to the boat ramp at Burnum
Burnum Sanctuary, Woronora.
Planning
-
Name Suburb Region/District Project Type Project Description Current
Status
Burrill Lake Bridge -
Princes Highway
Upgrade
Burrill Lake Illawarra
Shoalhaven
Road Key features of the new bridge include a 290 metre long
bridge spanning the lake on a new alignment to the east
of the existing bridge; roundabouts on either side of the
crossing to connect the A1 Princes Highway to local
roads; a pedestrian and cycle path on the new bridge,
connecting to new paths on both sides and linking to the
Ulladulla cycle path; pedestrian paths underneath both
ends of the new bridge; the new bridge and highway
would be higher than the future 1 in 100 year flood level
and reduce the impact of flooding; complete removal of
the existing causeway and bridge; and a southern
foreshore park on the existing bridge approach.
In-Progress
Burwood Station Refresh Package 1
Burwood Central Coast Rail The Station Refresh Program, within the Customer Experience Improvement Programs seeks to fulfil the
needs of the customer by investing in improvements to
the customer facilities and amebience at stations. The
eight elements of scope are: Bird Proofing, Cleaning,
Painting/Painting Stripping, LED Lighting, Toilet
refurbishments, Landscaping, Station Precient repairs
and Kit of Parts upgrade (Seats, Bins and Bubblers)
Completed
Bus Priority
Infrastructure Program
Parramatta Central City
District
Bus Projects are being delivered along Sydney's most
important bus routes that make bus services faster and
more reliable. Measures include red bus lanes, bus
priority at traffic lights, changed parking restrictions and
clearways, and relocating bus stops.
In-Progress
Cabarita Wharf -
Wharf Upgrade
Program
Cabarita Eastern City
District
Maritime The wharf upgrade will provide improved customer
amenity such as better protection from the wind, rain and
sun, seating and waiting areas; improved safety for
customers; improved access for mobility impaired
customers and customers with prams; quicker and more
efficient boarding and disembarking; increased wharf
capacity for future growth of ferry services; more
efficient interchanges with other modes of transport, both
public and private; and better way finding signage.
Planning
-
Name Suburb Region/District Project Type Project Description Current
Status
Cabramatta
Interchange -
Commuter Parking
Cabramatta Western City
District
Parking Conversion of existing staff car park to provide seven
extra commuter car parking spaces.
Completed
Camden Haven River
Recreational Boating
Facilities Study
(Investigation)
Dunbogan North Coast Maritime Funding to undertake a review of existing Council managed boating facilities on the Camden Haven River.
The study is to include a condition assessment of
recreational boating infrastructure; community
consultation on existing facilities; review of population
and boating demand forecasts and identification of future
site upgrades and site redundancies.
Planning
Camden Street
cycleway
Wilton Western City
District
Walking and Cycling Shared Path cycleway alongside Camden Street Completed
Camden Valley Way
Upgrade
Leppington Western City
District
Road Camden Valley Way was upgraded between Oran Park
Drive and Bringelly Road. The key features of the
project included two lanes upgraded to a four lane
divided road; a posted vehicle speed limit of 80 km/h; a
three metre wide, off-road shared pedestrian/cyclist path
on the western side of the road; traffic lights at Forest
Lawn Memorial Gardens Cemetery, Cowpasture Road
South, Heath Road, St Andrews Road, Raby Road,
Catherine Field Road and Springfield Road; the
realignment of Denham Court Road and Ingleburn Road
to a four-way intersection with traffic lights; temporary
u-turn facilities located opposite traffic lights at the
intersections of Forest Lawn Memorial Gardens
Cemetery and St Andrews Road; new bridges; and bus
priority capability at traffic lights and indented bus bays
on each side of Camden Valley Way.
Completed
Campbelltown
Interchange -
Commuter Parking
Campbelltown Western City
District
Parking Conversion of existing staff car park to provide 154 extra
commuter car parking spaces.
Completed
Campbelltown
Interchange -
Commuter Parking
Campbelltown Western City
District
Parking Car park with an extra 450 parking spaces. In-Progress
-
Name Suburb Region/District Project Type Project Description Current
Status
Campbelltown Road,
Camden Valley Way to
Denham Court Road
Edmondson Park Western City
District
Road Planning and designing is underway for a proposed
upgrade of Campbelltown Road between Hume Highway
/ Camden Valley Way, Casula and Brooks Road,
Denham Court. Key features of the proposed upgrade
include an upgrade from a generally two lane to a four
lane divided road with a central median; a wide central
median which will allow room for widening to six lanes,
if required in the future, between The Hume Motorway
overbridge and Zouch Road; new signalised
intersections; an off-road shared pedestrian/cyclist path
generally on the western side of Campbelltown Road;
designated turning lanes and bicycle and pedestrian
crossing provisions at traffic lights; and an additional
bridge over the M31 Hume Motorway to allow for the
widening of Campbelltown Road. The construction
phase of the project will be undertaking in stages. The
first stage will be approximately 1.2 kilometre section
between from East Town Road Centre and to New
Macdonald Road.
Planning
Campsie Interchange -
Commuter Parking
Campsie South District Parking Conversion of existing staff car park to provide two extra
commuter car parking spaces.
Completed
Campsie Interchange -
Transport Access
Program Upgrade
Campsie South District Interchange Improvements to the transport interchange facilities at
Campsie Station included seating at the eastbound bus
stops on South Parade; improving bus stops on South
Parade for customer safety and comfort; improving
footpath pavements on route to and at the three on-street
commuter car parks; installing clear and direct way-
finding signage; and installing disabled car parking
spaces on North Parade, including lighting upgrades.
Completed
Canal Street
cycleway
Leeton Riverina - Murray Walking and Cycling Shared Path cycleway alongside Canal Street Completed
-
Name Suburb Region/District Project Type Project Description Current
Status
Canberra Station Refresh Package 1a
Kingston ACT Illawarra Shoalhaven
Rail The Station Refresh Program, within the Customer
Experience Improvement Programs seeks to fulfil the
needs of the customer by investing in improvements to
the customer facilities and amebience at stations. The
eight elements of scope are: Bird Proofing, Cleaning,
Painting/Painting Stripping, LED Lighting, Toilet
refurbishments, Landscaping, Station Precient repairs
and Kit of Parts upgrade (Seats, Bins and Bubblers)
Completed
Canley Vale
Interchange -
Commuter Parking
Canley Vale Western City
District
Parking New multi-storey commuter car park providing 122
commuter car parking spaces including a lift, stairs,
lighting and CCTV cameras.
Completed
Canley Vale
Interchange -
Commuter Parking
Canley Vale Western City
District
Parking Conversion of existing staff car park to provide two extra
commuter car parking spaces.
Completed
Canley Vale
Interchange - Transport
Access Program
Upgrade
Canley Vale Western City
District
Interchange Improvements to accessibility at Canley Vale Station
included the construction of new accessible ramps on
both sides of the station, new stairs and bike racks on
both sides of the station, and improved safety through
additional CCTV surveillance cameras and lighting, new
tactiles on the platform, new handrails and signage.
Completed
Canley Vale Road Canley Heights Western City Road Upgrade existing raised pedestrian crossing west of
Ascot Street, Canley Heights to improve its accessibility
and safety of pedestrians. The works will ensure a flat
transition between footpath and the raised platform and
relocate the drainage lintel and
Not Started
Canley Vale Road
cycleway
Canley Heights Western City
District
Walking and Cycling Shared Path cycleway alongside Canley Vale Road Completed
Canley Vale Station Refresh Package 4
Canley Vale Western City Rail The Station Refresh Program, within the Customer Experience Improvement Programs seeks to fulfil the
needs of the customer by investing in improvements to
the customer facilities and amebience at stations. The
eight elements of scope are: Bird Proofing, Cleaning,
Painting/Painting Stripping, LED Lighting, Toilet
refurbishments, Landscaping, Station Precient repairs
and Kit of Parts upgrade (Seats, Bins and Bubblers)
Completed
-
Name Suburb Region/District Project Type Project Description Current
Status
Captain Cook Bridge
South Boating Access
Improvements
(Investigation), Taren
Point
Taren Point South Maritime Passive craft launching facility including a jetty for both passive craft and small vessel access. Upgrade to
foreshore and provision of a seating area and kayak
assembly point.
Planning
Captain Cook Park
Boating Facilities
Improvements
(Investigation), Ballina
Ballina North Coast Maritime Investigation into the installation of a new pontoon at Captain Cook Park for short term boat mooring and
passenger exchange.
Planning
Cargo Movement
Coordination Centre
Botany Bay Eastern City
District
Rail The NSW Cargo Movement Coordination Centre is
working with industry to optimise how cargo moves
through Port Botany, Port Kembla and regional NSW
across supply chain interfaces and networks. It aims to
better coordinate the activities of operators across the
landside cargo transport chain – including stevedores,
road and rail freight operators, network operators and
terminals – to create a more efficient, higher performing
freight network which maximises existing capacity. The
centre is focused on the state-wide freight network; bulk
commodities (such as grain and coal) as well as
container freight; and key supply chain interfaces (ports,
road, rail and intermodal terminals). It will help towards
the target of doubling rail’s mode share of container
movements through NSW ports by 2020.
In-Progress
Caringbah Interchange
- Transport Access
Program Upgrade
Caringbah South District Interchange New steel canopies were installed on the station platform
to provide better protection for customers against rain
and sun exposure.
Completed
Caringbah Station Refresh Package 1
Caringbah Central Coast Rail The Station Refresh Program, within the Customer Experience Improvement Programs seeks to fulfil the
needs of the customer by investing in improvements to
the customer facilities and amebience at stations. The
eight elements of scope are: Bird Proofing, Cleaning,
Painting/Painting Stripping, LED Lighting, Toilet
refurbishments, Landscaping, Station Precient repairs
and Kit of Parts upgrade (Seats, Bins and Bubblers)
Completed
-
Name Suburb Region/District Project Type Project Description Current
Status
Carlingford
Interchange -
Commuter Parking
Carlingford Central City
District
Parking Commuter car park providing up to 150 new spaces. Planning
Caroline Chisholm
Drive
Winston Hills Central City Road Install a refuge island in Caroline Chisolm Drive west of
Hilcrest Avenue, Winston Hills. The proposed works
includes conversion of an existing traffic island to a
refuge island, with upgrades of existing kerb ramps and
street lighting infrastructure.
Completed
Carramar Station Refresh Package 1
Carramar Central Coast Rail The Station Refresh Program, within the Customer Experience Improvement Programs seeks to fulfil the
needs of the customer by investing in improvements to
the customer facilities and amebience at stations. The
eight elements of scope are: Bird Proofing, Cleaning,
Painting/Painting Stripping, LED Lighting, Toilet
refurbishments, Landscaping, Station Precient repairs
and Kit of Parts upgrade (Seats, Bins and Bubblers)
Completed
Carrington Boat Ramp
Facility Improvements
(Investigation)
Carrington Hunter Maritime Planning
Carrington Road
cycleway
Marrickville Eastern City
District
Walking and Cycling Bicycle Path cycleway alongside Carrington Road Completed
Cary Street Toronto Hunter Road Install pedestrian fencing Design Only
Completed
Casino Interchange -
Transport Access
Program Upgrade
Casino North Coast Interchange Construction of a new taxi rank and relocation of
existing car parking spaces.
Completed
Casino Station Refresh Package 2a
Casino Eastern City Rail The Station Refresh Program, within the Customer Experience Improvement Programs seeks to fulfil the
needs of the customer by investing in improvements to
the customer facilities and amebience at stations. The
eight elements of scope are: Bird Proofing, Cleaning,
Painting/Painting Stripping, LED Lighting, Toilet
refurbishments, Landscaping, Station Precient repairs
and Kit of Parts upgrade (Seats, Bins and Bubblers)
Completed
-
Name Suburb Region/District Project Type Project Description Current
Status
Castle Hill -
Showground Road
Upgrade
Castle Hill Central City
District
Road Showground Road is being upgraded between Carrington
Road and Old Northern Road, Castle Hill from a two
lane to a four lane divided road to reduce congestion and
increase traffic capacity to meet predicted growth from
development in the area. Key features include widening
of Showground Road to at least four lanes between
Carrington Road and Old Northern Road with additional
turning lanes at key intersections; upgrading the
intersection of Showground Road and Pennant Street to
include additional turning lanes and a bus priority
measure; installing new traffic lights at the intersections
of Showground Road with Rowallan Avenue and
Cheriton Avenue; changing the intersection of
Showground Road and Britannia Road to left-in/left-out
access; installing a central concrete median with
landscaped planter bays at a number of locations along
the road; and providing a concrete footpath to both sides
of the road between Carrington Road and Pennant Street.
In-Progress
Cattai Ridge Road Glenorie Central City Road Install roadside w-beam barrier and and CAMS Completed
-
Name Suburb Region/District Project Type Project Description Current
Status
CBD and South East
Light Rail
Moore Park Eastern City
District
Light Rail The CBD and South East Light Rail is a new light rail
network for Sydney, currently under construction. The
12 kilometre route will feature 19 stops, extending from
Circular Quay along George Street to Central Station,
through Surry Hills to Moore Park, then to Kensington
and Kingsford via Anzac Parade, and Randwick via
Alison Road and High Street. Key features include high
frequency ‘turn up and go’ light rail services operating
every four minutes in the peak in the CBD, and every
eight minutes in the peak from Moore Park to Randwick
and Kensington; reliable and high-capacity services;
additional special event services between Central and the
Moore Park and Alison Road stops; a one-kilometre
pedestrian zone along George Street, between Hunter
and Bathurst Streets; and a fleet of electric-powered light
rail vehicles with air conditioning and accessible low-
floor design.
In-Progress
Centennial Park
cycleway
Woollahra Eastern City
District
Walking and Cycling Shared Path cycleway alongside Centennial Park Completed
Central Coast
Highway, Brisbane
Water Drive, Manns
Road Intersection
Upgrade
West Gosford Central Coast Road The upgrade provides a range of benefits for businesses,
motorists and the community, including: the newly
aligned intersection at Brisbane Water Drive and Manns
Road will substantially improve traffic flow and improve
access to local businesses; the Central Coast Highway
westbound exit ramp onto the newly constructed Grieve
Close underpass will provide improved access to local
businesses; the traffic lights at Manns Road and Grieve
Close intersection will provide access into Grieve Close
and the link road connecting to Dyer Crescent; improved
access to new developments including the Riverside
Park; urban design improvements will improve the visual
appeal and amenity in the commercial area; and shared
pedestrian and cycle paths along the Central Coast
Highway, Manns Road and Brisbane Water Drive will
improve connectivity to existing paths.
Completed
-
Name Suburb Region/District Project Type Project Description Current
Status
Central Coast
Highway, Carlton Road
to Ocean View Drive
Erina Heights Central Coast Road The upgrade of the Central Coast Highway between
Carlton Road, Erina Heights and Ocean View Drive,
Wamberal involved widening to two lanes in each
direction. The project improves safety for motorists,
cyclists and pedestrians; increases capacity to improve
traffic flow and reduce travel times and congestion;
improves access for public transport; and formalises
parking arrangements.
Completed
Central Coast
Highway, Frederick
Street Intersection
Upgrade
East Gosford Central Coast Road The upgrade involved road widening to provide a
dedicated right turn lane eastbound on the Central Coast
Highway (York Street) into Frederick Street (south) to
reduce queues during peak periods; extensions of the
shared pedestrian/cycle paths and pedestrian facilities on
the southern side of the intersection to Albany Street;
adjustments to traffic light phasing to allow extra time
for pedestrians to cross before traffic proceeds; and
stormwater drainage improvements and utility
relocations.
Completed
Central Coast
Highway, Racecourse
Road Intersection
Upgrade
West Gosford Central Coast Road The upgrade includes the following improvements:
providing a left turn lane with traffic light control on the
Central Coast Highway (eastbound) for vehicles turning
on to Racecourse Road. This will allow for an additional
through lane for motorists travelling east on the highway;
providing a left turn lane with traffic light control on
Racecourse Road (southbound) for vehicles turning onto
the Central Coast Highway. This will separate left
turning traffic from through and right turning traffic to
provide extra capacity for this leg of the intersection;
providing a new pedestrian crossing on the western leg
of the Central Coast Highway and installing pedestrian
traffic lights within the median on Racecourse Road
(southbound); and providing a 2.5 metre wide shared
path along the northern side of the Central Coast
Highway and extending along Racecourse Road to allow
cyclists and pedestrians to safety cross the road.
In-Progress
-
Name Suburb Region/District Project Type Project Description Current
Status
Central Coast
Highway, Wisemans
Ferry Road Intersection
Upgrade
Somersby Central Coast Road Key features of the upgrade include lengthening the
existing right turn lane and providing a second right turn
lane from the Central Coast Highway (from Gosford)
into Wisemans Ferry Road, to reduce queuing and
improve safety; providing an additional left turn lane
with both lanes under traffic light control from
Wisemans Ferry Road into the Central Coast Highway
(to Gosford), to improve safety by removing the need to
merge; providing a continuous lane on Wisemans Ferry
Road for southbound vehicles exiting the M1 Pacific
Motorway heading towards the Central Coast Highway
to improve safety by removing the need to merge;
providing a new right turn lane from Wisemans Ferry
Road onto the northbound on-ramp of the M1 Pacific
Motorway to improve safety by separating traffic
movements; providing a new car pool car park with
approximately 100 parking spaces; and providing an off
road cycle path between Wisemans Ferry Road and
Kangoo Road.
Completed
Central Interchange -
Transport Access
Program Upgrade
Haymarket Eastern City
District
Interchange Installation of lifts and construction of accessible ramps. Completed
Cessnock Road Weston Hunter Road Install raised island with additional give way sign and
move give way line forward using kerb extensions
Completed
-
Name Suburb Region/District Project Type Project Description Current
Status
Charles Kay Drive and
Brunswick Road Safety
Improvements
Terrigal Central Coast Road The Terrigal Drive intersections at Charles Kay Drive
and Brunswick Road were improved to improve safety
and traffic flow along Terrigal Drive. Key features of the
upgrade include new traffic lights at the Charles Kay
Drive and Brunswick Road intersections; widening
Terrigal Drive between Duffys Road and Charles Kay
Drive to provide two through lanes in each direction and
additional left and right turn lanes out of Charles Kay
Drive; providing a shared pedestrian and cycle path on
the southern side of Terrigal Drive between Duffys Road
and Bellbird Avenue; and providing pedestrian traffic
lights east of Duffys Road to improve safety for
pedestrians crossing Terrigal Drive.
Completed
Charleyong Bridge
Replacement - Bridges
for the bush - Tranche
2
Tomboye South East and Tablelands
Road The Charleyong Bridge is a single-span Allen truss
timber bridge built in 1901, which crosses the
Mongarlowe River at Marlowe. The bridge is located
on Main Road 92 connecting Braidwood and Nowra via
Nerriga, which is a regionally important link for goods,
quarried material and stock between Nowra, Braidwood
and Canberra. The bridge is proposed to be replaced as
it does not meet current loading standards and has
become increasingly expensive to maintain.
Replacement of the bridge would greatly improve
regional and local freight route continuity and allow
Higher Mass Limit Vehicles to use the road.
Planning
Chatham Road Eastwood North Road Install high friction surface, CAMs and RRPMs Completed
Chester Hill Station Refresh Package 1
Chester Hill Central Coast Rail The Station Refresh Program, within the Customer Experience Improvement Programs seeks to fulfil the
needs of the customer by investing in improvements to
the customer facilities and amebience at stations. The
eight elements of scope are: Bird Proofing, Cleaning,
Painting/Painting Stripping, LED Lighting, Toilet
refurbishments, Landscaping, Station Precient repairs
and Kit of Parts upgrade (Seats, Bins and Bubblers)
Completed
-
Name Suburb Region/District Project Type Project Description Current
Status
Chiswick Wharf -
Wharf Upgrade
Program
Chiswick Eastern City
District
Maritime The wharf upgrade will provide improved customer
amenity such as better protection from the wind, rain and
sun, seating and waiting areas; improved safety for
customers; improved access for mobility impaired
customers and customers with prams; quicker and more
efficient boarding and disembarking; increased wharf
capacity for future growth of ferry services; more