Slide 1 of 2130. Cementing cont’d PETE 411 Well Drilling
PETE 411Well Drilling
Lesson 30
Cementing cont’d
Slide 2of 2130. Cementing cont’d PETE 411 Well Drilling
Cementing cont’d
u Large-Hole Cementingn Through Casing
n Through Drill Pipe
n Through Grout Pipe
u Cementing of Liner
u Cementing from Floater
uMultistage Cementing
u Cement Bond Log
Slide 3 of 2130. Cementing cont’d PETE 411 Well Drilling
Read:
Applied Drilling Engineering Ch. 3. Cementing
HW #15 – Kick – W&W
Due November 12, 2001
Slide 4of 2130. Cementing cont’d PETE 411 Well Drilling
QUIZ B
Thursday, November 15, 2001
7 - 9 p.m.
Rich 101
Slide 5 of 2130. Cementing cont’d PETE 411 Well Drilling
Large-Hole
Cementing
NormalDisplacement
Method
• Down the inside of the Csg.
• Use two wiper plugs
• Takes a long time . . .
• Large surface area exposed
to the cmt.Slide 6of 2130. Cementing cont’d PETE 411 Well Drilling
Large-Hole
Cementing
Inner String
Cementing
• Down the inside of the DP
• Use top wiper plug
• Stab-in adapter
• Much shorter displ. time
-
8/18/2019 30. Cementing - Cont'd
2/4
-
8/18/2019 30. Cementing - Cont'd
3/4
3
Slide 13of 2130. Cementing cont’d PETE 411 Well Drilling
Opening
Bomb Closing
PlugStage
Collar
Cementing
Basket
Slide 14of 2130. Cementing cont’d PETE 411 Well Drilling
Cm t
Cm t
Mud
Slide 15of 2130. Cementing cont’d PETE 411 Well Drilling
BAD
GOOD
Slide 16of 2130. Cementing cont’d PETE 411 Well Drilling
Before
Squeeze
After
Squeeze
Slide 17of 2130. Cementing cont’d PETE 411 Well Drilling Slide 18of 2130. Cementing cont’d PETE 411 Well DrillingTieback liner showing sealing nipple
-
8/18/2019 30. Cementing - Cont'd
4/4
4
Slide 19of 2130. Cementing cont’d PETE 411 Well Drilling
Liner and sealing nipple
1. Reinforcing the intermediate casingworn by drilling.
2. Providing greater resistance tocollapse stress from abnormalpressures.
3. Providing corrosion protection.
4. Sealing an existing liner which maybe leaking gas.
Slide 20of 2130. Cementing cont’d PETE 411 Well Drilling
DelayedSet
Cementing
Slide 21of 2130. Cementing cont’d PETE 411 Well Drilling
ReverseCirculating
Cementing